Search results

1 – 10 of 483
Article
Publication date: 28 February 2023

Lin-Lin Xie, Yajiao Chen, Sisi Wu, Rui-Dong Chang and Yilong Han

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to…

Abstract

Purpose

Project scheduling plays an essential role in the implementation of a project due to the limitation of resources in practical projects. However, the existing research tend to focus on finding suitable algorithms to solve various scheduling problems and fail to find the potential scheduling rules in these optimal or near-optimal solutions, that is, the possible intrinsic relationships between attributes related to the scheduling of activity sequences. Data mining (DM) is used to analyze and interpret data to obtain valuable information stored in large-scale data. The goal of this paper is to use DM to discover scheduling concepts and obtain a set of rules that approximate effective solutions to resource-constrained project scheduling problems. These rules do not require any search and simulation, which have extremely low time complexity and support real-time decision-making to improve planning/scheduling.

Design/methodology/approach

The resource-constrained project scheduling problem can be described as scheduling a group of interrelated activities to optimize the project completion time and other objectives while satisfying the activity priority relationship and resource constraints. This paper proposes a new approach to solve the resource-constrained project scheduling problem by combining DM technology and the genetic algorithm (GA). More specifically, the GA is used to generate various optimal project scheduling schemes, after that C4.5 decision tree (DT) is adopted to obtain valuable knowledge from these schemes for further predicting and solving new scheduling problems.

Findings

In this study, the authors use GA and DM technology to analyze and extract knowledge from a large number of scheduling schemes, and determine the scheduling rule set to minimize the completion time. In order to verify the application effect of the proposed DT classification model, the J30, J60 and J120 datasets in PSPLIB are used to test the validity of the scheduling rules. The results show that DT can readily duplicate the excellent performance of GA for scheduling problems of different scales. In addition, the DT prediction model developed in this study is applied to a high-rise residential project consisting of 117 activities. The results show that compared with the completion time obtained by GA, the DT model can realize rapid adjustment of project scheduling problem to deal with the dynamic environment interference. In a word, the data-based approach is feasible, practical and effective. It not only captures the knowledge contained in the known optimal scheduling schemes, but also helps to provide a flexible scheduling decision-making approach for project implementation.

Originality/value

This paper proposes a novel knowledge-based project scheduling approach. In previous studies, intelligent optimization algorithm is often used to solve the project scheduling problem. However, although these intelligent optimization algorithms can generate a set of effective solutions for problem instances, they are unable to explain the process of decision-making, nor can they identify the characteristics of good scheduling decisions generated by the optimization process. Moreover, their calculation is slow and complex, which is not suitable for planning and scheduling complex projects. In this study, the set of effective solutions of problem instances is taken as the training dataset of DM algorithm, and the extracted scheduling rules can provide the prediction and solution of new scheduling problems. The proposed method focuses on identifying the key parameters of a specific dynamic scheduling environment, which can not only reproduces the scheduling performance of the original algorithm well, but also has the ability to make decisions quickly under the dynamic interference construction scenario. It is helpful for project managers to implement quick decisions in response to construction emergencies, which is of great practical significance for improving the flexibility and efficiency of construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 14 March 2024

Zabih Ghelichi, Monica Gentili and Pitu Mirchandani

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to…

171

Abstract

Purpose

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to perform analytical studies, evaluate the performance of drone delivery systems for humanitarian logistics and can support the decision-making on the operational design of the system – on where to locate drone take-off points and on assignment and scheduling of delivery tasks to drones.

Design/methodology/approach

This simulation model captures the dynamics and variabilities of the drone-based delivery system, including demand rates, location of demand points, time-dependent parameters and possible failures of drones’ operations. An optimization model integrated with the simulation system can update the optimality of drones’ schedules and delivery assignments.

Findings

An extensive set of experiments was performed to evaluate alternative strategies to demonstrate the effectiveness for the proposed optimization/simulation system. In the first set of experiments, the authors use the simulation-based evaluation tool for a case study for Central Florida. The goal of this set of experiments is to show how the proposed system can be used for decision-making and decision-support. The second set of experiments presents a series of numerical studies for a set of randomly generated instances.

Originality/value

The goal is to develop a simulation system that can allow one to evaluate performance of drone-based delivery systems, accounting for the uncertainties through simulations of real-life drone delivery flights. The proposed simulation model captures the variations in different system parameters, including interval of updating the system after receiving new information, demand parameters: the demand rate and their spatial distribution (i.e. their locations), service time parameters: travel times, setup and loading times, payload drop-off times and repair times and drone energy level: battery’s energy is impacted and requires battery change/recharging while flying.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 22 June 2022

Suvarna Abhijit Patil and Prasad Kishor Gokhale

With the advent of AI-federated technologies, it is feasible to perform complex tasks in industrial Internet of Things (IIoT) environment by enhancing throughput of the network…

Abstract

Purpose

With the advent of AI-federated technologies, it is feasible to perform complex tasks in industrial Internet of Things (IIoT) environment by enhancing throughput of the network and by reducing the latency of transmitted data. The communications in IIoT and Industry 4.0 requires handshaking of multiple technologies for supporting heterogeneous networks and diverse protocols. IIoT applications may gather and analyse sensor data, allowing operators to monitor and manage production systems, resulting in considerable performance gains in automated processes. All IIoT applications are responsible for generating a vast set of data based on diverse characteristics. To obtain an optimum throughput in an IIoT environment requires efficiently processing of IIoT applications over communication channels. Because computing resources in the IIoT are limited, equitable resource allocation with the least amount of delay is the need of the IIoT applications. Although some existing scheduling strategies address delay concerns, faster transmission of data and optimal throughput should also be addressed along with the handling of transmission delay. Hence, this study aims to focus on a fair mechanism to handle throughput, transmission delay and faster transmission of data. The proposed work provides a link-scheduling algorithm termed as delay-aware resource allocation that allocates computing resources to computational-sensitive tasks by reducing overall latency and by increasing the overall throughput of the network. First of all, a multi-hop delay model is developed with multistep delay prediction using AI-federated neural network long–short-term memory (LSTM), which serves as a foundation for future design. Then, link-scheduling algorithm is designed for data routing in an efficient manner. The extensive experimental results reveal that the average end-to-end delay by considering processing, propagation, queueing and transmission delays is minimized with the proposed strategy. Experiments show that advances in machine learning have led to developing a smart, collaborative link scheduling algorithm for fairness-driven resource allocation with minimal delay and optimal throughput. The prediction performance of AI-federated LSTM is compared with the existing approaches and it outperforms over other techniques by achieving 98.2% accuracy.

Design/methodology/approach

With an increase of IoT devices, the demand for more IoT gateways has increased, which increases the cost of network infrastructure. As a result, the proposed system uses low-cost intermediate gateways in this study. Each gateway may use a different communication technology for data transmission within an IoT network. As a result, gateways are heterogeneous, with hardware support limited to the technologies associated with the wireless sensor networks. Data communication fairness at each gateway is achieved in an IoT network by considering dynamic IoT traffic and link-scheduling problems to achieve effective resource allocation in an IoT network. The two-phased solution is provided to solve these problems for improved data communication in heterogeneous networks achieving fairness. In the first phase, traffic is predicted using the LSTM network model to predict the dynamic traffic. In the second phase, efficient link selection per technology and link scheduling are achieved based on predicted load, the distance between gateways, link capacity and time required as per different technologies supported such as Bluetooth, Wi-Fi and Zigbee. It enhances data transmission fairness for all gateways, resulting in more data transmission achieving maximum throughput. Our proposed approach outperforms by achieving maximum network throughput, and less packet delay is demonstrated using simulation.

Findings

Our proposed approach outperforms by achieving maximum network throughput, and less packet delay is demonstrated using simulation. It also shows that AI- and IoT-federated devices can communicate seamlessly over IoT networks in Industry 4.0.

Originality/value

The concept is a part of the original research work and can be adopted by Industry 4.0 for easy and seamless connectivity of AI and IoT-federated devices.

Details

International Journal of Pervasive Computing and Communications, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1742-7371

Keywords

Article
Publication date: 10 November 2023

Yong Gui and Lanxin Zhang

Influenced by the constantly changing manufacturing environment, no single dispatching rule (SDR) can consistently obtain better scheduling results than other rules for the…

Abstract

Purpose

Influenced by the constantly changing manufacturing environment, no single dispatching rule (SDR) can consistently obtain better scheduling results than other rules for the dynamic job-shop scheduling problem (DJSP). Although the dynamic SDR selection classifier (DSSC) mined by traditional data-mining-based scheduling method has shown some improvement in comparison to an SDR, the enhancement is not significant since the rule selected by DSSC is still an SDR.

Design/methodology/approach

This paper presents a novel data-mining-based scheduling method for the DJSP with machine failure aiming at minimizing the makespan. Firstly, a scheduling priority relation model (SPRM) is constructed to determine the appropriate priority relation between two operations based on the production system state and the difference between their priority values calculated using multiple SDRs. Subsequently, a training sample acquisition mechanism based on the optimal scheduling schemes is proposed to acquire training samples for the SPRM. Furthermore, feature selection and machine learning are conducted using the genetic algorithm and extreme learning machine to mine the SPRM.

Findings

Results from numerical experiments demonstrate that the SPRM, mined by the proposed method, not only achieves better scheduling results in most manufacturing environments but also maintains a higher level of stability in diverse manufacturing environments than an SDR and the DSSC.

Originality/value

This paper constructs a SPRM and mines it based on data mining technologies to obtain better results than an SDR and the DSSC in various manufacturing environments.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 February 2022

Fei Xie, Jun Yan and Jun Shen

Although proactive fault handling plans are widely spread, many unexpected data center outages still occurred. To rescue the jobs from faulty data centers, the authors propose a…

Abstract

Purpose

Although proactive fault handling plans are widely spread, many unexpected data center outages still occurred. To rescue the jobs from faulty data centers, the authors propose a novel independent job rescheduling strategy for cloud resilience to reschedule the task from the faulty data center to other working-proper cloud data centers, by jointly considering job nature, timeline scenario and overall cloud performance.

Design/methodology/approach

A job parsing system and a priority assignment system are developed to identify the eligible time slots for the jobs and prioritize the jobs, respectively. A dynamic job rescheduling algorithm is proposed.

Findings

The simulation results show that our proposed approach has better cloud resiliency and load balancing performance than the HEFT series approaches.

Originality/value

This paper contributes to the cloud resilience by developing a novel job prioritizing, task rescheduling and timeline allocation method when facing faults.

Details

Applied Computing and Informatics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-1964

Keywords

Article
Publication date: 22 September 2023

Chengkuan Zeng, Shiming Chen and Chongjun Yan

This study addresses the production optimization of a cellular manufacturing system (CMS) in magnetic production enterprises. Magnetic products and raw materials are more critical…

Abstract

Purpose

This study addresses the production optimization of a cellular manufacturing system (CMS) in magnetic production enterprises. Magnetic products and raw materials are more critical to transport than general products because the attraction or repulsion between magnetic poles can easily cause traffic jams. This study needs to address a method to promote the scheduling efficiency of the problem.

Design/methodology/approach

To address this problem, this study formulated a mixed-integer linear programming (MILP) model to describe the problem and proposed an auction and negotiation-based approach with a local search to solve it. Auction- and negotiation-based approaches can obtain feasible and high-quality solutions. A local search operator was proposed to optimize the feasible solutions using an improved conjunctive graph model.

Findings

Verification tests were performed on a series of numerical examples. The results demonstrated that the proposed auction and negotiation-based approach with a local search operator is better than existing solution methods for the problem identified. Statistical analysis of the experiment results using the Statistical Package for the Social Sciences (SPSS) software demonstrated that the proposed approach is efficient, stable and suitable for solving large-scale numerical instances.

Originality/value

An improved auction and negotiation-based approach was proposed; The conjunctive graph model was also improved to describe the problem of CMS with traffic jam constraint and build the local search operator; The authors’ proposed approach can get better solution than the existing algorithms by testing benchmark instances and real-world instances from enterprises.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 19 April 2023

Sameh M. Saad, Ramin Bahadori, Chandan Bhovar and Hongwei Zhang

This paper aims to analyse the current state of research to identify the link between Lean Manufacturing and Industry 4.0 (I4.0) technologies to map out different research themes…

Abstract

Purpose

This paper aims to analyse the current state of research to identify the link between Lean Manufacturing and Industry 4.0 (I4.0) technologies to map out different research themes, to uncover research gaps and propose key recommendations for future research, including lessons to be learnt from the integration of lean and I4.0.

Design/methodology/approach

A systematic literature review (SLR) is conducted to thematically analyse and synthesise existing literature on Lean Manufacturing–I4.0 integration. The review analysed 60 papers in peer-reviewed journals.

Findings

In total, five main research themes were identified, and a thematic map was created to explore the following: the relationship between Lean Manufacturing and I4.0; Lean Manufacturing and I4.0 implication on performance; Lean Manufacturing and I4.0 framework; Lean Manufacturing and I4.0 integration with other methodologies; and application of I4.0 technologies in Lean Manufacturing. Furthermore, various gaps in the literature were identified, and key recommendations for future directions were proposed.

Research limitations/implications

The integration of Lean Manufacturing and I4.0 will eventually bring many benefits and offers superior and long-term competitive advantages. This research reveals the need for more analysis to thoroughly examine how this can be achieved in real life and promote operational changes that ensure enterprises run more sustainably.

Originality/value

The development of Lean Manufacturing and I4.0 integration is still in its infancy, with most articles in this field published in the past two years. The five main research themes identified through thematic synthesis are provided in the original contribution. This provides scholars better insight into the existing literature related to Lean Manufacturing and I4.0, further contributing to defining clear topics for future research opportunities. It also has important implications for industrialists, who can develop more profound and richer knowledge than Lean and I4.0, which would, in turn, help them develop more effective deployment strategies and have a positive commercial impact.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 February 2024

Emanuele Gabriel Margherita and Alessio Maria Braccini

This paper uses dialectical inquiry to explore tensions that arise when adopting Industry 4.0 technologies in a lean production system and their reconciliation mechanisms.

Abstract

Purpose

This paper uses dialectical inquiry to explore tensions that arise when adopting Industry 4.0 technologies in a lean production system and their reconciliation mechanisms.

Design/methodology/approach

We conducted an in-depth qualitative case study over a 3-year period on an Italian division of an international electrotechnical organisation that produces electrical switches. This organisation successfully adopted Industry 4.0 technologies in a lean production system. The study is based on primary data such as observations and semi-structured interviews, along with secondary data.

Findings

We identify four empirically validated dialectic tensions arising across different Industry 4.0 adoption stages due to managers’ and workers’ contrasting interpretations of technologies. Consequently, we define the related reconciliation mechanisms that allow the effective adoption of various Industry 4.0 technologies to support a lean production system.

Originality/value

This is the first empirical investigation of tensions in the adoption of Industry 4.0 technologies in a lean production system. Furthermore, the paper presents four theoretical propositions and a conceptual model describing which tensions arise during the adoption of Industry 4.0 technologies in a lean production system and the reconciliation mechanisms that prevent lean production system deterioration.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 1 August 2023

Frank Ato Ghansah and Weisheng Lu

Despite the growing attention on the relevance of improved building management systems with cognition in recent years in the architecture, engineering, construction and operation…

Abstract

Purpose

Despite the growing attention on the relevance of improved building management systems with cognition in recent years in the architecture, engineering, construction and operation (AECO) community, no review has been conducted to understand the human-environment interaction features of cyber-physical systems (CPS) and digital twins (DTs) in developing the concept of a cognitive building (CB). Thus, this paper aims to review existing studies on CPS and DTs for CB to propose a comprehensive system architecture that considers human-environment interactions.

Design/methodology/approach

Scientometric analysis and content analysis were adopted for this study.

Findings

The scientometric analysis of 1,042 journal papers showed the major themes of CPS/DTs for CB, and these can be categorized into three key technologies to realize CB in the AECO community: CPS, DTs and cognitive computing (CC). Content analysis of 44 relevant publications in the built environment assisted in understanding and evidently confirming the claim of this study on the integration of CPS and DTs for CB in construction by also involving the CC. It is found and confirmed that CB can be realized with CPS and DTs along with the CC. A CB system architecture (CBSA) is proposed from the three key technologies considering the human-environment interactions in the loop. The study discovered the potential applications of the CBSA across the building lifecycle phases, including the design, construction and operations and maintenance, with the potential promise of endowing resilience, intelligence, greater efficiency and self-adaptiveness. Based on the findings of the review, four research directions are proposed: human-environment interactions, CB for sustainable building performance, CB concept for modular buildings and moving beyond CB.

Originality/value

This study stands out for comprehensively surveying the intellectual core and the landscape of the general body of knowledge on CPS/DTs for CB in the built environment. It makes a distinctive contribution to knowledge as it does not only propose CBSA by integrating CPS and DTs along with CC but also suggests some potential practical applications. These may require expert judgments and real case examples to enhance reproducibility and validation.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 483