Article
Publication date: 18 April 2023

Iman Youssefi and Tolga Celik

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost…

Abstract

Purpose

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost overrun causes. Hence, this study aims at performing a comparative analysis to evaluate the efficiency of three different approaches for TRS calculation.

Design/methodology/approach

Thirty-eight unique causes of cost overrun in urban-related construction projects were identified and a survey was conducted among construction professionals in Iran. The TRS for each cost overrun cause is calculated using single-attribute (SA), double-attribute (DA), and multiple-attribute (MA) approaches, and eventually, causes were ranked. Furthermore, principal component analysis (PCA), logistic regression analysis (LRA), and K-means clustering are utilized to compare the differences in the generated TRS using different approaches.

Findings

The results revealed that the TRS generated through the MA approach demonstrated the highest efficiency in terms of generating correlation between causes and their identified latent constructs, prediction capability, and classification of the influential causes in the same group.

Originality/value

The originality of this study primarily stems from the adoption of statistical approaches in the evaluation of the recently introduced TRS calculation approach in comparison to traditional ones. Additionally, this study proposed a modified application of the relative importance index (RII) for risk prioritization. The results from this study are expected to fulfill the gap in previous literature toward exploring the most efficient TRS calculation approach for those researchers and practitioners who seek to utilize them as a measure to identify the influential cost overrun causes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 April 2024

Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…

Abstract

Purpose

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.

Design/methodology/approach

To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance,  and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.

Findings

The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.

Originality/value

This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 January 2024

Soundarya Priya M.G., Anandh K.S., Sathyanarayanan Rajendran and Krishna Nirmalya Sen

This study aims to explore the “psychological contract of safety” (PCS), a key factor in the safety climate (SC), which relies on the behavioral safety actions of workers at…

Abstract

Purpose

This study aims to explore the “psychological contract of safety” (PCS), a key factor in the safety climate (SC), which relies on the behavioral safety actions of workers at construction sites. While numerous factors have been identified in various sectors across different countries, there is a consensus among researchers that there is a dearth of common assessment factors specifically for the Indian construction industry (ICI). Therefore, this study undertakes a systematic review of existing literature to identify the factors that determine PCS in construction and to ascertain the relative importance index (RII) of these variables and their interrelationships using structural equation modelling (SEM).

Design/methodology/approach

A structured survey was conducted among 420 professionals in the ICI to collect data. This data was then analyzed using descriptive and inferential statistical methods to derive results.

Findings

The findings of the study indicate that PCS factors have a significant impact on the construction industry (CI). The inferential analysis ranks “Safety System” as the top factor with the highest RII value. The chi-square results highlight two key SC factors that enhance and regulate an organization’s safety performance. The SEM results reveal that SC factors contribute to the improvement of PCS and influence worker safety behavior.

Originality/value

The outcomes of this study will be beneficial for stakeholders aiming to improve safety at construction sites and enhance safety performance by fulfilling the mutual safety obligations of employers and employees and by improving safety norms, procedures and policy-making. This paper also provides a theoretical framework for scholars to reassess the results in various contexts.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 23 January 2024

Chinedu Onyeme and Kapila Liyanage

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on…

67

Abstract

Purpose

This study investigates the integration of Industry 4.0 (I4.0) technologies with condition-based maintenance (CBM) in upstream oil and gas (O&G) operations, focussing on developing countries like Nigeria. The research identifies barriers to this integration and suggests solutions, intending to provide practical insights for improving operational efficiency in the O&G sector.

Design/methodology/approach

The study commenced with an exhaustive review of extant literature to identify existing barriers to I4.0 implementation and contextualise the study. Subsequent to this foundational step, primary data are gathered through the administration of carefully constructed questionnaires targeted at professionals specialised in maintenance within the upstream O&G sector. A semi-structured interview was also conducted to elicit more nuanced, contextual insights from these professionals. Analytically, the collected data were subjected to descriptive statistical methods for summarisation and interpretation with a measurement model to define the relationships between observed variables and latent construct. Moreover, the Relative Importance Index was utilised to systematically prioritise and rank the key barriers to I4.0 integration to CBM within the upstream O&G upstream sector.

Findings

The most ranked obstacles in integrating I4.0 technologies to the CBM strategy in the O&G industry are lack of budget and finance, limited engineering and technological resources, lack of support from executives and leaders of the organisations and lack of competence. Even though the journey of digitalisation has commenced in the O&G industry, there are limited studies in this area.

Originality/value

The study serves as both an academic cornerstone and a practical guide for the operational integration of I4.0 technologies within Nigeria's O&G upstream sector. Specifically, it provides an exhaustive analysis of the obstacles impeding effective incorporation into CBM practices. Additionally, the study contributes actionable insights for industry stakeholders to enhance overall performance and achieve key performance indices (KPIs).

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 9 March 2023

Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…

Abstract

Purpose

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.

Design/methodology/approach

The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.

Findings

Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.

Originality/value

This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 October 2023

Murat Gunduz, Khalid Naji and Omar Maki

This paper aims to present the development of a holistic campus facility management (CFM) performance assessment framework that incorporates a fuzzy logic approach and integrates…

Abstract

Purpose

This paper aims to present the development of a holistic campus facility management (CFM) performance assessment framework that incorporates a fuzzy logic approach and integrates a comprehensive set of key factors for successful management of campus facilities. The devised framework aims to cater to the needs of campus facilities management firms and departments for the purpose of gauging and assessing their performance across different management domains. Through this approach, facility management organizations can detect potential areas of enhancement and adopt preemptive steps to evade issues, foster progress and ensure success.

Design/methodology/approach

After a comprehensive analysis of the literature, conducting in-depth interviews with industry experts and employing the Delphi technique in two rounds, a total of 45 indicators critical to CFM success were identified and subsequently sorted into seven distinct groups. Through an online questionnaire, 402 subject-matter experts proficiently assessed the significance of the critical success indicators and their groups. A fuzzy logic framework was developed to evaluate and quantify a firm's compliance with the critical success indicators and groups of indicators. The framework was subsequently weighted using computations of the relative importance index (RII) based on the responses received from the questionnaire participants. The initial section of the framework involved a comprehensive analysis of the firm's performance vis-à-vis the indicators, while the latter part sought to evaluate the impact of the indicators groups on the overall firm's performance.

Findings

The utilization of fuzzy logic has uncovered the significant effects each effective CFM key indicator on indicators groups, as well as the distinct effects of each CFM indicators group on the overall performance of CFM. The results reveal that financial management, communications management, sustainability and environment management and workforce management are the most impactful indicators groups on the CFM performance. This suggests that it is imperative for management to allocate increased attention to these specific areas.

Originality/value

This study contributes to the advancement of current knowledge by revealing vital indicators of effective CFM and utilizing them to construct a thorough fuzzy logic framework that can assist in evaluating the effectiveness of CFM firms worldwide. This has the potential to provide crucial assistance to facility management organizations, facility managers and policymakers in their quest for informed decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 December 2022

Md. Ikramul Hoque and Muzamir Hasan

Quality is a sensitive and high-priority issue in the global construction including in Bangladesh. This research is intended to provide necessary information to stakeholders and…

Abstract

Purpose

Quality is a sensitive and high-priority issue in the global construction including in Bangladesh. This research is intended to provide necessary information to stakeholders and authorities for better management of the construction quality in Bangladesh. Therefore, this study seeks to find and prioritize the factors affecting the construction quality in Bangladesh.

Design/methodology/approach

In total 65 factors were extracted and categorized from the literature and expert panel discussion. Subsequently, these factors were designed in a questionnaire under 13 major groups for a survey where 176 construction professionals participated and returned their completed survey form. Collected data were tested by the Cronbach Alpha to check the reliability before proceeding to the Relative Importance Index (RII) analysis for determining the relative ranks of identified factors.

Findings

Statistical analysis of survey data represents that the most significant factors are: lack of management commitment, lack of technical skill and experience of the consultant, delays in progress investigation, political interference and contractor's desire for unrealistic profit. The most crucial major groups of factors influencing the construction quality are management, material, consultant, cost and time and contract-related major groups.

Originality/value

It will contribute to the body of knowledge, as it points out the impact of factors affecting quality in Bangladeshi construction. Authorities and stakeholders can be helped by the overview of the high and low ranks factors, understanding the diverse characteristics of factors and making more aware the industry about the quality issues which need to be a top concern to solve. Other developing countries that share the same socio-economic context as Bangladesh can be benefit from the results of this study to control quality issues in construction.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 August 2023

Husam Abdullah Qasem Almatari, Melissa Chan and Md Asrul Nasid Masrom

The construction industry is a major economic driver in Malaysia, playing a pivotal role in the developing nations economic growth. Malaysia's reliance on labor-driven…

344

Abstract

Purpose

The construction industry is a major economic driver in Malaysia, playing a pivotal role in the developing nations economic growth. Malaysia's reliance on labor-driven construction practices often sees local industry lagging in adopting technological advancements common to the construction sector on a global scale. This study investigates the challenges faced by project players in using new construction industrial revolution (IR) 4.0 technologies and the difficulties in implementing these technologies in construction projects.

Design/methodology/approach

A quantitative survey was distributed to 183 practitioners in the Malaysian construction industry. The collected data (N = 121) has been analyzed using statistical software to calculate relative importance index values for the identified factors. A triangulation approach to validate the factors obtained from the survey was conducted with an expert group to ensure there were no additional considerations identified in the study.

Findings

The study results show that the main factors in adopting construction IR 4.0 technologies are 1) high implementation costs, 2) hesitation to adopt technologies, 3) lack of standards, 4) legal and contractual uncertainty and 5) complexity. By investigating these factors, cost and regulation issues can gradually be resolved, with construction firms implementing new technologies, educating workers and ensuring government involvement in training for skill development to support IR 4.0.

Originality/value

The outcome of these efforts to resolve construction productivity would be beneficial in their industry impact on practice and digital transformation. Additionally, the results add to the body of knowledge for construction practitioners and technology developers to work together efficiently on the implementation of construction 4.0 technologies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 April 2022

Mohammad Nafe Assafi, Md. Ikramul Hoque and Md. Mehrab Hossain

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims…

Abstract

Purpose

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims to investigate the major delay factors causing construction delays in public-funded, mixed and private-funded construction projects of Bangladesh. Also, it offers preventive suggestions from expert stakeholders to reduce the recurrence of delays.

Design/methodology/approach

At first, an extensive literature review was conducted to identify the thirty-seven major delay factors categorized under seven groups. A questionnaire was then developed for survey at ongoing construction projects at a different division of Bangladesh. Next, data from 110 respondents were collected, and the delay factors were ranked based on the Relative Importance Index (RII); lastly, probable solutions were suggested for top-ranked delay factors based on opinions from expert stakeholders in the construction sector of Bangladesh.

Findings

The overall RII ranking of the 37 delay factors showed “Construction mistakes and defective work,” “Contract modifications by the client” and “Adverse weather condition” as the top three factors causing the delay. For public-funded projects, “Construction mistakes and defective work” and “Slow decision making by a consultant” are the top delay factors. For mixed projects, “Slow decision making of the client” and “Construction mistakes and defective work ranked top, and for private-funded projects, “Financial problems and payment delay of the client” and “Adverse weather condition” ranked top. These nuances of ranking in individual project types ascertain that the causes of delay vary in terms of project features.

Practical implications

The outcome of this project will help identify the significant delay factors based on their severity of effectiveness associated with public-funded, mixed and private-funded projects in Bangladesh. The suggestions regarding preventing these delay factors obtained through the opinions of expert stakeholders can help reduce the effect of these delays in the context of Bangladesh and in countries where the similarity in construction environment prevails.

Originality/value

Previously, studies on construction delays in Bangladesh focused mainly on identifying the delays using qualitative analysis techniques. This study is based on a unique methodology of integrating quantitative research on delay factor identification and qualitative research on preventive measures following the opinions gathered from expert stakeholders in the construction sector.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of over 1000