Search results

1 – 10 of 65
Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 2 January 2024

Eylem Thron, Shamal Faily, Huseyin Dogan and Martin Freer

Railways are a well-known example of complex critical infrastructure, incorporating socio-technical systems with humans such as drivers, signallers, maintainers and passengers at…

Abstract

Purpose

Railways are a well-known example of complex critical infrastructure, incorporating socio-technical systems with humans such as drivers, signallers, maintainers and passengers at the core. The technological evolution including interconnectedness and new ways of interaction lead to new security and safety risks that can be realised, both in terms of human error, and malicious and non-malicious behaviour. This study aims to identify the human factors (HF) and cyber-security risks relating to the role of signallers on the railways and explores strategies for the improvement of “Digital Resilience” – for the concept of a resilient railway.

Design/methodology/approach

Overall, 26 interviews were conducted with 21 participants from industry and academia.

Findings

The results showed that due to increased automation, both cyber-related threats and human error can impact signallers’ day-to-day operations – directly or indirectly (e.g. workload and safety-critical communications) – which could disrupt the railway services and potentially lead to safety-related catastrophic consequences. This study identifies cyber-related problems, including external threats; engineers not considering the human element in designs when specifying security controls; lack of security awareness among the rail industry; training gaps; organisational issues; and many unknown “unknowns”.

Originality/value

The authors discuss socio-technical principles through a hexagonal socio-technical framework and training needs analysis to mitigate against cyber-security issues and identify the predictive training needs of the signallers. This is supported by a systematic approach which considers both, safety and security factors, rather than waiting to learn from a cyber-attack retrospectively.

Details

Information & Computer Security, vol. 32 no. 2
Type: Research Article
ISSN: 2056-4961

Keywords

Book part
Publication date: 19 March 2024

Noah McClain

In the mid-2000s, the operator of New York City’s mass transit network committed more than a half-billion dollars to military contractor Lockheed Martin for a security technology…

Abstract

In the mid-2000s, the operator of New York City’s mass transit network committed more than a half-billion dollars to military contractor Lockheed Martin for a security technology capable, in part, of inferring threats based on analysis of data streams, of developing response strategies, and taking automated action toward alerts and calamities in light of evolving circumstances. The project was a failure. This chapter explores the conceptualization and development of this technology – rooted in cybernetics – and compares its conceptual underpinnings with some situated problems of awareness, communication, coordination, and action in emergencies as they unfold in one of the busiest transport systems in the world, the New York subway. The author shows how the technology, with all the theatrical trappings of a “legitimate” security solution, was apparently conceived without a grounded understanding of actual use-cases, and the degree to which the complex interactions which give rise to subway emergency can be anticipated in – and therefore managed through – a technological system. As a case-study, the chapter illustrates the pitfalls of deploying technology against problems which are not well-defined in the first place, to the neglect of investments against much more fundamental problems – such as inadequate communication systems, and unstable relationships with emergency response agencies – which might offer guaranteed benefits, and indeed lay a firm groundwork for future deployment of more ambitious technology.

Details

Technology vs. Government: The Irresistible Force Meets the Immovable Object
Type: Book
ISBN: 978-1-83867-951-4

Keywords

Article
Publication date: 20 March 2024

Vinod Bhatia and K. Kalaivani

Indian railways (IR) is one of the largest railway networks in the world. As a part of its strategic development initiative, demand forecasting can be one of the indispensable…

Abstract

Purpose

Indian railways (IR) is one of the largest railway networks in the world. As a part of its strategic development initiative, demand forecasting can be one of the indispensable activities, as it may provide basic inputs for planning and control of various activities such as coach production, planning new trains, coach augmentation and quota redistribution. The purpose of this study is to suggest an approach to demand forecasting for IR management.

Design/methodology/approach

A case study is carried out, wherein several models i.e. automated autoregressive integrated moving average (auto-ARIMA), trigonometric regressors (TBATS), Holt–Winters additive model, Holt–Winters multiplicative model, simple exponential smoothing and simple moving average methods have been tested. As per requirements of IR management, the adopted research methodology is predominantly discursive, and the passenger reservation patterns over a five-year period covering a most representative train service for the past five years have been employed. The relative error matrix and the Akaike information criterion have been used to compare the performance of various models. The Diebold–Mariano test was conducted to examine the accuracy of models.

Findings

The coach production strategy has been proposed on the most suitable auto-ARIMA model. Around 6,000 railway coaches per year have been produced in the past 3 years by IR. As per the coach production plan for the year 2023–2024, a tentative 6551 coaches of various types have been planned for production. The insights gained from this paper may facilitate need-based coach manufacturing and optimum utilization of the inventory.

Originality/value

This study contributes to the literature on rail ticket demand forecasting and adds value to the process of rolling stock management. The proposed model can be a comprehensive decision-making tool to plan for new train services and assess the rolling stock production requirement on any railway system. The analysis may help in making demand predictions for the busy season, and the management can make important decisions about the pricing of services.

Details

foresight, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-6689

Keywords

Article
Publication date: 16 April 2024

Xiaobo Shi, Yaning Qiao, Xinyu Zhao, Yan Liu, Chenchen Liu, Ruopeng Huang and Yuanlong Cui

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or…

Abstract

Purpose

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or terrorist attacks, to reduce passenger injuries or life losses. The emergency evacuation capacity (EEC) of a subway station needs to be revised timely, in case passenger demand increases or the evacuation route changes in the future. However, traditional ways of estimating EEC, e.g. fire drills are time- and resource-consuming and are difficult to revise from time to time. The purpose of this study is to establish an intuitive modelling approach to increase the EEC of subway stations in a stepwised manner.

Design/methodology/approach

This study develops an approach to combine agent-based evacuation modelling and building information modelling (BIM) technology to estimate the total evacuation time of a subway station.

Findings

Evacuation time can be saved (33% in the studied case) from iterative improvements including stopping escalators running against the evacuation flow and modifying the geometry around escalator exits. Such iterative improvements rely on integrating agent-based modelling and BIM.

Originality/value

The agent-based model can provide a more realistic simulation of intelligent individual movements under emergency circumstances and provides precise feedback on locations of evacuation bottlenecks. This study also examined the effectiveness of two rounds of stepwise improvements in terms of operation or design to increase the EEC of the station.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 27 September 2022

Annalisa Metta

This paper aims to explore the topic of adaptive reuse referring to urban open spaces into a more-than-human perspective. It underlines that dealing with heritage means being part…

1096

Abstract

Purpose

This paper aims to explore the topic of adaptive reuse referring to urban open spaces into a more-than-human perspective. It underlines that dealing with heritage means being part of an inherent and ongoing process of transformation and so that reuse is inextricably an adaptive practice, constantly facing mutations, and that adaptation is a coral practice that involves different kinds of users and makers, inclusive of human and not human livings.

Design/methodology/approach

This paper looks at the lexicon of abandonment, in search of the more essential and intense meanings of words, and at some pioneering practices in Europe to comprehend the aesthetic and ethical implications of adaptive reuse of neglected landscapes.

Findings

Processes of reuse involve many different communities of users who in turn continuously redesign the site, into a comprehensive, coral and conflicting collaboration, whose results are never given once for all and are both uncanny and beautiful, scaring and marvellous, like a monster.

Practical implications

Accepting the idea that humans are not the only users and makers of urban sites can widen the range of tools, methods and values involved in heritage adaptive reuse.

Originality/value

This paper tries to widen the meanings of adaptation into a multispecies perspective. It intends to broaden the range of agents that can be involved as users and makers, assuming a more-than-human point of view that is not yet commonly applied.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 14 no. 1
Type: Research Article
ISSN: 2044-1266

Keywords

Open Access
Article
Publication date: 23 January 2024

Rubens C.N. Oliveira and Zhipeng Zhang

The purpose of this study is to address the extended travel time caused by dwelling time at stations for passengers on traditional rail transit lines. To mitigate this issue, the…

Abstract

Purpose

The purpose of this study is to address the extended travel time caused by dwelling time at stations for passengers on traditional rail transit lines. To mitigate this issue, the authors propose the “Non-stop” design, which involves trains comprised of modular vehicles that can couple and uncouple from each other during operation, thereby eliminating dwelling time at stations..

Design/methodology/approach

The main contributions of this paper are threefold: first, to introduce the concept of non-stop rail transit lines, which, to the best of the authors’ knowledge, has not been researched in the literature; second, to develop a framework for the operation schedule of such a line; and third, the author evaluate the potential of its implementation in terms of total passenger travel time.

Findings

The total travel time was reduced by 6% to 32.91%. The results show that the savings were more significant for long commutes and low train occupancy rates.

Research limitations/implications

The non-stop system can improve existing lines without the need for the construction of additional facilities, but it requires technological advances for rolling stock.

Originality/value

To eliminate dwelling time at stations, the authors present the “Non-stop” design, which is based on trains composed of locomotives that couple and uncouple from each other during operation, which to the best of the authors’ knowledge has not been researched in the literature.

Details

Smart and Resilient Transportation, vol. 6 no. 1
Type: Research Article
ISSN: 2632-0487

Keywords

Open Access
Article
Publication date: 14 December 2023

Huijuan Zhou, Rui Wang, Dongyang Weng, Ruoyu Wang and Yaoqin Qiao

The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making…

Abstract

Purpose

The interruption event will seriously affect the normal operation of urban rail transit lines,causing a large number of passengers to be stranded in the station and even making the train stranded in the interval between stations. This study aims to reduce the impact of interrupt events and improve service levels.

Design/methodology/approach

To address this issue, this paper considers the constraints of train operation safety, capacity and dynamic passenger flow demand. It proposes a method for adjusting small loops during interruption events and constructs a train operation adjustment model with the objective of minimizing the total passenger waiting time. This model enables the rapid development of train operation plans in interruption scenarios, coordinating train scheduling and line resources to minimize passenger travel time and mitigate the impact of interruptions. Regarding the proposed train operation adjustment model, an improved genetic algorithm (GA) is designed to solve it.

Findings

The model and algorithm are applied to a case study of interruption events on Beijing Subway Line 5. The results indicate that after solving the constructed model, the train departure intervals can be maintained between 1.5 min and 3 min. This ensures both the safety of train operations on the line and a good match with passengers’ travel demands, effectively reducing the total passenger waiting time and improving the service level of the urban rail transit system during interruptions. Compared to the GA algorithm, the algorithm proposed in this paper demonstrates faster convergence speed and better computational results.

Originality/value

This study explicitly outlines the adjustment method of using short-turn operation during operational interruptions, with train departure times and station stop times as decision variables. It takes into full consideration safety constraints on train operations, train capacity constraints and dynamic passenger demand. It has constructed a train schedule optimization model with the goal of minimizing the total waiting time for all passengers in the system.

Article
Publication date: 29 December 2023

Dara Sruthilaya, Aneetha Vilventhan and P.R.C. Gopal

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation…

Abstract

Purpose

The purpose of this paper is to identify and analyze the interdependence of project complexity factors (PCFs) in metro rail projects using the Decision-Making Trial and Evaluation Laboratory (DEMATEL). The study provides qualitative and quantitative analysis of project complexities factors and their relationships. The results of the study facilitate effective project planning, proactive risk management and informed decision-making by stakeholders.

Design/methodology/approach

This study employs a case-based method for identifying PCFs and a DEMATEL method for analyzing the interdependence of complexity factors in metro rail projects. Initially, PCFs were identified through an extensive literature review. To validate and refine these factors, semi-structured interviews were conducted with thirty experienced professionals, each having 5–20 years of experience in roles such as project management, engineering, and planning. Further, elevated and underground metro rail projects were purposefully selected as cases, for identifying the similarities and differences in PCFs. A questionnaire survey was conducted with various technical experts in metro rail projects. These experts rated the impact of PCFs on a five-point Likert scale, for the evaluation of the interdependence of PCFs. The DEMATEL technique was used to analyze the interdependencies of the PCFs.

Findings

Metro rail projects are influenced by project complexity, which significantly impacts their performance. The analysis reveals that “design problems with existing structures,” “change in design or construction” and “land acquisition” are the key factors contributing to project complexity.

Originality/value

The study of project complexity in metro rail projects is limited because most of the studies have studies on examining complexity in mega projects. The existing literature lacks adequate attention in identifying project complexity and its effects on metro rail project performance. This research aims to bridge this gap by examining project complexity and interdependencies in metro rail projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Abstract

Details

Communicating Climate
Type: Book
ISBN: 978-1-83753-643-6

1 – 10 of 65