Search results
1 – 6 of 6Nirodha Fernando, Kasun Dilshan T.A. and Hexin (Johnson) Zhang
The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial…
Abstract
Purpose
The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial forecasted budget to have transparency in transactions. Early cost estimating is challenging for Quantity Surveyors due to incomplete project details at the initial stage and the unavailability of standard cost estimating techniques for bridge projects. To mitigate the difficulties in the traditional preliminary cost estimating methods, there is a requirement to develop a new initial cost estimating model which is accurate, user friendly and straightforward. The research was carried out in Sri Lanka, and this paper aims to develop the artificial neural network (ANN) model for an early cost estimate of concrete bridge systems.
Design/methodology/approach
The construction cost data of 30 concrete bridge projects which are in Sri Lanka constructed within the past ten years were trained and tested to develop an ANN cost model. Backpropagation technique was used to identify the number of hidden layers, iteration and momentum for optimum neural network architectures.
Findings
An ANN cost model was developed, furnishing the best result since it succeeded with around 90% validation accuracy. It created a cost estimation model for the public sector as an accurate, heuristic, flexible and efficient technique.
Originality/value
The research contributes to the current body of knowledge by providing the most accurate early-stage cost estimate for the concrete bridge systems in Sri Lanka. In addition, the research findings would be helpful for stakeholders and policymakers to propose policy recommendations that positively influence the prediction of the most accurate cost estimate for concrete bridge construction projects in Sri Lanka and other developing countries.
Details
Keywords
Monika Prakash, Mohammed Ashraf, Pinaz Tiwari and Nimit Chowdhary
Although the concept of destination is often described as an economic term that describes places of interest for tourists and visitors, currently, there is still little awareness…
Abstract
Although the concept of destination is often described as an economic term that describes places of interest for tourists and visitors, currently, there is still little awareness in the extant literature about regional, city, village, resort, or even standalone tourist destinations. This chapter aims to clarify the meaning of destinations. It distinguishes the differences between common locations and tourist destinations. It uses case studies to describe places, placemaking, and the experiencescapes of various destinations. This contribution implies that tourist attractions differentiate themselves from other places, as they offer accessible attractions with amenities.
Details
Keywords
Xiwen Zhang, Zhen Zhang, Wenhao Sun, Jilei Hu, Liangliang Zhang and Weidong Zhu
Under the repeated action of the construction load, opening deformation and disturbed deformation occurred at the precast box culvert joints of the shield tunnel. The objective of…
Abstract
Purpose
Under the repeated action of the construction load, opening deformation and disturbed deformation occurred at the precast box culvert joints of the shield tunnel. The objective of this paper is to investigate the effect of construction vehicle loading on the mechanical deformation characteristics of the internal structure of a large-diameter shield tunnel during the entire construction period.
Design/methodology/approach
The structural response of the prefabricated internal structure under heavy construction vehicle loads at four different construction stages (prefabricated box culvert installation, curved lining cast-in-place, lane slab installation and pavement structure casting) was analyzed through field tests and ABAQUS (finite element analysis software) numerical simulation.
Findings
Heavy construction vehicles can cause significant mechanical impacts on the internal structure, as the construction phase progresses, the integrity of the internal structure with the tunnel section increases. The vertical and horizontal deformation of the internal structure is significantly reduced, and the overall stress level of the internal structure is reduced. The bolts connecting the precast box culvert have the maximum stress at the initial stage of construction, as the construction proceeds the stress distribution among the bolts gradually becomes uniform.
Originality/value
This study can provide a reference for the design model, theoretical analysis and construction technology of the internal structure during the construction of large-diameter tunnel projects.
Details
Keywords
In the new development stage of comprehensively building a socialist modern state, it is imperative to adhere to the guidance of Xi Jinping Thought on Socialism with Chinese…
Abstract
Purpose
In the new development stage of comprehensively building a socialist modern state, it is imperative to adhere to the guidance of Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, comprehensively summarize China's practical experiences in economic development, strengthen research on capital issues, construct theories of socialist political economy with Chinese characteristics regarding capital and provide scientific theoretical guidance for further promoting the positive role of various types of capital while preventing and overcoming their negative effects, which is a major theoretical issue and a glorious task for the theoretical and economic circles in China.
Design/methodology/approach
From the perspective of Marx's theory on capital and historical development, modern capital represents the organizational mode of socialized mass production and market economy. It serves as both the economic foundation of bourgeois society and a tool for socialist economic development.
Findings
The market economy represents an inevitable historical stage and form of socialist economic development, necessitating the adoption of capital as an organizational form within socialist economies.
Originality/value
The utilization of capital to advance a socialist economy is a remarkable achievement by the CPC and Chinese people, representing a significant innovation in both theory and practice. The role of capital is inherently dual under any social condition. In the context of a socialist system, capital can play a positive role effectively, and its behavior can be guided and regulated correctly to curb its negative or even destructive impact.
Details
Keywords
Shilong Zhang, Changyong Liu, Kailun Feng, Chunlai Xia, Yuyin Wang and Qinghe Wang
The swivel construction method is a specially designed process used to build bridges that cross rivers, valleys, railroads and other obstacles. To carry out this construction…
Abstract
Purpose
The swivel construction method is a specially designed process used to build bridges that cross rivers, valleys, railroads and other obstacles. To carry out this construction method safely, real-time monitoring of the bridge rotation process is required to ensure a smooth swivel operation without collisions. However, the traditional means of monitoring using Electronic Total Station tools cannot realize real-time monitoring, and monitoring using motion sensors or GPS is cumbersome to use.
Design/methodology/approach
This study proposes a monitoring method based on a series of computer vision (CV) technologies, which can monitor the rotation angle, velocity and inclination angle of the swivel construction in real-time. First, three proposed CV algorithms was developed in a laboratory environment. The experimental tests were carried out on a bridge scale model to select the outperformed algorithms for rotation, velocity and inclination monitor, respectively, as the final monitoring method in proposed method. Then, the selected method was implemented to monitor an actual bridge during its swivel construction to verify the applicability.
Findings
In the laboratory study, the monitoring data measured with the selected monitoring algorithms was compared with those measured by an Electronic Total Station and the errors in terms of rotation angle, velocity and inclination angle, were 0.040%, 0.040%, and −0.454%, respectively, thus validating the accuracy of the proposed method. In the pilot actual application, the method was shown to be feasible in a real construction application.
Originality/value
In a well-controlled laboratory the optimal algorithms for bridge swivel construction are identified and in an actual project the proposed method is verified. The proposed CV method is complementary to the use of Electronic Total Station tools, motion sensors, and GPS for safety monitoring of swivel construction of bridges. It also contributes to being a possible approach without data-driven model training. Its principal advantages are that it both provides real-time monitoring and is easy to deploy in real construction applications.
Details