Publication date: 21 May 2018

Parvaneh Shahsavand, Akbar Marefat and Majid Parchamijalal

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and…

45487

Abstract

Purpose

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project.

Design/methodology/approach

This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors.

Findings

In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule.

Originality/value

All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 21 May 2018

Saeed Akbari, Mostafa Khanzadi and Mohammad Reza Gholamian

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly…

2783

Abstract

Purpose

To address requirements and specifications of construction project, academics need to build a project classification model. In recent years, project success concept, particularly on large-scale construction projects, has been a controversial issue, especially in developing countries. Hence, in this paper, after introducing a sustainable success index (SSI), a novel method called “rough set approach” had been adopted to induce decision rules and to classify construction projects. The paper aims to discuss these issues.

Design/methodology/approach

At first, 20 effective success factors and 15 success criteria based on three pillars of sustainability of economy, society and environment had been categorized. The research data used for analysis had been collected from 26 large-scale construction projects in Iran and five other countries. After collecting data collection, observations had been analyzed and 51 decision rules were generated, and the projects were classified. Eventually, in order to evaluate the performance of the generated rules, confusion matrix was applied, and the model was validated.

Findings

The results of the present study show that rough set theory (RST) can be an effective and valuable tool for building expert systems. Practical applications of these results along with limitations and future research are described.

Originality/value

Perhaps for the first time, in the present study, a number of large-scale construction projects are classified based on SSI. Applying RST for building rule-based system and classifying projects in construction project area are novel attempts undertaken in this paper. The rules induced in this study can be applied to develop a sustainable success prediction model in the future studies.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 January 2022

Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Opeoluwa Israel Akinradewo

A maintenance budget is an element of maintenance management (MM) that deals with financial planning for maintenance operations and execution within a maintenance organisation…

1602

Abstract

Purpose

A maintenance budget is an element of maintenance management (MM) that deals with financial planning for maintenance operations and execution within a maintenance organisation. Developed countries have standardised MM structures which guides maintenance activities. This, however, cannot be said of developing countries, as there are few or no MM standards adopted. Given this contextual setting, the study aims to validate the relevance of maintenance budget (MB) elements utilised in developed countries for developing countries – using Nigeria as a case study exemplar. Also, the study further examines the effectiveness of the validated maintenance budget elements.

Design/methodology/approach

The research adopts qualitative techniques and employs the Delphi survey to collect and analyse primary data from an operational perception through structured questionnaires to solicit views from panellists on the subject being assessed. A relative importance index (RII) was used in measuring consensus for the Delphi study outcomes, while a Cronbach Alpha test was carried out on all the MB elements to determine their level of reliability.

Findings

The key finding from the study reveals that of the 21 elements that influence the implementation of MB, 10 elements have a very high influence on the MM of buildings (VHI: 9.00–10.00), 5 elements had a high influence (HI: 7.00–8.99) and 6 other elements scored medium impact (MI: 5.00–6.99). The elements of MB that recorded very high influence on prompt MM effectiveness include MB implementation, corruption-free maintenance process, reduction in maintenance expenditure, maintenance financial plan, cost implication of maintained asset, cash flow indexing, prioritisation of maintenance financing, maintenance funding, incorporation of financial indicators and audit of operational maintenance cost.

Practical implications

On a practical note, these elements will guide the built environment professionals in organising maintenance activities to best use limited resources.

Originality/value

Cumulatively, the research presented shows that these elements are similar to those of other countries. Effective MM of buildings is assured when these elements are integral to developing a MB.

Details

Built Environment Project and Asset Management, vol. 12 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 27 April 2020

Murat Gunduz and Hesham Ahmed Elsherbeny

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the…

14296

Abstract

Purpose

This paper covers the development of a multidimensional contract administration performance model (CAPM) for construction projects. The proposed CAPM is intended to be used by the industry stakeholders to measure the construction contract administration (CCA) performance and identify the strengths and weaknesses of the CCA system for running or completed projects.

Design/methodology/approach

The research design follows a sequential mixed methodology of qualitative and quantitative data collection and analysis. In the first phase, contract administration indicators were collected from relevant literature. In the second phase, an online questionnaire was prepared, and data were collected and analyzed using the crisp value of fuzzy membership function, and structural equation modeling (SEM). The fuzzy set was chosen for this study due to the presence of uncertainty and fuzziness associated with the importance of several key indicators affecting the CCA performance. Finally, SEM was used to test and analyze interrelationships among constructs of CCA performance.

Findings

The data collected from 336 construction professionals worldwide through an online survey was utilized to develop the fuzzy structural equation model. The goodness-of-fit and reliability tests validated the model. The study concluded a significant correlation between CCA performance, CCA operational indicators, and the process groups.

Originality/value

The contribution of this paper to the existing knowledge is the development of a fuzzy structural equation model that serves as a measurement tool for the contract administration performance. This is the first quantitative structural equation model to capture contract administration performance. The model consists of 93 Construction Contract Administration(CCA) performance indicators categorized into 11 project management process groups namely: project governance and start-up; team management; communication and relationship management; quality and acceptance management; performance monitoring and reporting management; document and record management; financial management; changes and control management; claims and dispute resolution management; contract risk management and contract closeout management.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 20 February 2023

Emmanuel Chidiebere Eze, Onyinye Sofolahan and Olayinka Gideon Omoboye

Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The…

5698

Abstract

Purpose

Sustainable/Green building materials (SBMs/GBMs) offer a wide range of benefits which cut across the economic, social and environmental dimensions of sustainability. The incorporation of these materials in construction projects in most developing countries is still low owing to some factors. This study assessed the major barriers to the incorporation of SBMs in the delivery of construction projects in developing countries, with Nigeria as a case in point.

Design/methodology/approach

The well-structured quantitative questionnaire was used to gather data from the key players in the construction industry, using the snowball sampling method and electronic means of questionnaire administration. Frequencies, percentile, relative importance index, Kruskal–Wallis H test, Kendall's coefficient of concordance and exploratory factor analysis were used to analyse the gathered data.

Findings

The study revealed that the major constructs of barriers to SBM adoption in construction projects are: (1) resistance and information barriers (Eigenvalues = 5.237; % of V = 23.806), (2) regulation and funding of R&D (Eigenvalues = 2.741; % of V = 12.457), (3) cost and market barriers (Eigenvalues = 2.223; % of V = 10.105), (4) government incentive and suppliers' availability (Eigenvalues = 1.728; % of V = 7.852) and (5) GB experts and labour barriers (Eigenvalues = 1.307; % of V = 5.942).

Originality/value

This study assessed the view of construction experts in the five states of the south-eastern geo-political zone of Nigeria, particularly as regards the barriers to the incorporation of sustainable building materials in construction projects in the region.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 25 October 2022

Prosper Babon-Ayeng, Eric Oduro-Ofori, De-Graft Owusu-Manu, David James Edwards, Ernest Kissi and Augustine Senanu Komla Kukah

There is a pressing need to increase investments in sustainable infrastructure to promote low carbon economic growth and ensure environmental sustainability. Consequently, this…

1765

Abstract

Purpose

There is a pressing need to increase investments in sustainable infrastructure to promote low carbon economic growth and ensure environmental sustainability. Consequently, this study examines the socio-political factors underlying the adoption of green bond financing of infrastructure projects.

Design/methodology/approach

Primary data was gathered from experts with advanced experience in, or knowledge of green bonds in the Kumasi Metropolis. To identify respondents with pertinent knowledge that is relevant to the study, purposive and snowball sampling techniques were used. One-sample t-test and relative importance index were used in this study's statistical analysis.

Findings

‘Training and experience with sustainable finance’ was seen as the most important social factor underlying the adoption of green bond financing of infrastructure projects by the respondents and ‘Governmental tax-based incentives’ was rated as the leading political factor.

Originality/value

This pioneering research attempts to ascertain the socio-political factors affecting the adoption of green bond financing of infrastructure projects. Emergent results of analysis and concomitant discussions add knowledge to fill a void in literature on the social and political factors affecting the adoption of green bond financing of infrastructure projects in developing countries.

Details

Journal of Capital Markets Studies, vol. 6 no. 3
Type: Research Article
ISSN: 2514-4774

Keywords

Open Access
Article
Publication date: 4 August 2023

Hezekiah Farayola Olaniran and Bolatito Folasade Akinbile

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant…

1194

Abstract

Purpose

Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant accidents. Therefore, the aim of this study is to compare the health and safety practises of the construction and oil and gas industries in Nigeria in order to suggest the best approach to health and safety practices.

Design/methodology/approach

A survey questionnaire was developed and administered to professionals working in the construction and oil and gas industries. Data were analysed using the relative importance index (RII). An independent sample t-test was also conducted to determine whether there was a significant difference in the construction and oil and gas industries.

Findings

The study revealed that the rate at which health and safety are practised in the oil and gas industry is comparatively high compared to how they are practised in the construction industry. Proper site layout and planning, provision of a safe working environment, proper health and safety risk assessment were more predominantly practised in the oil and gas industry, while proper site layout and planning, disallowing unauthorised entry into site and the provision of a safe working environment were predominantly practised in the construction industry.

Originality/value

This study is the first to compare the health and safety practises of the construction and oil and gas industries in Nigeria. This study was significant because it would provide insight into construction and oil and gas managers, as well as other decision-makers in both industries, on how to improve health and safety practices.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 12 May 2023

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to…

1045

Abstract

Purpose

Sources highlight that insufficient skills of site supervisors considerably influence the progress of many construction projects in numerous countries. This study intends to identify the crucial supervisory competencies that influence the effectiveness of building project operations in the context of developing countries.

Design/methodology/approach

The crucial construction site supervisory competencies were qualitatively identified through a comprehensive literature survey and a series of expert interviews with the use of thematic analysis approaches. A questionnaire survey was then carried out among 154 building project firms to quantify the impacts of the competencies on the effectiveness of project tasks with the use of the relative importance index approach. Additionally, industry-consultative meetings were held using problem-focused communication strategies to scrutinise the necessary actions.

Findings

Overall, 22 cognitive elements and 24 skills/abilities of supervisors were determined as being critical according to their impact values, where the site supervisors cognitive domains in construction planning and construction materials were determined as the top-ranking competencies in the list, with their manual skills/abilities in labour management and labour performance evaluation. Accordingly, a group of key competency outcomes were produced for the considerations in developing new site supervisory training components. Relevant statistical analysis results and the industry consultative outcomes substantiated the validity and dependability of the overall results.

Research limitations/implications

Although the study's focus was to site supervision procedures used in Sri Lankan building construction projects, the overall findings/outcomes might be put to the test in related situations in other emerging industries in other countries.

Originality/value

The study has constructed a base that shows how the significant site supervisory competencies influence the effectiveness of building construction operations, contributing to making a big difference in the methods of reskilling/upskilling in the industry associated with construction labour, supervision, efficiency management and productivity enhancement.

Details

International Journal of Industrial Engineering and Operations Management, vol. 6 no. 1
Type: Research Article
ISSN: 2690-6090

Keywords

Open Access
Article
Publication date: 30 January 2023

Divine Tuinese Novieto, Frank Kulor, Michael Wellington Apprey and Elom Ayeke

The main goal of this study was to determine how students at Ho Technical University (HTU) viewed green construction approaches and the benefits green buildings may provide to…

3251

Abstract

Purpose

The main goal of this study was to determine how students at Ho Technical University (HTU) viewed green construction approaches and the benefits green buildings may provide to Ghana's tertiary institutions to enhance quality of life.

Design/methodology/approach

The institution's 350 participants were chosen using a random selection method. A standardised questionnaire was used to gather data, which was analysed using SPSS v.20 and presented in tables using descriptive statistics such as Likert scale analysis, weighted mean and relative importance index (RII).

Findings

The study revealed that awareness of the green building principle is comparatively low amongst the survey participants. Participants agree that the University's green building adoption is high. Students cited decreased utility expenses, improved occupant productivity and cheaper operational costs as important benefits of green construction. Students' thoughts on hurdles to implementing green construction ideas at the University were the enormous price tag of green building technology (RII = 0.89), ignorance of demonstration projects and ignorance of information on green building principles (RII = 0.81).

Originality/value

This is one of the first papers to study Ghanaian students' views on green buildings. This study adds to our understanding of students' thoughts on green building ideas. In addition, it sheds insight into their present awareness, which can help the university administration in Ghana design new paths for green building implementation.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 21 June 2022

Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Opeoluwa Israel Akinradewo and David Edwards

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an…

1181

Abstract

Purpose

Maintenance policy is an element of building maintenance management that deals with organisation policy, planning and procedures, and delineates how maintenance units in an organisation will manage specific building components, auxiliary facilities and services. Given this contextual setting, this study investigates whether organisational maintenance policies (OMPs) utilised in developed countries are relevant in developing countries – using Nigeria as a case study exemplar.

Design/methodology/approach

An empirical research design (using deductive reasoning) was implemented for this research. Specifically, a Delphi study conducted revealed 23 elements that impact OMP development in Nigeria.

Findings

Of these twenty elements, six had a very high impact on maintenance management (VHI: 9.00–10.00), nine variables had a high impact (HI: 7.00–8.99) and eight other variables scored a medium impact (MI: 5.00–6.99). Emergent findings reveal that the elements of organisational maintenance policy that engender effective building maintenance management include preparation of safety procedure, optimisation of the maintenance policy, optimisation of the maintenance action plan, well-defined priority system, risk factor establishment, suitable maintenance procedures and a clearly delineated process.

Practical implications

The study findings will guide policymakers in identifying the main elements required in maintenance policies development towards making national public asset preservation and economic gains. Also, the content of the future educational curriculum on maintenance management study will be more receptive to the body of knowledge and the built environment industry.

Originality/value

Cumulatively, the research presented illustrates that these elements replicate those adopted in other countries and that effective maintenance management of public buildings is assured when these elements are integral to the development of an OMP.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

1 – 10 of over 2000