Search results

1 – 10 of over 2000
Article
Publication date: 24 February 2012

Hari Darshan Shrestha, Ryuichi Yatabe, Netra Prakash Bhandary and Jishnu Subedi

As the widely held perception is that retrofitting is a complicated process and is expensive, the purpose of this paper is to analyze cost effectiveness of retrofitting existing…

Abstract

Purpose

As the widely held perception is that retrofitting is a complicated process and is expensive, the purpose of this paper is to analyze cost effectiveness of retrofitting existing buildings in order to make them safer against earthquake and also to add child friendly features. This case study focuses on the simple method of retrofitting on rectangular single storey existing school buildings. The school buildings are of different types, based on material, shape and size, number of storeys and their vulnerability to earthquake is different case by case. The paper also outlines the process of vulnerability assessment and approach to retrofitting.

Design/methodology/approach

The paper is based on the data collected from a case study carried out in Aceh (Indonesia) as a part of an assessment of vulnerability of newly constructed school facilities and retrofitting them in order to increase their seismic performance.

Findings

One of the key findings of this study is that retrofitting can be achieved through the use of simple methods, tools and equipment and local human resource. This approach not only reduced the vulnerability of school children to earthquake disaster but also contributed to disseminate the message of culture of safety among the neighboring communities. Another major finding is that cost of retrofitting is less compared to the cost of demolition and rebuilding. The retrofitting option further saves the cost as it is time saving and the downtime is less. The retrofitting process and onsite training can also be an effective medium for dissemination of best construction practices in the community. The process also helps the local people to understand the context of risk and raise awareness on disaster risk reduction.

Research limitations/implications

The findings of this paper are not limited to vulnerability assessment and retrofitting of school building in Aceh. They can be replicated in other parts of Indonesia and countries having similar type of buildings.

Practical implications

The findings of this paper will be useful for decision makers to replicate similar processes in other types of schools in other areas. The findings will also be useful advocate disaster safer and child friendly schools.

Originality/value

The paper is unique in its findings that retrofitting of school buildings does not only make the schools safer and reduces the risk to children but is also cost effective compared to new construction.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 27 June 2023

Olubukola Tokede, Mani Kumar Boggavarapu and Sam Wamuziri

Crucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building…

Abstract

Purpose

Crucial transition of the Indian residential building sector into a low-emission economy require an in-depth understanding of the potentials for retrofitting the existing building stock. There are, however, limited studies that have recognised the interdependencies and trade-offs in the embodied energy and life cycle impact assessment of retrofit interventions. This research appraises the life cycle assessment and embodied energy output of a residential building in India to assess the environmental implications of selected retrofit scenarios.

Design/methodology/approach

This study utilises a single case study building project in South India to assess the effectiveness and impact of three retrofit scenarios based on life cycle assessment (LCA) and embodied energy (EE) estimates. The LCA was conducted using SimaPro version 9.3 and with background data from Ecoinvent database version 3.81. The EE estimates were calculated using material coefficients from relevant databases in the published literature. Monte Carlo Simulation is then used to allow for uncertainties in the estimates for the scenarios.

Findings

The three key findings that materialized from the study are as follows: (1) the retrofitting of Indian residential buildings could achieve up to 20% reduction in the life cycle energy emissions, (2) the modification of the building envelope and upgrading of the building service systems could suffice in providing optimum operational energy savings, if the electricity from the grid is sourced from renewable plants, and (3) the production of LEDs and other building services systems has the highest environmental impacts across a suite of LCA indicators.

Originality/value

The retrofitting of residential buildings in India will lead to better and improved opportunities to meet the commitments in the Paris Climate Change Agreement and will lead to enhanced savings for building owners.

Details

Built Environment Project and Asset Management, vol. 13 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 19 March 2021

Jyoti Maheshwari, Pramod Paliwal and Amit Garg

Energy-efficient retrofitting of existing buildings is an inexpensive way of reducing energy consumption and mitigating climate change impacts. The purpose of this study is to…

Abstract

Purpose

Energy-efficient retrofitting of existing buildings is an inexpensive way of reducing energy consumption and mitigating climate change impacts. The purpose of this study is to examine electricity savings and carbon dioxide (CO2) emission reduction potentials of energy-efficient retrofit measures for surveyed two large shopping malls in India.

Design/methodology/approach

A techno-economic model was developed to estimate the electricity savings achieved due to energy-efficient retrofit measures in shopping malls that were surveyed in 2017. Alternative scenarios were constructed based on capital cost and cost of conserved energy (CCE) value for retrofit measures: cheapest replacement, best available technology and best value for money. The life-cycle electricity and CO2 emission savings and payback period for end-use retrofit measures were evaluated.

Findings

The estimated average electricity savings were around 39–56% for various retrofit measures across all three scenarios while the average CO2 emission reductions were around 50–125 kt-CO2. Retrofits to light-emitting diode lights and air conditioners with inverter technology offered more life-cycle electricity savings. Paybacks for most lighting end-use measures were estimated to be within 1.5 years while for most space conditioning end-use measures were between 1 and 4 years.

Originality/value

The primary survey-based comprehensive research makes an exclusive contribution by estimating life-cycle electricity savings and CO2 emission reductions for energy-efficient retrofit measures of lighting and space cooling end-use appliances for existing shopping malls. The present research methodology can also be deployed in other types of commercial buildings and in residential buildings to estimate electricity savings from energy-efficient retrofit measures.

Details

International Journal of Energy Sector Management, vol. 15 no. 3
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 2 September 2013

William Swan, Les Ruddock and Luke Smith

– The study was designed to assess the attitudes, strategic readiness and drivers and barriers to the adoption of sustainable retrofit within the UK social housing sector.

2179

Abstract

Purpose

The study was designed to assess the attitudes, strategic readiness and drivers and barriers to the adoption of sustainable retrofit within the UK social housing sector.

Design/methodology/approach

The study was undertaken using a structured questionnaire that was completed by 130 providers of social housing.

Findings

The study showed that social housing providers were aware of the sustainable retrofit agenda, but with varying levels of strategic readiness. Immediate benefits to residents were seen as important drivers, as opposed to more remote issues such as climate change. The emerging nature of the sustainable retrofit market was seen as a major potential risk for residents.

Research limitations/implications

The study represents a snap-shot of adoption and effectiveness issues, therefore does not show the trajectory of adoption which should be addressed in a follow-up study.

Practical implications

The social housing sector has been viewed as a market maker for the sustainable retrofit market. The study shows the attitudes of the sector to this role.

Social implications

The study has implications for the understanding social housing providers’ engagement with the sustainable retrofit market to address fuel poverty and climate change. Social housing's role as market maker has implications for policies such as Green Deal and Energy Company Obligation.

Originality/value

The study covers approximately 20 per cent of the social housing stock under management and gives a robust perspective of current views on adoption and effectiveness of retrofit technologies within the social housing sector. This is useful for both other social housing providers and policy makers.

Details

Engineering, Construction and Architectural Management, vol. 20 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 November 2014

Temitope Egbelakin, Suzanne Wilkinson and Jason Ingham

The purpose of this paper is to examine why building owners are often reluctant to adopt adequate mitigation measures despite the vulnerability of their buildings to earthquake…

Abstract

Purpose

The purpose of this paper is to examine why building owners are often reluctant to adopt adequate mitigation measures despite the vulnerability of their buildings to earthquake disasters, by exploring the economic-related barriers to earthquake mitigation decisions.

Design/methodology/approach

A case study research method was adopted and interviews chosen as the method of data collection.

Findings

Critical economic-related impediments that inhibited seismic retrofitting of earthquake-prone buildings were revealed in this study. Economic-related barriers identified include perception about financial involvement in retrofitting, property market conditions, high insurance premiums and deductibles, and the high cost of retrofitting. The availability of financial incentives such as low interest loans, tax deductibles, the implementation of a risk-based insurance premium scale and promoting increased knowledge and awareness of seismic risks and mitigation measures in the property market place are likely to address the economic-related challenges faced by property owners when undertaking seismic retrofitting projects. The provision of financial incentives specifically for seismic retrofitting should be introduced in policy-implementation programme tailored to local governments’ level of risks exposure and available resources.

Practical implications

The recommendations provided in this study suggest strategies and answers to questions aimed at understanding the types of incentives that city councils and environmental hazard managers should focus on in their attempt to ensure that property owners actively participate in earthquake risk mitigation.

Originality/value

This paper adopts a holistic perspective for investigating earthquake risk mitigation by examining the opinions of the different stakeholders involved in seismic retrofit decisions.

Details

Structural Survey, vol. 32 no. 5
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 14 February 2022

M.F.F. Fasna, Sachie Gunatilake, Andrew Ross and Anupa Manewa

Among the existing buildings, hotels use as much as 50% of their total expenses on energy and offer significant opportunities for energy efficiency improvement. Yet, comparatively…

Abstract

Purpose

Among the existing buildings, hotels use as much as 50% of their total expenses on energy and offer significant opportunities for energy efficiency improvement. Yet, comparatively the level of implementation of energy retrofits (ER) in hotels appear to be low. This has been mainly attributed, inter alia, to the absence of clearly defined process for ensuring the delivery of ER and lack of proactive guidance for project teams to make right decisions. Hence, this study aims to propose an effective decision-making process, which could support the successful adoption and implementation of in-house-led ER projects in existing hotel buildings.

Design/methodology/approach

Two in-depth case studies were carried out focussing on ER projects led by in-house teams in existing hotel buildings. Data was collected via 14 semi-structured interviews and was analysed through code-based content analysis.

Findings

The decision-making process for ER projects led by in-house teams was developed, which presents 39 key activities to be performed and 16 key decisions to be made. The parties responsible for these identified actions and decisions as well as the points at which each decision should be made to ensure the success of ER projects was also identified.

Originality/value

A total of 21 new activities and 10 decisions relevant for in-house team led ER decision-making processes previously not found in literature were identified. It is hoped that the decision-making process developed in this study will serve as a roadmap for the effective adoption and implementation of ER in existing hotel buildings.

Details

Journal of Facilities Management , vol. 21 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 2 November 2012

Sara Wilkinson

The built environment has high potential to reduce overall greenhouse gas emissions and with around 1‐2 per cent of new buildings added to the total stock annually, the scope for…

2511

Abstract

Purpose

The built environment has high potential to reduce overall greenhouse gas emissions and with around 1‐2 per cent of new buildings added to the total stock annually, the scope for reductions lies with adaptation of existing stock. Existing buildings comprise a variety of attributes and present challenges and opportunities with regards to adaptation and sustainability, and integrating retrofit measures that lessen energy, water and resource consumption.

Design/methodology/approach

Through a quantitative analysis of a Building Adaptation database, this paper addresses the questions; what is the nature of adaptations in relation to Premium quality office building stock in the Central Business District (CBD) and, what is the extent and scope for sustainable retrofits to Premium grade office buildings.

Findings

The nature and extent of adaptations to Premium office buildings are identified and quantified in respect of attributes such as adaptation level, building age, location, construction form, envelope, shape and height and operating costs.

Practical implications

The findings provide an insight for policy makers and others in respect of the nature and type of adaptations typically undertaken in Premium office buildings. The research identifies the typical attributes found in buildings undergoing adaptation and specifies the type of sustainable retrofit measures particularly suited to buildings with those attributes.

Originality/value

The research is based on an analysis of “all” office building adaptations from 1998 to 2008, which facilitates a unique study of what has occurred with regards to adaptation practices. From this starting point it is possible to determine where opportunities lie to capitalise on work being undertaken.

Article
Publication date: 10 April 2017

Sheikh Zuhaib, Richard Manton, Magdalena Hajdukiewicz, Marcus M. Keane and Jamie Goggins

There is profound demand for higher skills and expertise in retrofitting the existing building stock of Europe. The delivery of low- or nearly zero-energy retrofits is highly…

1356

Abstract

Purpose

There is profound demand for higher skills and expertise in retrofitting the existing building stock of Europe. The delivery of low- or nearly zero-energy retrofits is highly dependent on technical expertise, adoption of new materials, methods of construction and innovative technologies. Future Irish national building regulations will adopt the Energy Performance of Buildings Directive vision of retrofitting existing buildings to higher energy efficiency standards. Construction industry stakeholders are key for the achievement of energy performance targets. Specifically, the purpose of this paper is to assess the attitudes, approaches and experiences of Irish construction professionals regarding energy efficient buildings, particularly nearly zero-energy buildings (nZEBs).

Design/methodology/approach

Data were collected through a series of quantitative and qualitative methods, including a survey, a workshop and detailed interviews with professionals in the retrofit industry. The structure of this approach was informed by preliminary data and information available on the Irish construction sector.

Findings

There is a substantial amount of ambiguity and reluctance among the professionals in reaching the Irish nZEB targets. The growing retrofit industry demonstrates low-quality auditing and pre/post-retrofit analysis. Basic services and depth of retrofits are compromised by project budgets and marginal profits. Unaligned value supply chain, poor interaction among nZEB professionals and fragmented services are deterrents to industry standardisation.

Practical implications

This study will enable construction industry stakeholders to make provisions for overcoming the barriers, gaps and challenges identified in the practices of the retrofit projects. It will also inform the formulation of policies that drive retrofit uptake.

Social implications

This study has implications for understanding the social barriers existing in retrofit projects. Support from clients/owners has a diverse impact on energy performance and retrofit decisions. Community-based initiatives are key to unlock the promotion of nZEBs.

Originality/value

This paper provides an overview of current activities of retrofit professionals and analyses the barriers, gaps and challenges in the industry.

Details

International Journal of Building Pathology and Adaptation, vol. 35 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 12 October 2018

Indeewari Ranawaka and Harshini Mallawaarachchi

The purpose of this paper is to evaluate the risks associated with green retrofit projects in Sri Lanka in order to develop a risk responsive framework.

Abstract

Purpose

The purpose of this paper is to evaluate the risks associated with green retrofit projects in Sri Lanka in order to develop a risk responsive framework.

Design/methodology/approach

The survey method under the quantitative approach was selected as the research methodology as this research is required evaluating the risks associated with green retrofit projects. Both preliminary survey and the main questionnaire survey were conducted to collect the data. The survey data were evaluated and analysed by using mode value as a descriptive statistical analysis technique, and the risk rating matrix.

Findings

The overall results of risk assessment deliberated that there are ten “critical” risk factors, such as construction cost, inflation, energy saving uncertainty, warranty risk, delay in project completion, productivity and quality risks, requirement of permits and their approval, design changes, damage to structure or property and procurement delay influencing green retrofitting. Finally, a risk responsive framework was developed by proposing suitable strategies for mitigating the risks associated with green retrofitting.

Practical implications

The developed framework can be used as a basis to mitigate the risks associated with green retrofitting projects. An abundant upgrade of existing high-rise buildings into green can be reached.

Originality/value

A little attention paid on green retrofitting and the absence of proper risk management strategy for green retrofit projects in current practice have made this research a paramount need and a focal point.

Details

Built Environment Project and Asset Management, vol. 8 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 6 December 2019

M.F.F. Fasna and Sachie Gunatilake

Despite the pressures around the world to retrofit existing buildings to have higher energy performance, still the level of adoption and implementation of Building Energy…

Abstract

Purpose

Despite the pressures around the world to retrofit existing buildings to have higher energy performance, still the level of adoption and implementation of Building Energy Efficiency Retrofits (BEER) appear comparatively low. The purpose of this paper is to explore the barriers that affect the successful implementation of BEER in actual project level executions and identify strategies to overcome such barriers.

Design/methodology/approach

In total, two case studies were conducted in selected hotel buildings to explore the barriers that hamper the adoption and implementation of BEER in the local context and in turn identify the strategies to overcome them. Altogether 11 semi-structured interviews were conducted with respondents involved in different phases of these BEER projects. The data were analysed using code-based content analysis.

Findings

Altogether 38 barriers were identified under the three main project phases. Furthermore, the study revealed 77 strategies to overcome the identified barriers, classified as individual, organisational and national level strategies.

Originality/value

This paper has made a unique contribution to the field by identifying the barriers in each phase of BEER projects and proposing strategies to be taken at different levels to overcome them. The findings of this study will provide a basis for setting up country-wide and organisation-wide strategies for successfully improving the energy efficiency of existing hotel buildings.

Details

Built Environment Project and Asset Management, vol. 10 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of over 2000