Search results
1 – 10 of 214Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…
Abstract
Purpose
Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.
Design/methodology/approach
A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.
Findings
The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.
Originality/value
To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.
Details
Keywords
Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards
Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research…
Abstract
Purpose
Demand for private investment in infrastructure, notably in the power sector remains high, and this is anticipated to expand with the passage of time. Very little research currently exists on the power sector and specifically the private sector influencing factors (PSIFs) for entering into public–private partnerships (PPPs). The purpose of this study is to explore influencing factors for private sector participation in PPP power projects in Ghana.
Design/methodology/approach
Using purposive and snowball sampling techniques, questionnaires were used to gather responses from experts in the PPP power sector domain in a two-round Delphi survey. Reliability analysis was conducted using Cronbach’s alpha coefficient and level of agreement tested using Kendall’s concordance. Mean score ranking, analysis of variance (ANOVA) and Chi-square test were the main analysis conducted on the influencing factors.
Findings
The most significant PSIFs were: obtaining of investment support; improvement in private sector’s international image; synergy with public sector; sharing of risks; and gaining of profits. From ANOVA results, all the influencing factors had no significant different perception between the number of years in PPP practice and the motivations for the private sector entering into PPP power projects. Using Chi-square, the association between the variables indicated they were statistically significant.
Practical implications
The findings in this study are significant for multinational power generation firms that seek to enter the Ghanaian energy sector to help fill the generation gap and deficit.
Originality/value
The output of this research contributes to the checklist of influencing factors for private sector participation in PPP power projects and enhances the development of PPP practice.
Details
Keywords
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors…
Abstract
Purpose
This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors emanating from project attributes that can influence these rates.
Design/methodology/approach
This paper analyzes feasibility studies of 37 PPP projects across different sectors. The studies were carefully selected based on relevance, completeness and validity of data. The analysis uses statistical techniques, including Levene’s tests, t-tests, ANOVA tests, Cohen’s effect size and Pearson correlations, to explore differences in cost of capital and excess returns across various attributes.
Findings
Based on the statistical analysis, no significant difference exists between the excess return of 200 basis points (bps) and the equity excess return of 0 bps. This suggests that the eligibility criteria for PPP projects require an internal rate of return (IRR) equal to the weighted average cost of capital plus 200 bps or an equity IRR equal to the cost of equity. The variations in the tested variables among diverse project attributes do not exhibit statistically significant disparities, even though specific attributes display moderate to high effect sizes.
Originality/value
This paper represents one of the first attempts to examine the rates of return demanded by the private sector in the context of Indonesian PPP projects. It comprehensively explores the factors that influence these rates, drawing on insights derived from feasibility studies.
Details
Keywords
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
This paper aims to discuss the capability of current governance models to achieve the sustainable development goals (SDGs) in the tourism sphere and propose a broad model of…
Abstract
Purpose
This paper aims to discuss the capability of current governance models to achieve the sustainable development goals (SDGs) in the tourism sphere and propose a broad model of governance to support the SDGs agenda.
Design/methodology/approach
The paper reviews the existing literature and uses it as a basis for developing a model of governance. The proposed model is inspired by recent studies that discuss the implementation of the SDGs agenda in tourism and on Fennell’s (2019) framework for tourism ethics.
Findings
The study proposes a multi-level model of governance that espouses the need for a stronger supranational system that curtails the power of both governments and the private sector. It also emphasizes the need to identify hypernorms that delimit the capacity for action at the various levels and which are determined by accessing varied stakeholders’ views within this system at the international level.
Originality/value
This paper proposes a model of governance for the implementation of the SDGs as a foothold for future discussions. It highlights the main challenges that may be faced in the implementation of such a system and suggests several avenues for future research.
Details
Keywords
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala
Sampa Chisumbe, Clinton Ohis Aigbavboa, Erastus Mwanaumo and Wellington Didibhuku Thwala