Search results

1 – 10 of 55
Article
Publication date: 15 September 2023

George Harrison Coffie, Divine Tuinese Novieto and Jonas Ekow Yankah

This study aims to investigate stakeholders' perception of the most prevalent unethical practices in the Ghanaian construction industry.

Abstract

Purpose

This study aims to investigate stakeholders' perception of the most prevalent unethical practices in the Ghanaian construction industry.

Design/methodology/approach

Data used for this study came from a cross-sectional survey (questionnaire), which was administered to 273 stakeholders in the construction industry using convenience sampling technique. The data were analyzed using statistical software package SPSSv17 to determine the most prevalent unethical practices. The ranking factor was calculated based on relative importance index (RII) value.

Findings

The results of this study reveal that corruption was perceived by major stakeholders as the most prevalent unethical behavior (RII = 0.82) followed by bribery (RII = 0.79). Political interference and kickback came third (RII = 0.77) and fourth (RII = 0.74), respectively. However, the least prevalent unethical behaviors were extortion (RII = 0.56), workplace violence (RII = 0.57), alcohol abuse (RII = 0.59) and harassment (RII = 0.59). The findings suggest that when the various groupings were taken into consideration separately, the differences in their perceptions were obvious.

Research limitations/implications

Data for this study were collected from construction stakeholders in Ghana who were conveniently sampled. As a result, in reference to the sampling framework which focused on major stakeholders in only two regions of Ghana does not sufficiently ensure full generalization of the results.

Practical implications

The findings of the study provide significant information for construction organizations and practitioners regarding unethical practices, which are most prevalent in the Ghanaian construction industry. Construction organizations and practitioners seeking to mitigate the negative effect of unethical practices on their performance should focus on educating construction workers on how to avoid corrupt practices and report same to the authorities. Also, ethics training programs must be instituted for staff coupled with constant and random inspection and checking of ethical compliance, verbal promotion and praise for ethical conduct and in some cases increase in employees pay.

Originality/value

This paper is one of the first to have accessed the views of broader stakeholders, i.e. consultants, contractors, professionals, suppliers, regulators, clients and construction workers in the construction industry regarding the most prevalent unethical practices in the Ghanaian construction industry in one study. This study, therefore, enriches the current literature by providing additional dimension to the understanding of unethical practices in the Ghanaian construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2022

Mohammad Nafe Assafi, Md. Ikramul Hoque and Md. Mehrab Hossain

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims…

Abstract

Purpose

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims to investigate the major delay factors causing construction delays in public-funded, mixed and private-funded construction projects of Bangladesh. Also, it offers preventive suggestions from expert stakeholders to reduce the recurrence of delays.

Design/methodology/approach

At first, an extensive literature review was conducted to identify the thirty-seven major delay factors categorized under seven groups. A questionnaire was then developed for survey at ongoing construction projects at a different division of Bangladesh. Next, data from 110 respondents were collected, and the delay factors were ranked based on the Relative Importance Index (RII); lastly, probable solutions were suggested for top-ranked delay factors based on opinions from expert stakeholders in the construction sector of Bangladesh.

Findings

The overall RII ranking of the 37 delay factors showed “Construction mistakes and defective work,” “Contract modifications by the client” and “Adverse weather condition” as the top three factors causing the delay. For public-funded projects, “Construction mistakes and defective work” and “Slow decision making by a consultant” are the top delay factors. For mixed projects, “Slow decision making of the client” and “Construction mistakes and defective work ranked top, and for private-funded projects, “Financial problems and payment delay of the client” and “Adverse weather condition” ranked top. These nuances of ranking in individual project types ascertain that the causes of delay vary in terms of project features.

Practical implications

The outcome of this project will help identify the significant delay factors based on their severity of effectiveness associated with public-funded, mixed and private-funded projects in Bangladesh. The suggestions regarding preventing these delay factors obtained through the opinions of expert stakeholders can help reduce the effect of these delays in the context of Bangladesh and in countries where the similarity in construction environment prevails.

Originality/value

Previously, studies on construction delays in Bangladesh focused mainly on identifying the delays using qualitative analysis techniques. This study is based on a unique methodology of integrating quantitative research on delay factor identification and qualitative research on preventive measures following the opinions gathered from expert stakeholders in the construction sector.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2023

Iman Youssefi and Tolga Celik

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost…

Abstract

Purpose

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost overrun causes. Hence, this study aims at performing a comparative analysis to evaluate the efficiency of three different approaches for TRS calculation.

Design/methodology/approach

Thirty-eight unique causes of cost overrun in urban-related construction projects were identified and a survey was conducted among construction professionals in Iran. The TRS for each cost overrun cause is calculated using single-attribute (SA), double-attribute (DA), and multiple-attribute (MA) approaches, and eventually, causes were ranked. Furthermore, principal component analysis (PCA), logistic regression analysis (LRA), and K-means clustering are utilized to compare the differences in the generated TRS using different approaches.

Findings

The results revealed that the TRS generated through the MA approach demonstrated the highest efficiency in terms of generating correlation between causes and their identified latent constructs, prediction capability, and classification of the influential causes in the same group.

Originality/value

The originality of this study primarily stems from the adoption of statistical approaches in the evaluation of the recently introduced TRS calculation approach in comparison to traditional ones. Additionally, this study proposed a modified application of the relative importance index (RII) for risk prioritization. The results from this study are expected to fulfill the gap in previous literature toward exploring the most efficient TRS calculation approach for those researchers and practitioners who seek to utilize them as a measure to identify the influential cost overrun causes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 8 December 2023

Nahathai Boontae and Mongkol Ussavadilokrit

Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing…

Abstract

Purpose

Effective facility management (FM) can reduce environmental effects on buildings throughout their life cycle. This study aims to investigate the challenges in implementing building information modelling (BIM) for FM in government buildings in Thailand.

Design/methodology/approach

Eight government-building facility experts were interviewed using an in-depth interview method to identify FM challenges. The collected qualitative data were analysed via thematic analysis to ensure data saturation. The final questionnaire was designed with 45 FM problems, classified into management, technical and human resource problems, to collect quantitative data from 54 government FM officers. The data were used to prioritise the severity and frequency of the FM problems using the severity index (SI) and relative importance index (RII).

Findings

Management problems have the highest impact, with an average SI of 0.285, followed by human resource (average SI = 0.266) and technical (average SI = 0.264) problems.

Originality/value

This study identifies the government-building FM problems in Thailand that are critical to the development of a BIM execution plan (BEP) guideline. The findings can facilitate strategy development for government-building operations and management in line with the public procurement and supply administration of Thailand. These findings can serve as a guideline to inform the development of a BIM Roadmap for integration into the national digital roadmap and the Thailand 4.0 policy to mitigate construction-related environmental and climate issues.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 31 January 2023

Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, Norsuzailina Mohamed Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid and Noor Md. Sadiqul Hasan

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Abstract

Purpose

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Design/methodology/approach

This study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.

Findings

The factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.

Practical implications

The construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.

Originality/value

Though some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 23 April 2024

Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…

Abstract

Purpose

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.

Design/methodology/approach

To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance,  and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.

Findings

The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.

Originality/value

This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 April 2024

Sumant Sharma, Deepak Bajaj and Raghu Dharmapuri Tirumala

Land value in urban areas in India is influenced by regulations, bylaws and the amenities associated with them. Planning interventions play a significant role in enhancing the…

Abstract

Purpose

Land value in urban areas in India is influenced by regulations, bylaws and the amenities associated with them. Planning interventions play a significant role in enhancing the quality of the neighbourhood, thereby resulting in a change in its value. Land is a distinct commodity due to its fixed location, and planning interventions are also specific to certain locations. Consequently, the factors influencing land value will vary across different areas. While recent literature has explored some determinants of land value individually, conducting a comprehensive study specific to each location would be more beneficial for making informed policy decisions. Therefore, this article aims to examine and identify the critical factors that impact the value of residential land in the National Capital Territory of Delhi, India.

Design/methodology/approach

The study employed a combination of semi-structured and structured interview methods to construct a Relative Importance Index (RII) and ascertain the critical determinants affecting residential land value. A sample of 36 experts, comprising property valuers, urban planners and real estate professionals operating within the National Capital Territory of Delhi, India, were selected using snowball sampling techniques. Subsequently, rank correlation and ANOVA methods were employed to evaluate the obtained results.

Findings

Location and stage of urban development are the most critical determinants in determining residential land values in the National Capital Territory of Delhi, India. The study identifies a total of 13 critical determinants.

Practical implications

A scenario planning approach can be developed to achieve an equitable distribution of values and land use entropy. A land value assessment model can also be developed to assist professional valuers.

Originality/value

There has been a lack of emphasis on assessing the impact of planning interventions and territorial regulation on land values in the context of Delhi. This study will contribute to policy decision-making by developing a rank list of planning-based determinants of land value.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 15 February 2024

D.S.N. Senarathna, K.G.A.S. Waidyasekara and S.S.C.G. Vidana

The Heating, Ventilation and Air Conditioning (HVAC) system is a significant energy consumer in built environments, and the building energy consumption could be minimised by…

Abstract

Purpose

The Heating, Ventilation and Air Conditioning (HVAC) system is a significant energy consumer in built environments, and the building energy consumption could be minimised by optimising HVAC controls. Hence, this paper aims to investigate the applicability of Variable Refrigerant Flow (VRF) air conditioning systems for optimising the indoor comfort of buildings in Sri Lanka.

Design/methodology/approach

To address the research aim, the quantitative approach following the survey research strategy was deployed. Data collected through questionnaires were analysed using descriptive statistical tools, including Mean Rating (MR), Relative Important Index (RII) and Standard Deviation (SD).

Findings

The findings revealed that VRF systems are popularly used in Sri Lankan apartment buildings. Furthermore, energy efficiency and comfort were recognised as the most significant top-ranked benefits, while ventilation issues and initial cost were recognised as significant challenges. Moreover, the allocation of trained technicians and provision of proper ventilation through a Dedicated Outdoor Air System (DOAS) were highlighted as applicable mitigation strategies for the identified challenges in VRFs.

Practical implications

The study recommends VRF systems as a suitable technology to ensure energy efficiency, reduce GHG emissions and achieve climate performance within the built environment. The opportunities for adopting VRF systems for developing countries could be explored based on the research findings. The identified challenges would assist the design engineers and facilities professionals to devise suitable strategies to mitigate issues of VRF systems in developing countries.

Originality/value

This research provides empirical proof of the energy efficiency and comfort aspects of VRFs. The study has explored and recommended VRF technology as a beneficial application to overcome the persistent energy crisis in developing countries.

Details

Property Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-7472

Keywords

1 – 10 of 55