Search results

1 – 10 of over 1000
Article
Publication date: 19 January 2024

Raveena Marasinghe and Susantha Amarawickrama

This paper examines rent determinants and their relationship with commercial office property rents.

65

Abstract

Purpose

This paper examines rent determinants and their relationship with commercial office property rents.

Design/methodology/approach

The method adopted in this study differs from that of previous studies on this topic. Firstly, based on the survey of the viewpoints of experts, Relative Importance Index (RII) analysis was used to identify rent determinants and to rank and ensure their relevance and validity in the Sri Lankan context. Secondly, sampling of data related to 115 office properties collected from property tenants and landlords located within the central built-up area of Colombo City was conducted using a multi-methods approach to carry out an objective hedonic analysis of office rents.

Findings

This research utilizes RII and hedonic models to provide insights into determinants and relationships. Both analyses confirm that the three top drivers of commercial office rent are distance from the major town center, availability of parking space and the condition of the property. In addition to these three factors, hedonic models reveal that the age of the property and the availability of a conference hall also play a relevant role in explaining office rents. Given the disparities in the findings of the two methods, further examination was able to confirm that factors such as distance from the major town center, parking availability, age of the property, presence of a conference hall, building condition, floor size, business type and type of building are likely to influence commercial office rent. These findings reflect elements such as the quality, newness and better facilities of different office properties.

Practical implications

This systematic study and analysis of office rent for the guidance of real estate investors can support sound investment decisions, potentially leading to more financially sound property development, reduced public debt levels and improved public-private financing. Further, the research findings offer valuable insights to real estate investors, developers and planners regarding location decisions for office development quality enhancements in future office developments.

Originality/value

This research provides fresh insights into the local scale office market, an area where limited evidence currently exists. Further, the methodology adopted provides evidence that hedonic analysis, supported by a multi-method approach, can mitigate the subjective judgments made by professionals.

Details

Journal of Property Investment & Finance, vol. 42 no. 1
Type: Research Article
ISSN: 1463-578X

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 January 2024

Chinedu Onyeme and Kapila Liyanage

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on…

65

Abstract

Purpose

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on developing countries like Nigeria. The research identifies barriers to this integration and suggests solutions, intending to provide practical insights for improving operational efficiency in the O&G sector.

Design/methodology/approach

The study commenced with an exhaustive review of extant literature to identify existing barriers to I4.0 implementation and contextualise the study. Subsequent to this foundational step, primary data are gathered through the administration of carefully constructed questionnaires targeted at professionals specialised in maintenance within the upstream O&G sector. A semi-structured interview was also conducted to elicit more nuanced, contextual insights from these professionals. Analytically, the collected data were subjected to descriptive statistical methods for summarisation and interpretation with a measurement model to define the relationships between observed variables and latent construct. Moreover, the Relative Importance Index was utilised to systematically prioritise and rank the key barriers to I4.0 integration to CBM within the upstream O&G upstream sector.

Findings

The most ranked obstacles in integrating I4.0 technologies to the CBM strategy in the O&G industry are lack of budget and finance, limited engineering and technological resources, lack of support from executives and leaders of the organisations and lack of competence. Even though the journey of digitalisation has commenced in the O&G industry, there are limited studies in this area.

Originality/value

The study serves as both an academic cornerstone and a practical guide for the operational integration of I4.0 technologies within Nigeria's O&G upstream sector. Specifically, it provides an exhaustive analysis of the obstacles impeding effective incorporation into CBM practices. Additionally, the study contributes actionable insights for industry stakeholders to enhance overall performance and achieve key performance indices (KPIs).

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 19 April 2024

Sumant Sharma, Deepak Bajaj and Raghu Dharmapuri Tirumala

Land value in urban areas in India is influenced by regulations, bylaws and the amenities associated with them. Planning interventions play a significant role in enhancing the…

Abstract

Purpose

Land value in urban areas in India is influenced by regulations, bylaws and the amenities associated with them. Planning interventions play a significant role in enhancing the quality of the neighbourhood, thereby resulting in a change in its value. Land is a distinct commodity due to its fixed location, and planning interventions are also specific to certain locations. Consequently, the factors influencing land value will vary across different areas. While recent literature has explored some determinants of land value individually, conducting a comprehensive study specific to each location would be more beneficial for making informed policy decisions. Therefore, this article aims to examine and identify the critical factors that impact the value of residential land in the National Capital Territory of Delhi, India.

Design/methodology/approach

The study employed a combination of semi-structured and structured interview methods to construct a Relative Importance Index (RII) and ascertain the critical determinants affecting residential land value. A sample of 36 experts, comprising property valuers, urban planners and real estate professionals operating within the National Capital Territory of Delhi, India, were selected using snowball sampling techniques. Subsequently, rank correlation and ANOVA methods were employed to evaluate the obtained results.

Findings

Location and stage of urban development are the most critical determinants in determining residential land values in the National Capital Territory of Delhi, India. The study identifies a total of 13 critical determinants.

Practical implications

A scenario planning approach can be developed to achieve an equitable distribution of values and land use entropy. A land value assessment model can also be developed to assist professional valuers.

Originality/value

There has been a lack of emphasis on assessing the impact of planning interventions and territorial regulation on land values in the context of Delhi. This study will contribute to policy decision-making by developing a rank list of planning-based determinants of land value.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 1 March 2024

Mala Ali Modu, Maimunah Sapri and Zafirah Ab Muin

Social housing offers occupants comfort, safety and protection against extreme weather conditions. However, social housing occupants in various regions of Nigeria face various…

Abstract

Purpose

Social housing offers occupants comfort, safety and protection against extreme weather conditions. However, social housing occupants in various regions of Nigeria face various challenges. This paper aims to use a quantitative approach to examine the factors that contribute to the challenges faced by occupants in social housing within a semi-arid climate of Nigeria.

Design/methodology/approach

An exploratory cross-sectional survey was used to administer 1,032 copies of structured questionnaires to occupants of social housing in Maiduguri, one of the largest urban centers of the semi-arid climate in Nigeria. A total of 955 responses were retrieved, giving a response rate of 92.5%. The statistical model used in analyzing data was relative importance indices and factor analysis.

Findings

The results show that poor quality of FM services provided, poor maintenance of building components, damage to materials and valuables in the Harmattan period and housekeeping problems due to dust deposition in doors, while the poor response to occupants’ complaints/reports is the least among the occupants’ challenges in order of importance. Moreover, the results of the factor analysis further established that inadequate FM services and poor environmental conditions are the two factors contributing to the occupants’ challenges in social housing within the semi-arid climate of Nigeria.

Originality/value

This paper seeks to examine the factors contributing to social housing occupants’ challenges in the semi-arid climate of Nigeria. The paper should inform policymakers, academics and professionals.

Details

Facilities , vol. 42 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 14 November 2022

Abdul Hannan Qureshi, Wesam Salah Alaloul, Wong Kai Wing, Syed Saad, Khalid Mhmoud Alzubi and Muhammad Ali Musarat

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution…

Abstract

Purpose

Rebar is the prime component of reinforced concrete structures, and rebar monitoring is a time-consuming and technical job. With the emergence of the fourth industrial revolution, the construction industry practices have evolved toward digitalization. Still, hesitation remains among stakeholders toward the adoption of advanced technologies and one of the significant reasons is the unavailability of knowledge frameworks and implementation guidelines. This study aims to investigate technical factors impacting automated monitoring of rebar for the understanding, confidence gain and effective implementation by construction industry stakeholders.

Design/methodology/approach

A structured study pipeline has been adopted, which includes a systematic literature collection, semistructured interviews, pilot survey, questionnaire survey and statistical analyses via merging two techniques, i.e. structural equation modeling and relative importance index.

Findings

The achieved model highlights “digital images” and “scanning” as two main categories being adopted for automated rebar monitoring. Moreover, “external influence”, “data-capturing”, “image quality”, and “environment” have been identified as the main factors under “digital images”. On the other hand, “object distance”, “rebar shape”, “occlusion” and “rebar spacing” have been highlighted as the main contributing factors under “scanning”.

Originality/value

The study provides a base guideline for the construction industry stakeholders to gain confidence in automated monitoring of rebar via vision-based technologies and effective implementation of the progress-monitoring processes. This study, via structured data collection, performed qualitative and quantitative analyses to investigate technical factors for effective rebar monitoring via vision-based technologies in the form of a mathematical model.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 July 2023

Adekunle Sabitu Oyegoke, Ben Williams Fisher, Saheed Ajayi, Temitope Seun Omotayo and Duga Ewuga

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate…

Abstract

Purpose

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate the disruptive effects on the supply chain. Covid-19 and Brexit disruption and their longevity effects in the short, medium and long term on the supply chain are relied upon to develop the framework.

Design/methodology/approach

The study adopted a mixed-method approach with a sequential explanatory design. The main disruptive factors were identified through a literature review, and key factors were selected through a focus group exercise. A questionnaire survey was carried out to sample opinions from the practitioners; 41 questionnaires were received and analysed using the relative importance index (RII) method for ranking the factors and percentage frequency distribution to determine the longevity effects. Five follow-up semi-structured interviews were conducted over the telephone and later transcribed.

Findings

The results of Covid-19 disruption indicate that material cost increase ranked first (RII: 0.863), logistics cost increase and supply chain interaction ranked second and third, respectively. They have long-term, medium-term and short-term longevity effects, respectively. The lowest-rated factors were communication (RII: 0.561), staff shortages (RII: 0.629) and impact on relationships (RII: 0.639). The three most ranked Brexit disruptive factors are supply chain interaction (RII: 0.775), material cost increase (RII: 0.766) and logistic and haulage delay (RII: 0.717). The first two factors have long-term effects, and the logistics and haulage delays have a medium-term impact. The mitigating solutions suggested in the framework are collaborative working, stronger resilience to external forces and better transparency and communication that will lead to good relationships among the supply chain members.

Research limitations/implications

The scope of the study was limited to the UK construction industry; however, the pandemic effect on supply chain can serve as critical learning curve in other developed and developing countries.

Practical implications

The study will help the government and construction firms to understand the focal areas of importance in solving the supply chain disruption problems based on the effects of Brexit and Covid-19. The research would be useful in ensuring the proactive involvement of the government and contracting firms in their preparedness for similar events in the future. The results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the supply chain disruptive factors affecting the small‐ and medium‐sized enterprises (SMEs) in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective framework comprising the highly ranked factors, their longevity effects and mitigating measures. This will help the SMEs manage future/similar external events affecting the supply chain.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 29 March 2024

Ibrahim Yahaya Wuni

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of…

Abstract

Purpose

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of complexity, challenges and risks that if unaddressed, can derail the gains in sustainable construction projects. This study developed a multidimensional risk assessment model for sustainable construction projects in the United Arab Emirates (UAE).

Design/methodology/approach

The research activities a comprised comprehensive literature review to shortlist relevant risks, an analysis of the probability – impact rating of the shortlisted risks – and the development of a risk assessment model for SC projects in the UAE. The model is developed based on the multicriteria framework and mathematical formulation of the fuzzy synthetic evaluation approach.

Findings

The developed model quantified the overall risk level in sustainable construction projects to be 3.71 on a 5-point Likert scale, indicating that investment in SC projects in the UAE is risky and should be carefully managed. The developed model further revealed that each of the risk groups, comprising management (3.82), technical (3.78), stakeholder (3.68), regulatory (3.66), material (3.53) and economic risks (3.502), presents a significant threat to realizing outcomes typical of SC projects.

Originality/value

This study developed a multidimensional risk assessment model capable of objectively quantifying the overall risk level and provides decision support to project teams to improve risk management in sustainable construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 August 2023

Umar Saba Dangana and Namnso Bassey Udoekanem

The rising concern for the accuracy of residential valuations in Nigeria has created the need for key stakeholders in the residential property markets in the study areas to know…

Abstract

Purpose

The rising concern for the accuracy of residential valuations in Nigeria has created the need for key stakeholders in the residential property markets in the study areas to know the level of accuracy of valuations in order to make rational residential property transactions, amongst other purposes.

Design/methodology/approach

A blend of descriptive and causal designs was adopted for the study. Data were collected via structured questionnaire administered to 179 estate surveying and valuation (ESV) firms in the study areas using census sampling technique. Analytical techniques such as median percentage error (PE), mean and relative importance index (RII) analysis were employed in the analysis of data collected for the study.

Findings

The study found that valuation accuracy is greater in the residential property market in Abuja than in Minna, with inappropriate valuation methodology as the most significant cause of valuation inaccuracy.

Practical implications

The practical implication of this study is that a reliable databank should be established for the property market to provide credible transaction data for valuers to conduct accurate valuations in these cities. Strict enforcement of national and international valuation standards by the regulatory authorities as well as retraining of valuers on appropriate application of valuation approaches and methods are the recommended corrective measures.

Originality/value

No study has comparatively examined the accuracy of valuations in two extremely different residential property markets in the country using actual valuation and transaction prices.

Details

Property Management, vol. 42 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 28 July 2023

Mohammad Omar Aburumman, Rateb Sweis and Ghaleb J. Sweis

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit…

Abstract

Purpose

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit from greater integration and collaboration between their technologies and processes to reap the advantages and keep pace with the recent significant technological and managerial techniques developments. Therefore, this study aims to delve into and investigate building information modeling (BIM) and Lean Construction (L.C.) with a concentration on the potential BIM–lean interactions synergy and integration in the Jordanian construction industry.

Design/methodology/approach

This study takes exploratory nature, followed by the deductive research approach, and is designed to be a mono-quantitative research methodology. Moreover, the sampling technique is non-probability convenience sampling, and the research strategy is implemented through a questionnaire used and analyzed by using Statistical Package for Social Science to conduct descriptive and inferential statistical analysis and verify the reliability and validity through proper tests.

Findings

The BIM–lean interactions synergy and integration findings revealed that eliminating waste (time, cost, resources), promoting continuous improvement (Kaizen) and standardizing as lean construction principles are the most significant and agreeable toward achieving BIM–lean interactions synergy. On the other hand, “High 3D Visualization Modelling” was the most significant BIM function, followed by “Rapid and Auto-Generation of Documents and Multiple Design Alternatives” and “Maintenance of Information and Design Model Integrity.” Moreover, based on the relative importance index (RII) values, “Lack of Technical Expertise in BIM-LEAN” is the most significant challenge with a 0.89 value of RII, followed by “Lack of Government Direction and Standard Guidelines” with a 0.88 value of RII and “Financial considerations” with a 0.83 value of RII.

Originality/value

This study will help provide a new detailed overview that investigates the effects and expected benefits of integrating BIM processes and technological functionalities with lean construction principles within a synergetic environment. Moreover, the study will increase the awareness of using new technologies and management approaches in the architectural, engineering and construction industry, seeking to achieve integration between these technologies to reach ideal results in terms of the outputs of construction operations.

Details

International Journal of Lean Six Sigma, vol. 15 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of over 1000