Search results

1 – 2 of 2
Open Access
Article
Publication date: 3 January 2024

Abderahman Rejeb, Karim Rejeb, Andrea Appolloni and Stefan Seuring

The literature on public procurement (PP) has increased significantly in recent years, and, to date, several reviews have been conducted to study this relevant subject…

1752

Abstract

Purpose

The literature on public procurement (PP) has increased significantly in recent years, and, to date, several reviews have been conducted to study this relevant subject. Nevertheless, a bibliometric analysis of the PP knowledge domain is still missing. To fill this knowledge gap, a bibliometric review is carried out to investigate the current state of PP research.

Design/methodology/approach

A total of 640 journal articles are selected from the Scopus database for the final analysis. The performance indicators of the literature are identified and explained through bibliometric analysis. Furthermore, the conceptual and intellectual structures are studied through a keyword co-occurrence network and bibliographic coupling.

Findings

The results of the review indicate that PP research has increased significantly in recent years. The top ten most productive journals, countries, authors and academic institutions are identified. The findings from the keyword co-occurrence network reveal six main research themes including innovation, corruption and green public procurement (GPP). By applying bibliographic coupling, the focus of PP research revolves around seven thematic areas: GPP, corruption, the role of small and medium-sized enterprises (SMEs) in PP, electronic PP, innovation, labour standards and service acquisition. The research potential of each thematic area is evaluated using a model based on maturity and recent attention (RA).

Originality/value

To the best of the authors' knowledge, this is the first study to successfully organise, synthesise and quantitatively analyse the development of the PP domain amongst a large number of publications on a large time scale.

Details

International Journal of Public Sector Management, vol. 37 no. 2
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 12 October 2022

Limin Su, YongChao Cao, Huimin Li and Chengyi Zhang

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of…

Abstract

Purpose

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period.

Design/methodology/approach

In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable.

Findings

The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage.

Research limitations/implications

The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects.

Originality/value

The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Year

Last 3 months (2)

Content type

1 – 2 of 2