Search results

1 – 10 of 239
Article
Publication date: 12 March 2020

Tofigh Hamidavi, Sepehr Abrishami, Pasquale Ponterosso, David Begg and Nikos Nanos

The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform…

Abstract

Purpose

The paper aims to leverage the importance of the integrated automatic structural design for tall buildings at the early stage. It proposes to use an automatic prototype to perform the structural design, analysis and optimisation in a building information modelling (BIM)-based platform. This process starts with extracting the required information from the architectural model in Revit Autodesk, such as boundary conditions and designs different options of the structural models in Robot Autodesk. In this process, Dynamo for Revit is used to define the mathematical functions to use different variables and generate various structural models. The paper aims to expand the domain of automation in the BIM platform to reduce the iterative process in different areas such as conceptual structural design and collaboration between architects and structural engineers to reduce the time and cost at the early stages.

Design/methodology/approach

The paper begins with an exploratory research by adopting a qualitative methodology and using open-ended questions to achieve more information about the phenomenon of automation and interoperability between structural engineers and architects and gain new insight into this area. Furthermore, correlation research is used by adopting quantitative and short questions to compare the proposed prototype with the traditional process of the structural design and optimisation and the interoperability between architects and engineers and consequently, validate the research.

Findings

As an outcome of the research, a structural design optimisation (SDO) prototype was developed to semi-automate the structural design process of tall buildings at the early stages. Moreover, the proposed prototype can be used during the early stage of structural design in different areas such as residential buildings, bridges, truss, reinforced concrete detailing, etc. Moreover, comprehensive literature regarding using automation in structural design, optimisation process and interoperability between architects and engineers is conducted that provides a new insight to contribute to future research and development.

Research limitations/implications

Due to the time limit, the paper results may lack in a comprehensive automatic structural design process. Therefore, the researchers are encouraged to expand the workability of the prototype for a comprehensive automatic design check such as automatic design for the minimum deflection, displacement of different types of buildings.

Practical implications

The prototype includes implications for the development of different automatic designs.

Originality/value

The focus of this paper is the optimisation of the structural design in the BIM platform by using automation. This combination is one of the novelties of this paper, and the existing literature has a very limited amount of information and similar work in this area, especially interoperability between architects and engineers.

Article
Publication date: 17 May 2022

Md Hamidul Islam, Md. Abu Safayet and Abdullah Al Mamun

In response to rising energy prices and growing environmental concerns, there is a growing demand for environmentally friendly building facilities. This study investigates…

Abstract

Purpose

In response to rising energy prices and growing environmental concerns, there is a growing demand for environmentally friendly building facilities. This study investigates optimizing energy consumption and improves the level of accuracy when selecting suitable materials and components with minimal impact on the overall energy consumption of buildings.

Design/methodology/approach

This study was carried out from the perspective of an educational building's energy simulation, using a validated building energy analysis tool Green Building Studio (GBS). There were eight parameters analyzed considering at least two connected variables without measuring the initial building configuration. After that, Autodesk Revit and Insight 360 were used to make similar scenarios of the best performance selections so that the general results could be compared and the initial hypothesis could be proven.

Findings

In this study, the initial building analysis showed that there was an annual energy use of 139 kBtu/sf and the estimated carbon emissions were about 156 tons/yr. After the parametric analysis, the maximum energy saving was about 32.38%, considering the best performance scenario with a reduction of CO2 emissions of around 28.85%.

Originality/value

The outcome of this study will help Bangladeshi architect/designers to make appropriate decisions regarding the selection of suitable building materials and components at the initial stage of any project in terms of the energy consumption aspects. In addition, energy-efficient buildings provide cleaner combustion and better circulation than traditional buildings, that is why they reduce indoor air pollution, maintaining a safe, healthy and sustainable environment for future generations.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 11 November 2020

Md. Jewel Rana, Md. Rakibul Hasan, Md. Habibur Rahman Sobuz and Norsuzailina Mohamed Sutan

This study investigates the impact and economic viability of energy-efficient building envelope and orientation for contributing net zero energy building (NZEB) and suggests…

Abstract

Purpose

This study investigates the impact and economic viability of energy-efficient building envelope and orientation for contributing net zero energy building (NZEB) and suggests optimum thermal insulation thickness, optimum wall thickness, appropriate orientation and glazing types of window in the contexts of unique Bangladeshi subtropical monsoon climate.

Design/methodology/approach

The whole study was conducted through energy simulation perspective of an existing office building using building information modeling (BIM) and building energy modeling (BEM) tools which are Autodesk Revit 2017, Autodesk Green Building Studio (GBS) and eQUEST. Numerous simulation patterns were created for energy simulation considering building envelope parameters and orientations. A comprehensive data analysis of simulation results was conducted to sort out efficient passive design strategies.

Findings

The optimum thermal mass and thermal insulation thickness are 6.5 and 0.5 inches, respectively, considering energy performance and economic viability. This study highly recommends that a building should be designed with a small window-to-wall ratio in the south and west face. The window should be constructed with double glazing Low-E materials to reduce solar heat gain. The studied building saves 9.14% annual energy consumption by incorporating the suggested passive design strategies of this study.

Originality/value

The output of this work can add some new energy-efficient design strategies to Bangladesh National Building Code (BNBC) because BNBC has not suggested any codes or regulations regarding energy-efficient passive design strategies. It will also be useful to designers of Bangladesh and other countries with similar subtropical climatic contexts which are located in Southeast Asia and Northern Hemisphere of Earth.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 9 July 2020

Sepehr Abrishami, Jack Goulding and Farzad Rahimian

The integration and automation of the whole design and implementation process have become a pivotal factor in construction projects. Problems of process integration, particularly…

1313

Abstract

Purpose

The integration and automation of the whole design and implementation process have become a pivotal factor in construction projects. Problems of process integration, particularly at the conceptual design stage, often manifest through a number of significant areas, from design representation, cognition and translation to process fragmentation and loss of design integrity. Whilst building information modelling (BIM) applications can be used to support design automation, particularly through the modelling, amendment and management stages, they do not explicitly provide whole design integration. This is a significant challenge. However, advances in generative design now offer significant potential for enhancing the design experience to mitigate this challenge.

Design/methodology/approach

The approach outlined in this paper specifically addresses BIM deficiencies at the conceptual design stage, where the core drivers and indicators of BIM and generative design are identified and mapped into a generative BIM (G-BIM) framework and subsequently embedded into a G-BIM prototype. This actively engages generative design methods into a single dynamic BIM environment to support the early conceptual design process. The developed prototype followed the CIFE “horseshoe” methodology of aligning theoretical research with scientific methods to procure architecture, construction and engineering (AEC)-based solutions. This G-BIM prototype was also tested and validated through a focus group workshop engaging five AEC domain experts.

Findings

The G-BIM prototype presents a valuable set of rubrics to support the conceptual design stage using generative design. It benefits from the advanced features of BIM tools in relation to illustration and collaboration (coupled with BIM's parametric change management features).

Research limitations/implications

This prototype has been evaluated through multiple projects and scenarios. However, additional test data is needed to further improve system veracity using conventional and non-standard real-life design settings (and contexts). This will be reported in later works.

Originality/value

Originality and value rest with addressing the shortcomings of previous research on automation during the design process. It also addresses novel computational issues relating to the implementation of generative design systems, where, for example, instead of engaging static and formal description of the domain concepts, G-BIM actively enhances the applicability of BIM during the early design stages to generate optimised (and more purposeful) design solutions.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 November 2020

Sahin Akin, Oguzcan Ergun, Elif Surer and Ipek Gursel Dino

In performative architectural design, daylighting is a crucial design consideration; however, the evaluation of daylighting in the design process can be challenging. Immersive…

Abstract

Purpose

In performative architectural design, daylighting is a crucial design consideration; however, the evaluation of daylighting in the design process can be challenging. Immersive environments (IEs) can create a dynamic, multi-sensory, first-person view in computer-generated environments, and can improve designers' visual perception and awareness during performative design processes. This research addresses the need for interactive and integrated design tools for IEs toward better-performing architectural solutions in terms of daylighting illumination. In this context, building information modeling and performance simulations are identified as critical technologies to be integrated into performative architectural design.

Design/methodology/approach

This research adopts a design science research (DSR) methodology involving an iterative process of development, validation and improvement of a novel and immersive tool, HoloArch, that supports design development during daylighting-informed design processes. HoloArch was implemented in a game engine during a spiral software development process. HoloArch allows users to interact with, visualize, modify and explore architectural models. The evaluation is performed in two workshops and a user study. A hybrid approach that combines qualitative and quantitative data collection was adopted for evaluation. Qualitative data analyses involve interviews, while quantitative data analyses involve both daylighting simulations and questionnaires (e.g. technology acceptance model (TAM), presence and system usability scale (SUS)).

Findings

According to the questionnaire results, HoloArch had 92/100 for SUS, a mean value of 120.4 for presence questionnaire (PQ) and 9.4/10 for TAM. According to the simulation results, all participants improved the given building's daylighting performance using HoloArch. The interviews also indicated that HoloArch is an effective design tool in terms of augmented perception, continuous design processes, performative daylighting design and model interaction. However, challenges still remain regarding the complete integration of tools and simultaneous simulation visualization. The study concludes that IEs hold promising potentials where performative design actions at conceptual, spatial and architectural domains can take place interactively and simultaneously with immediate feedback.

Originality/value

The research integrates building information modeling (BIM), performative daylighting simulations and IEs in an interactive environment for the identification of potentials and limitations in performative architectural design. Different from existing immersive tools for architecture, HoloArch offers a continuous bidirectional workflow between BIM tools and IEs.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 April 2024

Jhumana Akter, Mobasshira Islam and Shuvo Dip Datta

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This…

Abstract

Purpose

Determining the suitable material and accurate thickness of the thermal insulation layer used in exterior walls during the design phase of a building can be challenging. This study aims to determine suitable material and optimum thickness for the insulation layer considering both operational and embodied factors by a comprehensive assessment of the energy, economic and environmental (3E) parameters.

Design/methodology/approach

First, the energy model of an existing building was created by using Autodesk Revit software according to the as-built floor layout to evaluate the impact of five alternative insulating materials in varying thickness values. Second, using the results derived from the model, a thorough evaluation was conducted to ascertain the optimal insulation material and thickness through individual analysis of 3E factors, followed by a comprehensive analysis considering the three aforementioned factors simultaneously.

Findings

The findings indicated that polyurethane with 13 cm thickness, rockwool with 10 cm thickness and EPS with 20 cm thickness were the best states based on energy consumption, cost and environmental footprint, respectively. After completing the 3E investigation, the 15-cm-thick mineral wool insulation was presented as the ideal state.

Practical implications

This study explores how suitable material and thickness of insulating material can be determined in advance during the design phase of a building, which is a lot more accurate and cost-effective than applying insulating materials by assumed thickness in the construction phase.

Originality/value

To the best of the authors’ knowledge, this paper is unique in investigating the advantages of using thermally insulating materials in the context of a mosque structure, taking into account its distinctive attributes that deviate from those of typical buildings. Furthermore, there has been no prior analysis of the cost and sustainability implications of these materials concerning the characteristics of subtropical monsoon climate.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 May 2023

Altayeb Qasem and Abdulaziz Saud Almohassen

This study aims to develop a constructability index (CI) that can ease the construction activities in a project based on the contractors’ experience and resources. The proposed CI…

Abstract

Purpose

This study aims to develop a constructability index (CI) that can ease the construction activities in a project based on the contractors’ experience and resources. The proposed CI is a vital decision support tool that quantifies the difficulty level for the contractor to execute certain activities with the contingency of other project elements. The virtual reality (VR) technology was used to provide additional data, communicate the contingency impact of other project elements on specific activities and provide sequential execution data to the contractors. This can minimize the risk of not being able to execute various activities on time and within the budget.

Design/methodology/approach

The VR-based CI was developed through two steps. Step 1 was to identify the factors affecting constructability by exploring the literature and consulting local construction experts. These factors were then organized through a hierarchy of main factors and subfactors and validated by local experts through predesigned surveys. The factors were classified into VR dependent or non-VR independent, and their relative weights were calculated using the analytical hierarchy process along with their reliability, which was determined using Cronbach’s alpha approach. Step 2 was to define the attributes for the constructability factors defined in Step 1 using the Multi Attribute Utility Theory to quantify the contractor’s compliance level of these factors by giving them the appropriate score. The utility factors for the VR-independent factors were obtained through standards, literature and local surveys, and they were quantified on a 1–10 scale. However, the VR-dependent factors were given their corresponding scores using the developed VR navigation environment generated by integrating Autodesk Revit and Navisworks software. Accordingly, the CI for each activity was evaluated, and the overall CI for the project was calculated by aggregating the CIs for all activities.

Findings

The developed CI quantifies the contractor’s ability to execute construction projects and addresses the lack of communication and coordination between the various construction units in the planning phase itself. Moreover, it can resolve possible hard (physical) and soft (time) construction clashes and minimize their impacts on project schedule and budget. Among the relative weights of the identified factors, prefabrication of building components was found to have the highest effect on constructability. Furthermore, applying the developed VR-CI, a real project showed that the utility values of the main factors quantified on a ten-point scale were between 6 and 9, which means routine supervisions and monitoring are required.

Originality/value

Though the concepts of constructability and VR have been used in different contexts, their integration to develop a comprehensive CI for the building construction industry is a unique contribution, which has not been reported previously.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 January 2024

Caroline Silva Araújo, Emerson de Andrade Marques Ferreira and Dayana Bastos Costa

Tracking physical resources at the construction site can generate information to support effective decision-making and building production control. However, the methods for…

Abstract

Purpose

Tracking physical resources at the construction site can generate information to support effective decision-making and building production control. However, the methods for conventional tracking usually offer low reliability. This study aims to propose the integrated Smart Twins 4.0 to track and manage metallic formworks used in cast-in-place concrete wall systems using internet of things (IoT) (operationalized by radio frequency identification [RFID]) and building information modeling (BIM), focusing on increasing quality and productivity.

Design/methodology/approach

Design science research is the research approach, including an exploratory study to map the constructive system, the integrated system development, an on-site pilot implementation in a residential project and a performance evaluation based on acquired data and the perception of the project’s production team.

Findings

In all rounds of requests, Smart Twins 4.0 registered and presented the status from the formworks and the work progress of buildings in complete correspondence with the physical progress providing information to support decision-making during operation. Moreover, analyses of the system infrastructure and implementation details can drive researchers regarding future IoT and BIM implementation in real construction sites.

Originality/value

The primary contribution is the system proposal, centralized into a mobile app that contains a Web-based virtual model to receive data in real time during construction phases and solve a real problem. The paper describes Smart Twins 4.0 development and its requirements for tracking physical resources considering theoretical and practical previous research regarding RFID, IoT and BIM.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 June 2023

Abdullah Ehtesham Akbar and Mohammad A. Hassanain

This paper aims to present a systematic review of the published literature on building information model (BIM)-based simulation tools used for occupant evacuation over the past…

Abstract

Purpose

This paper aims to present a systematic review of the published literature on building information model (BIM)-based simulation tools used for occupant evacuation over the past 23 years.

Design/methodology/approach

A literature review was conducted on BIM-based simulation tools used for occupant evacuation over the past 23 years. The search identified a total of 37 relevant papers, which were reviewed. The paper describes the use of BIM-based simulation tools over the years and identifies the research gaps.

Findings

BIM-based simulation tools have undergone progressive development, with constant improvements through the integration of advanced tools and collection of more data. These tools can assist in identifying faults in the building design. The outcomes of the simulation were not entirely accurate, as real-life scenarios vary depending on the various building types and the behavior of their occupants.

Research limitations/implications

This study contributes to the literature through reviewing the capabilities of BIM-based simulation tools and the different simulation methods along with their limitations.

Practical implications

Fire safety engineers and architects can comprehend the utilization of BIM-based simulation tools to enhance the fire evacuation in light of their shortcomings and flaws.

Originality/value

BIM-based simulation tools are becoming more advanced and widely used. There has not been a comprehensive evaluation of the capabilities of the integration of BIM tools and simulation modeling for occupant evacuation. This study guides researchers on the capabilities and efficiencies of integrated solutions for occupant evacuations and their inherent shortcomings. The study identifies future research areas in BIM-based tools for occupant evacuation.

Details

Facilities , vol. 41 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

1 – 10 of 239