Search results

1 – 10 of 130
Article
Publication date: 29 September 2023

Mushtaq Ahmad Shah, Sanjeev Kumar, Mohd Asif Shah and Adil Rasool

The sustainable development goal (SDG 17) is to strengthen the means of implementation and revitalise the global partnership for sustainable development. Partnership is a key…

Abstract

Purpose

The sustainable development goal (SDG 17) is to strengthen the means of implementation and revitalise the global partnership for sustainable development. Partnership is a key strategy for acquiring skills, information and private finance for developing critical infrastructure projects. Existing studies have mostly concentrated on identifying critical success factors (CSFs) for successfully delivering public–private partnerships (PPPs) projects, but the interrelationships among CSFs expected from stakeholders have garnered less attention. The purpose of this study is to examine the interconnections among CSFs of PPP projects while keeping the public in mind, as well as the influencing routes that contribute to success in the PPP implementation process.

Design/methodology/approach

The study uses a mixed-method approach that involves both quantitative and qualitative methods of data collection. The data for the study were collected through a well-structured questionnaire from the respondents who are directly or indirectly associated with the PPP project implementation process. The CSF’s framework was built using a literature study and expert interviews; nine hypotheses were developed and evaluated using structural equation modelling. Random and purposive sampling techniques were used for the respondents who were directly or indirectly associated with the PPP project implementation process.

Findings

The findings of this study reveal that the relationship between public and private partners is more adherent than collaborative, with unequal responsibilities, powers and resources distributed among the parties involved. The relevance of state rules, the PPP directive and policies in PPP implementation is supported by the positive connection between favourable environments (Fav_Env) and government attributes (Gov_Atr; the path coefficient is 0.405). Moreover, government attributes have a favourable influence on private company attributes (Pvt_Atr; the path coefficient is 0.198), showing that the state plays a substantial role in the private sector’s decision-making process in PPP. The long-term sustainability and success of a PPP project are dependent on the established interrelationships between CSFs.

Practical implications

The established interrelationships between CSFs will contribute to the long-term viability and success of a PPP project. Since PPP is still in its infancy in India, the study of CSFs in PPPs and their interrelationships will help policymakers and other stakeholders better understand the major individual factors impacting the success or failure of PPP initiatives.

Originality/value

Because PPP is still in its infancy in India, the study of CSFs in PPPs and their interrelationships will help policymakers and other stakeholders to better understand the major individual factors impacting the success or failure of PPP initiatives. A key implication of the study borders on providing a better understanding of the relationships between CSFs and public engagement. This is also critical for the long-term viability of PPPs and the enhancement of public service quality.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 27 April 2023

Khalid Almarri and Halim Boussabaine

Scaling up smart city infrastructure projects will require a large financial investment. Using public–private partnerships is one of the most effective ways to address budget…

Abstract

Purpose

Scaling up smart city infrastructure projects will require a large financial investment. Using public–private partnerships is one of the most effective ways to address budget constraints. Numerous factors have varying degrees of influence on the performance of Public private partnerships (PPP) projects; certain PPP factors are more crucial to the success of a smart city infrastructure project than others, and their influence can be greatly increased when they are fulfilled collectively. This study aims to find out what factors are unique to smart city PPP initiatives, as well as how these factors work together, so that successful smart city infrastructure PPP projects can be scaled up.

Design/methodology/approach

The methodology included three sequential stages: identifying the critical success factors (CSF) of PPP for smart cities based on an extensive literature review, collecting data from a sample of 90 PPP practitioners using a Likert scale questionnaire and estimating interrelationships among the CSF and their emergent clusters using structural equation modelling.

Findings

The best fit model developed in this study demonstrated the significance of each factor and their interrelationships within their categories in enhancing the performance of PPPs in smart city infrastructure projects. Five categories of critical success factors for PPPs in smart city infrastructure projects have been established: partnership and collaboration; financial sustainability; contractual duties and outsourcing; smart integration; and contract governance.

Practical implications

The proposed model represented the causal interrelationships among relevant critical success factors derived from literature, which may help in directing the organization’s attention and resources to more critical areas, leading to the effective fulfilment of the smart city infrastructure project’s objectives. In addition to the theoretical and methodological contributions, this study produced a usable and readily adaptable list and clusters of critical success factors for research in the area of the implementation of PPP in smart city infrastructure projects.

Originality/value

To the best of the authors’ knowledge, this is the first study to identify PPP critical success factors and their themed clusters for smart city infrastructure projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 July 2023

Ephraim Zulu, Josephine Mutwale, Sambo Lyson Zulu, Innocent Musonda, Neema Kavishe and Cletus Moobela

Governments in developing countries seeking to meet their infrastructure backlog are increasingly turning to public–private partnerships (PPP) due to a lack of public funds…

Abstract

Purpose

Governments in developing countries seeking to meet their infrastructure backlog are increasingly turning to public–private partnerships (PPP) due to a lack of public funds. However, while there are factors which drive the current uptake of projects, there are challenges with attracting private finance, and it is not clear what incentives can be used to attract more private participation, especially in sub-Saharan Africa (SSA). Therefore, this study aims to examine challenges, drivers and incentives that affect private participation in PPP projects in Zambia.

Design/methodology/approach

The study used a qualitative approach with semi-structured interviews with participants who had first-hand experience working on the administration of PPP projects. The participants were predominantly from the public sector, and so the results are largely a public sector perspective on the matter.

Findings

The findings show that bureaucracy and a poor business environment emanating from poor policies, long procedures and a poor economic environment are the main challenges affecting PPP projects. The current demand for the projects is being driven by a stable business and economic environment while incentives include enhancing the business environment by improving procedures and policies.

Originality/value

The study contributes to extant literature by proposing an overarching theory about the challenges affecting the implementation of PPP projects in Zambia, in particular, and in SSA, in general. The results show areas where governments and government agencies responsible for PPP projects can focus attention to promote private participation.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 December 2023

Zehui Bu, Jicai Liu and Jiaqi Liu

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of…

Abstract

Purpose

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of events, and causality analysis. Public–private partnership (PPP) projects represent a confluence of “economic–environmental–social” dimensions, wherein stakeholder behavior follows the sequential progression of “cognition–emotion–action.” Consequently, comprehending the effects of emotional shifts on stakeholder's decision-making processes is vital to fostering the sustainability of PPP projects.

Design/methodology/approach

The paper utilizes rank-dependent expected utility and evolutionary game theory to systematically examine the influence of emotional factors on stakeholders' behavior and decision-making processes within PPP projects. The paper integrates three emotional state functions—optimism, pessimism and rationality—into the PPP framework, highlighting the intricate interactions among the government, private sector, surrounding public and the media. Furthermore, the paper amalgamates the evolutionary pathways of environmental rights incidents with the media's role. Through equilibrium analysis and numerical simulation, the paper delves into the diverse interplay of emotions across different phases of the environmental rights incident, assessing the impact of these emotions on the evolutionary game's equilibrium results.

Findings

Emotions significantly influence the microlevel decisions of PPP stakeholders, adapting continually based on event dynamics and media influences. When the private sector demonstrates optimism and the surrounding public leans toward rationality or pessimism, the likelihood of the private sector engaging in speculative behavior escalates, while the surrounding public refrains from adopting a supervisory strategy. Conversely, when the private sector is pessimistic and the public is optimistic, the system fails to evolve a stable strategy. However, when government regulation intensifies, the private sector opts for a nonspeculative strategy, and the surrounding public adopts a supervisory strategy. Under these conditions, the system attains a relatively optimal state of equilibrium.

Originality/value

The paper develops a game model to examine the evolutionary dynamics between the surrounding public and private sectors concerning environmental rights protection in waste incineration PPP projects. It illuminates the nature of the conflicting interests among project participants, delves into the impact of emotional factors on their decision-making processes and offers crucial perspectives for the governance of such partnerships. Furthermore, this paper provides substantive recommendations for emotional oversight to enhance governance efficacy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 December 2022

De-Graft Owusu-Manu, Emmanuel Ofori-Yeboah, Edward Badu, Augustine Senanu Komla Kukah and David John Edwards

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Abstract

Purpose

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Design/methodology/approach

After undertaking a literature review, questionnaires were used to elicit responses from respondents. Population consisted of quantity surveyors, project managers, procurement officers, consultants, public agency officers involved in PPP projects, private partners and contractors. A total of 211 questionnaires were received from 250 distributed. Purposive and snowballing sampling techniques were adopted. Analytical tools were Cronbach’s alpha for testing reliability, regression, mean score ranking and relative importance index.

Findings

Reduced mutual trust and respect, poor clarity of project objectives; consequence on decision-making; less effective construction process; and increased construction risks were the significant effects of moral hazard on satisfaction of PPP construction projects. Value-based effects; manufacturer-based effects; product-based effects; user-based effects; and transcendent-based effects were the significant effects of moral hazard on quality of PPP construction projects.

Practical implications

Construction stakeholders involved in delivering PPP projects ought to take note of the findings and recommendations arising. Further studies should explore the effects on other project performance indicators apart from satisfaction and quality.

Originality/value

This paper extends knowledge in the area of exploring the effects of moral hazard on PPP project satisfaction and quality. The findings are beneficial to both academia and industry practitioners.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 12 May 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David John Edwards, Eric Asamoah, Andrew Anafo, Dominic Kuutiero and Richmond Makafui Kofi Kukah

In comparison to other countries, power generation in Sub-Sahara Africa is poor. Public–private partnership (PPP) model has become increasingly popular for addressing…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Sahara Africa is poor. Public–private partnership (PPP) model has become increasingly popular for addressing infrastructural challenges, especially in the power sector. The purpose of this study is to evaluate and classify the factors that influence public sector involvement in Ghanaian PPP power projects.

Design/methodology/approach

Using purposive and snowball sampling techniques, questionnaires were used to gather responses from experts in the PPP power sector in a two round Delphi survey. Analytical tools adopted were descriptive statistics, mean score ranking, Cronbach’s alpha and factor analysis.

Findings

The most significant factors that influence public sector involvement in PPP power projects were: achieving improved value for money; access to additional capital; increased certainty of projects; greater efficiency of project delivery services; and improved ability to deliver new infrastructure. From factor analysis, the four components were: value for money and efficiency; capital and skills; innovation and technology; and project delivery.

Originality/value

Government bodies in the power sector will benefit from the findings, as it would aid them develop policies that would strengthen regulatory structures as well as institutions.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 11 December 2023

Zehui Bu, Jicai Liu and Xiaoxue Zhang

The paper aims to elucidate effective strategies for promoting the adoption of green technology innovation within the private sector, thereby enhancing the value of public–private…

Abstract

Purpose

The paper aims to elucidate effective strategies for promoting the adoption of green technology innovation within the private sector, thereby enhancing the value of public–private partnership (PPP) projects during the operational phase.

Design/methodology/approach

Utilizing prospect theory, the paper considers the government and the public as external driving forces. It establishes a tripartite evolutionary game model composed of government regulators, the private sector and the public. The paper uses numerical simulations to explore the evolutionary stable equilibrium strategies and the determinants influencing each stakeholder.

Findings

The paper demonstrates that government intervention and public participation substantially promote green technology innovation within the private sector. Major influencing factors encompass the intensity of pollution taxation, governmental information disclosure and public attention. However, an optimal threshold exists for environmental publicity and innovation subsidies, as excessive levels might inhibit technological innovation. Furthermore, within government intervention strategies, compensating the public for their participation costs is essential to circumvent the public's “free-rider” tendencies and encourage active public collaboration in PPP project innovation.

Originality/value

By constructing a tripartite evolutionary game model, the paper comprehensively examines the roles of government intervention and public participation in promoting green technology innovation within the private sector, offering fresh perspectives and strategies for the operational phase of PPP projects.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 27 February 2024

Fabio De Matteis, Elio Borgonovi, Giovanni Notaristefano and Fabrizio Striani

Based on the theoretical background of stakeholder capitalism, the purpose of this paper is to contribute to the scientific debate on the topic of public–private partnerships…

Abstract

Purpose

Based on the theoretical background of stakeholder capitalism, the purpose of this paper is to contribute to the scientific debate on the topic of public–private partnerships (PPPs), considering in particular how this governance structure relates to the pursuit of sustainable development. Specifically, this objective will be pursued with a focus on stakeholder relations and governance aspects, to highlight enablers and barriers in change for sustainability.

Design/methodology/approach

The systematic literature review is applied starting with the use of keywords in Web of Science, which leads to the extrapolation of 629 articles on the topic of “PPP and sustainability”. Subsequently, through various skimming steps, 75 papers are sampled. A mixed (quantitative-qualitative) approach is then followed: a co-word semantic network to identify the pattern of discourse and a more in-depth and explanatory analysis of the papers. These quantitative and qualitative tools synergistically work together to evidence the main aspects related to the aim of the paper.

Findings

With reference to the governance structure and stakeholders of PPPs, the analyses highlight the shift towards a triadic type of relational governance that considers stakeholders (especially the community) in addition to public–private partners. This can improve the partnership's performance (particularly in sustainable development) and social legitimacy. With reference to the role of PPPs in the implementation of sustainable development, they have positive potential in terms of implementing sustainability and raising stakeholder awareness of it. Nevertheless, PPPs may entail risks to the implementation of sustainability. The findings lead to some concluding remarks on future research opportunities.

Research limitations/implications

The research leads to some managerial implications, such as the need to follow a competitive collaboration approach among stakeholders, to develop relational governance skills and related managerial tools and to incorporate sustainability aspects starting from the design of PPPs.

Originality/value

The originality aspect of this research is the consideration of a PPP by relating it to the pursuit of sustainability. Such an inter-organizational structure could be suitable to deal with the complexity inherent in the implementation of sustainability and is peculiar in terms of governance and stakeholder relations, considering that it is characterised by the presence of several partners of different nature (public and private).

Details

Corporate Governance: The International Journal of Business in Society, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-0701

Keywords

Article
Publication date: 28 March 2023

Lu Zhang, Lei Shi and Li Ma

A public–private partnership (PPP) is an agreement between the government and private investors to deliver long-term public services. The efficiency of PPP projects depends on PPP…

Abstract

Purpose

A public–private partnership (PPP) is an agreement between the government and private investors to deliver long-term public services. The efficiency of PPP projects depends on PPP contracts stipulating contractual parties' corresponding responsibilities and rights to deal with relational and performance risks. Although more complex contracts provide more remedies for mitigating ex-post transaction costs, they also result in the increased ex ante transaction costs associated with contract writing. Thus, contractual complexity is a design choice that can reduce the overall contract transaction costs.

Design/methodology/approach

Using 365 transportation PPP projects in China from 2010 to 2019, this study applies the Poisson regression model to examine the effects of payment mechanisms, ownership by investors and equity structure on contractual complexity.

Findings

PPP contracts have control and coordination functions with unique determinants. Parties in the government-pay mechanism are more likely to negotiate coordination provisions, which results in greater contractual complexity. PPP projects with state-owned enterprises (SOEs) have less contractual complexity in terms of both two functions of provisions, whereas the equity structure has no impact on contractual complexity.

Originality/value

These findings provide a nuanced understanding of how various contractual provisions are combined to perform control or coordination functions and make managerial recommendations to parties involved in PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 May 2023

Min Cheng, Lin Liu, Xiaotong Cheng and Li Tao

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects…

Abstract

Purpose

Many waste-to-energy (WTE) plants are constructed and operated using the public-private partnership (PPP) mode in China. However, risk events of PPP WTE incineration projects sometimes occur. This study aims to clarify the relationship of risks in China's PPP WTE incineration projects and identify the key risks accordingly and risk transmission paths.

Design/methodology/approach

A risk list of PPP WTE incineration projects was obtained based on literature analysis. Moreover, a hybrid approach combining fuzzy sets, decision-making trial and evaluation laboratory (DEMATEL) and interpretive structural modeling (ISM) was developed to analyze the causality of risks, explore critical risks and reveal the risk transmission paths. The quantitative analysis process was implemented in MATLAB.

Findings

The results show that government decision-making risk, government credit risk, government supervision behavior risk, legal and policy risk, revenue and cost risk and management capacity risk are the critical risks of PPP WTE incineration projects in China. These critical risks are at different levels in the risk hierarchy and often trigger other risks.

Originality/value

Currently, there is a lack of exploration on the interaction between the risks of PPP WTE incineration projects. This study fills this gap by examining the key risks and risk transfer pathways of PPP WTE incineration projects from the perspective of risk interactions. The findings can help the public and private sectors to systematically understand the risks in PPP WTE incineration projects, thus enabling them to identify the risks that need to be focused on when making decisions and to optimize risk prevention strategies. The proposed hybrid approach can offer methodological ideas for risk analysis of other types of PPP projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 130