Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Abstract

Details

Supervising Doctoral Candidates
Type: Book
ISBN: 978-1-83797-051-3

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Mahmoud Ershadi and Fredelino Lijauco

In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and…

Abstract

Purpose

In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and synthesize factors in a framework. Thematic analysis subsequently revealed 18 selective codes under three groups of drivers, barriers, and outcomes. These three groups were explained by four key aspects including organization, stakeholders, infrastructure, and business environment that set a framework for the digitalization of construction. The study finally concluded digitalization strategies with a focus on support mechanisms, government incentives, regulations, the transition from manual labor to technicians, organizational technology culture, methodology development, and innovation processes. Such strategies provide insight into prioritizing resources towards smooth digital transformation in construction businesses.

Design/methodology/approach

A two-stage methodology is adopted by undertaking a systematic literature review followed by thematic content analysis. This work concludes with an analysis of remaining research gaps and suggestions for potential future research.

Findings

In this paper, a systematic review of 284 articles published between 2015 and 2022 and a full-text thematic analysis of 70 selected articles was conducted to catalog and synthesize variables in a framework. Thematic analysis subsequently revealed a set of variables and factors describing construction digitalization under three groups of success factors, barriers, and outcomes. A critical content analysis of the representative studies was conducted to identify five future research trends as well as associated research gaps and directions on the topic.

Practical implications

This study contributes to practice by providing directions concerning the key strategies and priorities associated with the digitalization of construction businesses.

Originality/value

This ground-breaking research brings to light a classified set of factors that are important for the digitalization of construction businesses. The elicited framework contributes to the current body of knowledge by offering a unique conceptualization of both driving and adverse aspects for the seamless digital transformation of construction.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 February 2024

Parsa Aghaei and Sara Bayramzadeh

This study aims to investigate how trauma team members perceive technological equipment and tools in the trauma room (TR) environment and to identify how the technological…

Abstract

Purpose

This study aims to investigate how trauma team members perceive technological equipment and tools in the trauma room (TR) environment and to identify how the technological equipment could be optimized in relation to the TR’s space.

Design/methodology/approach

A total of 21 focus group sessions were conducted with 69 trauma team members, all of whom worked in Level I TRs from six teaching hospitals in the USA.

Findings

The collected data was analyzed and categorized into three parent themes: imaging equipment, assistive devices and room features. The results of the study suggest that trauma team members place high importance on the availability and versatility of the technological equipment in the TR environment. Although CT scans are a usual procedure necessity in TRs, few facilities were optimized for easy access to CT-scanners for the TR. The implementation of cameras and screens was suggested as an improvement to accommodate situational awareness. Rapid sharing of data, such as imaging results, was highly sought after. Unorthodox approaches, such as the use of automatic doors, were associated with slowing down the course of actions.

Practical implications

This study provides health-care designers with the knowledge they need to make informed decisions when designing TRs. It will cover key considerations such as room layout, equipment selection, lighting and controls. Implementing the strategies will help minimize negative patient outcomes.

Originality/value

Level I TRs are a critical element of emergency departments and designing them correctly can significantly impact patient outcomes. However, designing a TR can be a complex process that requires careful consideration of various factors, including patient safety, workflow efficiency, equipment placement and infection control. This study suggests multiple considerations when designing TRs.

Details

Facilities , vol. 42 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 8 February 2024

Andreia C.B. Ferreira, Ricardo Gouveia Rodrigues, Ana R. Gouveia, Oliva M.D. Martins, Hugo Ferreira, João Alfredo Pereira and Paulo Duarte

The use of insects as food is a proposed solution for the increased demand for food worldwide, but it lacks acceptance because of restrictive emotional factors. This article aims…

Abstract

Purpose

The use of insects as food is a proposed solution for the increased demand for food worldwide, but it lacks acceptance because of restrictive emotional factors. This article aims to understand better customers' emotions’ role in considering and consuming insect-based food.

Design/methodology/approach

To assess their acceptance, an experiment was developed with 38 participants living in Portugal to identify how people feel when consuming processed insect bars compared to cereal bars (of equal flavour). A video was recorded “before”, “during” and “after” the consumption of such foods, and the triggered emotions and affective states were identified using the Facial Action Coding System (FACS) and the circumplex model of affect, respectively. After consumption, the Self-Assessment Manikin (SAM) was asked to be completed.

Findings

It was observed that the valence and arousal of the emotions and affective states triggered during consumption were higher in the insect bar than in the cereal bar. Its consumption resulted in surprise and a positive evaluation. Processed insect-based foods may result in a potentially increased acceptance of this new food alternative in the market.

Originality/value

Prior studies briefly identified disgust as a primary emotion activated by insect-based food. The current research deeply studied emotional responses to insect-based processed foods in the Western world using the dimensional emotional models. This study offers arguments for the insect-based food industry to invest in processed food justified by its potential for acceptance. In addition, it motivates further research focused on other insect-based products (e.g. non-processed ones).

Article
Publication date: 21 March 2024

Thamaraiselvan Natarajan, P. Pragha, Krantiraditya Dhalmahapatra and Deepak Ramanan Veera Raghavan

The metaverse, which is now revolutionizing how brands strategize their business needs, necessitates understanding individual opinions. Sentiment analysis deciphers emotions and…

Abstract

Purpose

The metaverse, which is now revolutionizing how brands strategize their business needs, necessitates understanding individual opinions. Sentiment analysis deciphers emotions and uncovers a deeper understanding of user opinions and trends within this digital realm. Further, sentiments signify the underlying factor that triggers one’s intent to use technology like the metaverse. Positive sentiments often correlate with positive user experiences, while negative sentiments may signify issues or frustrations. Brands may consider these sentiments and implement them on their metaverse platforms for a seamless user experience.

Design/methodology/approach

The current study adopts machine learning sentiment analysis techniques using Support Vector Machine, Doc2Vec, RNN, and CNN to explore the sentiment of individuals toward metaverse in a user-generated context. The topics were discovered using the topic modeling method, and sentiment analysis was performed subsequently.

Findings

The results revealed that the users had a positive notion about the experience and orientation of the metaverse while having a negative attitude towards the economy, data, and cyber security. The accuracy of each model has been analyzed, and it has been concluded that CNN provides better accuracy on an average of 89% compared to the other models.

Research limitations/implications

Analyzing sentiment can reveal how the general public perceives the metaverse. Positive sentiment may suggest enthusiasm and readiness for adoption, while negative sentiment might indicate skepticism or concerns. Given the positive user notions about the metaverse’s experience and orientation, developers should continue to focus on creating innovative and immersive virtual environments. At the same time, users' concerns about data, cybersecurity and the economy are critical. The negative attitude toward the metaverse’s economy suggests a need for innovation in economic models within the metaverse. Also, developers and platform operators should prioritize robust data security measures. Implementing strong encryption and two-factor authentication and educating users about cybersecurity best practices can address these concerns and enhance user trust.

Social implications

In terms of societal dynamics, the metaverse could revolutionize communication and relationships by altering traditional notions of proximity and the presence of its users. Further, virtual economies might emerge, with virtual assets having real-world value, presenting both opportunities and challenges for industries and regulators.

Originality/value

The current study contributes to research as it is the first of its kind to explore the sentiments of individuals toward the metaverse using deep learning techniques and evaluate the accuracy of these models.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords