Search results

1 – 10 of 127
Case study
Publication date: 30 July 2018

Goutam Dutta

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to…

Abstract

S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Case study
Publication date: 26 June 2023

Prashanth Kumar Sreram and Savitha Chilakamarri

The learning outcomes of this study are as follows:1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;2…

Abstract

Learning outcomes

The learning outcomes of this study are as follows:

1) illustrate the project management failures that contributed to the fire accident at Grenfell using a fishbone diagram;

2) identify and classify the power and influence of various stakeholders involved in a brownfield project using a relevant framework; and

3) elaborate the need for following effective stakeholder management processes and project leadership, especially in the context of a refurbishment/renovation project.

Case overview/synopsis

On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60 h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Complexity academic level

Postgraduate students of construction management; final year undergraduate engineering students who have a foundational course on project management; and architects.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built environment.

Case study
Publication date: 29 October 2021

Vanita Bhoola, Vineeta Dwivedi and Ayalur Vedpuriswar

Project Management, Entrepreneurship, Risk Management, Communication.

Abstract

Subject area

Project Management, Entrepreneurship, Risk Management, Communication.

Study level/applicability

Study level: MBA and Executive Education.

Applicability: This case can be taught in the project management course. It will cover the project-planning phase, which is an iterative or progressive elaboration for the entire project lifecycle. The case will help in discussing how project management is an important discipline to manage projects and stakeholders effectively.

Case overview

The case depicts the dilemma of a passionate entrepreneur who is setting up an ambitious dairy business but project execution goes awry. The case discusses the challenges related to project planning and execution.

It captures the essence of proactive risk management, measures that can mitigate risks and create opportunities. The case also discusses the entire project lifecycle from project initiation to closure and the challenges a manager has to face in terms of stakeholder engagement, risk management, stakeholder communication and scope change.

Expected learning outcomes

To understand the alignment of the project with the organisation strategy; to learn to create a project plan and monitor and control the scope, schedule, resources and costs; to accurately estimate project costs, timelines, and quality and schedule, using tools like MS Project; to learn the risk management techniques for managing projects, teams and stakeholders; and to manage stakeholder communication effectively.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 2: Built Environment.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 1 December 2021

Roula Al Daia and Hala Khayr Yaacoub

The blast at Beirut Port on the 4th of August was the cherry on the cake in a series of disastrous governmental failures manifested in the of lack of trust, an unprecedented…

Abstract

Complexity academic level

The blast at Beirut Port on the 4th of August was the cherry on the cake in a series of disastrous governmental failures manifested in the of lack of trust, an unprecedented economic crisis, hyperinflation, financial fallout, political bottle necks, toxic environmental situation and a vertical cleavage between the government and the people. The blast resulted in billions of dollars in losses both at the port and the surrounding Beirut area, destroyed more than 300,000 housing units, displaced their residents, ruined many artifacts of cultural heritage, injured thousands of people and killed hundreds. Definitely, it was a case of negligence in the storage of the Ammonium Nitrate, corruption, irresponsible leadership or all of these together. However, investigations are still underway to pinpoint the responsible individuals and to bring them to justice. This case looks at potential ways that could have prevented the blast, by questioning the reasons behind the non-voicing out of objections against the nature of the material stored unsafely for several years in Container 12 at the Port. Through the lens of Hadi Karim, a fictional character, the authors lead the readers to consider the disaster’s characterization, as well as applicable disaster management frameworks. The case also emphasizes the role of public leadership and leads the readers to consider measures and processes that could have been abided by to prevent the disaster.

Case overview

Against the backdrop of the recent Beirut Port explosion, this case examines how events unfolded leading up to the tragedy, highlighting how it could have been avoided, as well as the managerial and ethical dimensions involved.

Leaning objectives

At the end of the case, students will be able to: 1. Characterize the disaster in terms of type and nature. 2. Analyze the blast by referring to the relevant disaster management frameworks. 3. Analyze the critical role of ethical and transformational leaders pre and post disaster. 4. Reflect on the role of employees in preventing disasters mainly through whistleblowing.

Social implications

Shedding the light on an avoidable disaster, drawing lessons to avoid the occurrence of such events in the future, and raising awareness on disaster management and on whistleblowing as a tool in the ethical leader’s toolbox.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 10: Public Sector Management.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 25 November 2019

Sergio Morales and Oswaldo Morales

The contribution of the present case lies in the critical view that every business actor should exercise – be it general manager, middle management, supervisor or executive – when…

Abstract

Learning outcomes

The contribution of the present case lies in the critical view that every business actor should exercise – be it general manager, middle management, supervisor or executive – when building a strong organizational culture in corrupt political environments.

Case overview/synopsis

The purpose of this case study is to explore the dilemma in which Marcelo Odebrecht, once CEO of Odebrecht, found/determined whether to continue with the business model established by the founders of Odebrecht or take a new path for the organization. After exploring the corrupt acts of Odebrecht and the scope of Operation Lava Jato, the reader can reflect on the importance of organizational culture (according to the three levels proposed by Schein) in the face of the emergence of corruption. By generating discussions about organizational culture, business ethics, political culture and corruption, the organizational culture of Odebrecht is problematized in relation to its real behavior.

Complexity academic level

Students of administration, business and international business undergraduates and graduates, as well as members of senior management in companies in the infrastructure sector. Also, given the plurality of possible readings, it is recommended that the case also be used in courses or specializations in organizational psychology, organizational sociology or organizational anthropology.

Supplementary materials

Teaching Notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Subject code

CSS 5: International Business.

Details

Emerald Emerging Markets Case Studies, vol. 9 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 6 July 2021

Archit Vinod Tapar, Somraj Bhattacharjee and Jitender Kumar

The case focuses on the importance of the brand-building process, which takes place in B2B companies. Commodity companies focus a lot on the sales and distribution aspect of their…

Abstract

Learning outcomes

The case focuses on the importance of the brand-building process, which takes place in B2B companies. Commodity companies focus a lot on the sales and distribution aspect of their marketing strategies but do not emphasize the importance of developing their brands. At the end of the discussion, the participants would be able: to examine the steps involved in conceptualizing the brand identity for an existing product in a highly competitive B2B market, as per Kapferer’s Brand Identity Matrix. To understand the steps involved in the journey of internal and external brand-building processes in B2B. To analyze the various challenges and issues faced by large organizations dealing in the metals and commodity business.

Case overview/synopsis

The case discusses a marketing challenge faced by Jindal Steel and Power Limited (JSPL) in launching a new brand of thermomechanical treatment (TMT) products in the market. Traditionally, the company had focused on the sales and distribution aspect of their marketing strategies but did not emphasize the importance of developing their brands. This case is based upon the challenges faced in the creation of a new brand identity for JSPL’s TMT products by the protagonist, Mr Paras Sharma (who is the brand custodian and manager in this case).

Complexity academic level

Postgraduate/Masters in Business Administration (MBA), Masters in Management Studies, Executive MBA.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 8: Marketing.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 20 January 2017

Daniel Diermeier, Robert J. Crawford and Charlotte Snyder

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong…

Abstract

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong corporate culture with a commitment to public service and independent integrity, Andersen saw its culture and standards weaken as it grew explosively and changed its mode of governance. The (A) case describes a crisis precipitated by the admission of Waste Management, a major Andersen client, that it overstated its pretax earnings by $1.43 billion from 1992 to 1996. The resulting Securities and Exchange Commission (SEC) investigation ended with Andersen paying a $7 million fine, the largest ever levied against an accounting firm, and agreeing to an injunction that effectively placed the accounting giant on probation. Students analyze the causes of Andersen's problems and advise Andersen leadership. The (B) case covers Arthur Andersen's relationship with Enron, one of the great success stories of the “new economy” boom. When Enron's aggressive use of off-balance sheet partnerships became impossible to hide in autumn 2001, news reports stated that Andersen auditors had engaged in extensive shredding of draft documents and associated communications with Enron. Students are asked to act as crisis management consultants to Andersen CEO Joe Berardino. The (C) case details Andersen's collapse following its indictment and conviction on criminal charges of obstructing justice in the Enron case. Its conviction was later overturned by the U.S. Supreme Court on narrow technical grounds, but by then Andersen had ceased to exist, eighty-nine years after Arthur E. Andersen had taken over a small accounting firm in Chicago. Students can focus on the impact of media on a reputational crisis.

Students will: Identify the teachable moment in a crisis that leaders can leverage as an opportunity to improve a firm's reputation or core identity, to reinforce values, and to drive change, Understand the impact on crisis management of the media landscape and regulatory decision-making, Realize the fragility of corporate cultures and the need to actively maintain them, especially during difficult times,

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 20 January 2017

Daniel Diermeier, Robert J. Crawford and Charlotte Snyder

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong…

Abstract

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong corporate culture with a commitment to public service and independent integrity, Andersen saw its culture and standards weaken as it grew explosively and changed its mode of governance. The (A) case describes a crisis precipitated by the admission of Waste Management, a major Andersen client, that it overstated its pretax earnings by $1.43 billion from 1992 to 1996. The resulting Securities and Exchange Commission (SEC) investigation ended with Andersen paying a $7 million fine, the largest ever levied against an accounting firm, and agreeing to an injunction that effectively placed the accounting giant on probation. Students analyze the causes of Andersen's problems and advise Andersen leadership. The (B) case covers Arthur Andersen's relationship with Enron, one of the great success stories of the “new economy” boom. When Enron's aggressive use of off-balance sheet partnerships became impossible to hide in autumn 2001, news reports stated that Andersen auditors had engaged in extensive shredding of draft documents and associated communications with Enron. Students are asked to act as crisis management consultants to Andersen CEO Joe Berardino. The (C) case details Andersen's collapse following its indictment and conviction on criminal charges of obstructing justice in the Enron case. Its conviction was later overturned by the U.S. Supreme Court on narrow technical grounds, but by then Andersen had ceased to exist, eighty-nine years after Arthur E. Andersen had taken over a small accounting firm in Chicago. Students can focus on the impact of media on a reputational crisis.

Students will: Identify the teachable moment in a crisis that leaders can leverage as an opportunity to improve a firm's reputation or core identity, to reinforce values, and to drive change, Understand the impact on crisis management of the media landscape and regulatory decision-making, Realize the fragility of corporate cultures and the need to actively maintain them, especially during difficult times,

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 20 January 2017

Daniel Diermeier, Robert J. Crawford and Charlotte Snyder

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong…

Abstract

The cases describe the demise of Arthur Andersen, a firm that had long set the industry standard for professionalism in accounting and auditing. Once an example of strong corporate culture with a commitment to public service and independent integrity, Andersen saw its culture and standards weaken as it grew explosively and changed its mode of governance. The (A) case describes a crisis precipitated by the admission of Waste Management, a major Andersen client, that it overstated its pretax earnings by $1.43 billion from 1992 to 1996. The resulting Securities and Exchange Commission (SEC) investigation ended with Andersen paying a $7 million fine, the largest ever levied against an accounting firm, and agreeing to an injunction that effectively placed the accounting giant on probation. Students analyze the causes of Andersen's problems and advise Andersen leadership. The (B) case covers Arthur Andersen's relationship with Enron, one of the great success stories of the “new economy” boom. When Enron's aggressive use of off-balance sheet partnerships became impossible to hide in autumn 2001, news reports stated that Andersen auditors had engaged in extensive shredding of draft documents and associated communications with Enron. Students are asked to act as crisis management consultants to Andersen CEO Joe Berardino. The (C) case details Andersen's collapse following its indictment and conviction on criminal charges of obstructing justice in the Enron case. Its conviction was later overturned by the U.S. Supreme Court on narrow technical grounds, but by then Andersen had ceased to exist, eighty-nine years after Arthur E. Andersen had taken over a small accounting firm in Chicago. Students can focus on the impact of media on a reputational crisis.

Students will: Identify the teachable moment in a crisis that leaders can leverage as an opportunity to improve a firm's reputation or core identity, to reinforce values, and to drive change, Understand the impact on crisis management of the media landscape and regulatory decision-making, Realize the fragility of corporate cultures and the need to actively maintain them, especially during difficult times,

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 31 August 2021

Elikplimi Komla Agbloyor, Frank Kwakutse Ametefe, Emmanuel Sarpong-Kumankoma and Vera Fiador

After completing this case, students should be able to: identify and compute relevant cash flows in relation to a real estate project and compute the net present value (NPV)…

Abstract

Learning outcomes

After completing this case, students should be able to: identify and compute relevant cash flows in relation to a real estate project and compute the net present value (NPV). Determine the target return or cost of capital (by looking at historical economic indicators). Design or formulate a sensitivity analysis to determine the drivers of the project value. Evaluate real estate and other investments taking qualitative and quantitative factors into consideration. Demonstrate the computation of a break-even rate to determine the minimum or maximum revenue or cost required for a project to be viable.

Case overview/synopsis

This case study is about the Golden Beak Securities Pension Fund that wanted to invest in a Hostel Project in one of the universities in Ghana. Most universities in Ghana faced an acute shortage of on-campus accommodation. Also, the Government of Ghana, in 2017, implemented a programme to make Senior High School in Ghana free. This was expected to increase the number of students who will enter the existing universities. The project was therefore seen as strategic, as it would help ease the pressure of on-campus accommodation while providing diversification for the pension fund. As part of the investment committee’s (IC) quest to improve the skill set available to it, especially in relation to real estate investments, Esi Abebrese was appointed as one of the members of the IC of GSB. Her main task was to collect information on key macroeconomic variables, as well as granular information on project costs and revenues and conduct investment appraisal. Esi was scheduled to make a presentation to the IC on the 15th of October 2019 following which the Committee will debate and make a decision. The project had an estimated cost of GH¢52m with a total number of 3,424 student beds and ancillary facilities. Undertaking the project required moving funds from investments in money market securities with one of the banks in Ghana. The investments in the money market securities were currently yielding about 16% a year. The determination of the cost of capital was critical and Esi and Nana eventually settled on a long-term weighted average cost of capital of 14%. This was after considering the trend of inflation, monetary policy rates, treasury rates, stock market returns and a report on returns on commercial real estate properties in Ghana. An exit capitalisation rate of 20% was also estimated for the purposes of determining the value of the property at the end of the investment horizon. Esi also obtained estimates of cost and revenue for the project and proceeded to carry out a feasibility analysis on the project. This consisted of an NPV analysis and sensitivity analysis on various factors to determine the drivers of the project value. The IC had to take several factors (both quantitative and qualitative) into consideration before making a decision. Esi believed that these factors included the diversification of the fund’s assets, the return on investment, potential oversupply of hostel accommodation, the social responsibility of providing student accommodation and the impact of any prolonged shutdown of the university.

Complexity academic level

Masters/advanced undergraduate.

Supplementary materials

Teaching Notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Subject code

CSS 1: Accounting and Finance.

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

1 – 10 of 127