Search results

1 – 10 of 148
Article
Publication date: 4 October 2021

Adeel Akmal, Nataliya Podgorodnichenko, Richard Greatbanks, Jeff Foote, Tim Stokes and Robin Gauld

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims…

Abstract

Purpose

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims to present a concerted attempt to create a quality improvement maturity model (QIMM) derived from holistic principles underlying the successful implementation of system-wide QI programmes.

Design/methodology/approach

A hybrid methodology involving a systematic review (Phase 1) of over 270 empirical research articles and books developed the basis for the proposed QIMM. It was followed by expert interviews to refine the core constructs and ground the proposed QIMM in contemporary QI practice (Phase 2). The experts included academics in two academic conferences and 59 QI managers from the New Zealand health-care system. In-depth interviews were conducted with QI managers to ascertain their views on the QIMM and its applicability in their respective health organisations (HOs).

Findings

The QIMM consists of four dimensions of organisational maturity, namely, strategic, process, supply chain and philosophical maturity. These dimensions progress through six stages, namely, identification, ad-hoc, formal, process-driven, optimised enterprise and finally a way of life. The application of the QIMM by the QI managers revealed that the scope of QI and the breadth of the principles adopted by the QI managers and their HOs in New Zealand is limited.

Practical implications

The importance of QI in health systems cannot be overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality.

Originality/value

This paper contributes new knowledge by presenting a maturity model with an integrated set of quality principles for HOs and their extended supply networks.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 16 August 2022

Khadija Echefaj, Abdelkabir Charkaoui, Anass Cherrafi, Anil Kumar and Sunil Luthra

The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study…

Abstract

Purpose

The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study ranks maturity factors that influence the main capabilities identified.

Design/methodology/approach

This paper is conducted in three stages. First, capabilities and practices are extracted through a literature review. Second, capabilities and practices are ranked using the analytical hierarchical process method. Third, a gray technique for order preference by similarity to ideal solution method is used to rank maturity factors influencing capabilities.

Findings

The findings indicate that responsiveness, readiness, flexibility and adaptability are the most important capabilities for supply chain resilience. Also, commitment and communication are the highest maturity factors influencing resilience capabilities.

Research limitations/implications

The findings provide a hierarchical vision of capabilities and practices for industries to increase resilience. Limitations of the paper are related to capabilities, practices and number of experts consulted.

Practical implications

This paper highlights the importance of high-maturity practices in resilience capability adoption. The findings of this study will encourage decisions-makers to increase maturity practices to build resilience against disruption.

Originality/value

The paper reveals that developing powerful capabilities, good practices and a high level of maturity improve supply chain resilience.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 22 April 2024

Arash Arianpoor and Ahmad Abdollahi

The purpose of this study is to propose a framework for the convergence of maturity model and education and evaluation in accounting.

Abstract

Purpose

The purpose of this study is to propose a framework for the convergence of maturity model and education and evaluation in accounting.

Design/methodology/approach

The present research was conducted in two phases. In the first phase, to determine the indicators of convergence of the maturity model and education and evaluation in accounting, a Meta-Synthesis method was used. The conceptual model includes two dimensions of “Teaching and learning processes” and “Evaluation methods"; five levels of initial, repeatable, defined, managed and optimized; and a total number of 35 indicators. In the second phase, a questionnaire was developed, and academics as accounting faculty members in Iranian public universities were employed to fill out the questionnaire electronically and present a final framework. Having received the questionnaires, 66 questionnaires were analyzed statistically.

Findings

The results showed that the two dimensions of “Teaching and learning processes” and “Evaluation methods” considering initial, repeatable, defined, managed and optimized levels include 35 indicators, which form a framework for the convergence of maturity model and education and evaluation in accounting. The results show that both dimensions have positive and significant regression path coefficients in the convergence model. Moreover, the dimension of teaching and learning processes has the highest regression path coefficient indicating a greater impact on the convergence model. Besides, all five levels have positive and significant regression path coefficients with dimensions. Finally, in this study, all indicators were prioritized according to five levels.

Originality/value

Due to the success of maturity models and the urgent developments that require transformative improvements in accounting education, maturity models can respond to the challenges associated with education and learning in accounting. Thus, conceiving an image of the convergence of maturity model, education and evaluation in accounting seems imperative which has been scarcely investigated previously.

Details

Accounting Research Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1030-9616

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 April 2024

Danar Agus Susanto, Mokhamad Suef, Putu Dana Karningsih and Bambang Prasetya

This study’s main objective is to explore the ISO 9001 implementation model and identify a future research agenda. This is important because not all organizations find it easy to…

Abstract

Purpose

This study’s main objective is to explore the ISO 9001 implementation model and identify a future research agenda. This is important because not all organizations find it easy to implement ISO 9001, and not all organizations get positive benefits after implementing it.

Design/methodology/approach

The paper presents a comprehensive review of the literature on ISO 9001 implementation models using the preferred reporting items for systematic reviews (PRISMA) methodology to systematically review the existing literature on ISO 9001 implementation models. Relevant studies published from 2003 to early 2023 are explored to reveal the research landscape, gaps and trends.

Findings

Many ISO 9001 implementation methods have been developed for actual implementation in organizations, including models, frameworks, special variable considerations, application uses and integration. These methods were developed and applied to cover gaps regarding constraints, unbeneficial, special conditions, implementation objectives and organization types in ISO 9001 implementation. Current issues and future research on ISO 9001 implementation models were found, namely ISO 9001 implementation models specific to SMEs, ISO 9001 implementation levels, ISO 9001 implementation models that are agile to change, and affordable certification models.

Originality/value

Only a few researchers have systematically reviewed the literature or taken a bibliometric approach in their analyses to provide an overview of the current trends and links to ISO 9001 implementation models. The ISO 9001 standard is a general standard and can be applied by all organizations with the implementation method left to the implementer. Many implementation methods have been developed, but several implementation obstacles and disadvantages are still found. It is important to know the extent of current research and discover future research gaps regarding methods of implementing the ISO 9001 standard.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1610

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 May 2022

Lucas B. Nhelekwa, Joshua Z. Mollel and Ismail W.R. Taifa

Industry 4.0 has an inimitable potential to create competitive advantages for the apparel industry by enhancing productivity, production, profitability, efficiency and…

Abstract

Purpose

Industry 4.0 has an inimitable potential to create competitive advantages for the apparel industry by enhancing productivity, production, profitability, efficiency and effectiveness. This study, thus, aims to assess the digitalisation level of the Tanzanian apparel industry through the Industry 4.0 perspectives.

Design/methodology/approach

A mixed-methods-based approach was deployed. This study deployed semi-structured interviews, document review and observation methods for the qualitative approach. For the quantitative approach, closed-ended questionnaires were used to ascertain the digitalisation levels and maturity level of the textiles and apparel (T&A) factories and small and medium-sized textile enterprises in Tanzania. The sample size was 110, with participants engaged through the purposive sampling technique.

Findings

Industry 4.0 frameworks evolved into practices mainly since 2011 in several service and manufacturing industries globally. For Tanzania, the findings indicate that the overall maturity level of the T&A industries is 2.5 out of 5.0, demonstrating a medium level of adoption. Thus, the apparel industries are not operating under the industry 4.0 framework; they are operating within the third industrial revolution – Industry 3.0 – framework. For such industries to operate within the fourth industrial revolution – Industry 4.0 – that is only possible if there is significantly well-developed industrial infrastructure, availability of engineering talent, stable commercial partnerships, demand from the marketplace and transactional relationship with customers.

Research limitations/implications

This study’s limitations include: firstly, Industry 4.0 is an emerging area; this resulted in limited theoretical underpinnings in the Tanzanian perspectives. Secondly, the studied industries may not suffice the need to generalise the findings for the entire country, thus needing another study.

Originality/value

Although Industry 4.0 conceptual frameworks have been on trial in several industries since 2011, this is amongst the first empirical research on Industry 4.0 in the Tanzanian apparel industry that assesses the digitalisation levels.

Details

Research Journal of Textile and Apparel, vol. 28 no. 2
Type: Research Article
ISSN: 1560-6074

Keywords

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

4934

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of 148