Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

89

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 February 2024

Joachim Preusse

The purpose of this case report is to (1) to describe outputs of a change project at Muenster University of Applied Sciences (Germany), which targeted its “operational core” of…

Abstract

Purpose

The purpose of this case report is to (1) to describe outputs of a change project at Muenster University of Applied Sciences (Germany), which targeted its “operational core” of professors and (2) on this basis to derive ideas on how to ensure a high level of pervasion of change projects in the higher education sector.

Design/methodology/approach

The author compiled data on the extent to which the project has penetrated the organisation derived from the project documentation, discusses satisfaction with the level of pervasion and presents four approaches to increase the level of organisational pervasion for similar projects. These were developed in introspective observations by the project team during project execution (2011–2021).

Findings

The level of pervasion achieved by the project was judged to be satisfactory overall, but in principle still capable of being increased, as there are clear differences between subject disciplines. Four approaches to increase the level of pervasion are derived: (1) explicit attention to and monitoring of informal structures, (2) use of milieu-specific segmentation techniques of target groups, (3) variations of the way change objectives are presented within the organisation and (4) a dynamisation of stakeholder management.

Practical implications

The paper offers guidance to change managers in higher education institutions on how to improve the planning phase of change projects. It is essential for change projects to achieve their intended outcome (project outcome) that the organisation is sufficiently pervaded in quantitative terms (project outputs). The recommendations presented in this paper should be of interest to all higher education staff involved in change management, as they can help to increase the level of organisational pervasion.

Originality/value

Although Higher Education Institutions (HEIs) are considered to be a type of organisation that is difficult to change, change projects are an integral part of their management practice, follow one another at an increasing pace and are often being driven forward in a network of several parallel projects. This paper presents recommendations to increase the success of change projects in HEIs. In summary, the recommendations suggest breaking down organisation-wide change projects to the organisational meso level.

Details

International Journal of Educational Management, vol. 38 no. 2
Type: Research Article
ISSN: 0951-354X

Keywords

Article
Publication date: 22 November 2023

Lincoln Sposito, Isabel Cristina Scafuto, Fernando Ribeiro Serra and Manuel Portugal Ferreira

The authors investigated how emotional intelligence (EI) affects the relationship between project managers' (PMgs) expertise and experience and project success for both the team…

Abstract

Purpose

The authors investigated how emotional intelligence (EI) affects the relationship between project managers' (PMgs) expertise and experience and project success for both the team and client.

Design/methodology/approach

This study collected 290 valid responses from IT project managers. The results were analyzed using an ordinary least squares (OLS) regression, with Process v4.0 procedure and the Johnson-Neyman (JN) technique to assess the moderating effect of the level of EI.

Findings

Results showed that moderate levels of EI can enhance the impact of PMgs' experience on the project client, while higher levels of EI are necessary to positively impact the team. Moderate levels of EI can improve PMgs' expertise impact on the project team, increasing their effectiveness in interactions with clients and other stakeholders.

Practical implications

It is recommended to consider emotional intelligence alongside technical skills when selecting project managers to address emotional labor, stress, stakeholder management and agility. Providing EI training and experiential learning opportunities internally can improve project managers' emotional intelligence.

Originality/value

This study contributes to the literature on emotional intelligence and project management, highlighting the relationship between technical skills and emotional intelligence levels of PMgs. This research emphasizes the significance of experience and EI in project management, particularly in overseeing complex projects. Additionally, moderate levels of EI enhance PMgs' effectiveness in engaging with stakeholders closely involved in projects.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 4 July 2023

Stephanie Halbrügge, Paula Heess, Paul Schott and Martin Weibelzahl

The purpose of this paper is to examine how active consumers, i.e. consumers that can inter-temporally shift their load, can influence electricity prices. As demonstrated in this…

Abstract

Purpose

The purpose of this paper is to examine how active consumers, i.e. consumers that can inter-temporally shift their load, can influence electricity prices. As demonstrated in this paper, inter-temporal load shifting can induce negative electricity prices, a recurring phenomenon on power exchanges.

Design/methodology/approach

The paper presents a novel electricity-market model assuming a nodal-pricing, energy-only spot market with active consumers. This study formulates an economic equilibrium problem as a linear program and uses an established six-node case study to compare equilibrium prices of a model with inflexible demand to a model with flexible demand of active consumers.

Findings

This study illustrates that temporal coupling of hourly market clearing through load shifting of active consumers can cause negative electricity prices that are not observed in a model with ceteris paribus inflexible demand. In such situations, where compared to the case of inflexible demand more flexibility is available in the system, negative electricity prices signal lower total system costs. These negative prices result from the use of demand flexibility, which, however, cannot be fully exploited due to limited transmission capacities, respectively, loop-flow restrictions.

Originality/value

Literature indicates that negative electricity prices result from lacking flexibility. The results illustrate that active consumers and their additional flexibility can lead to negative electricity prices in temporally coupled markets, which in general contributes to increased system efficiency as well as increased use of renewable energy sources. These findings extend existing research in both the area of energy flexibility and causes for negative electricity prices. Therefore, policymakers should be aware of such (temporal coupling) effects and, e.g. continue to allow negative electricity prices in the future that can serve as investment signals for active consumers.

Details

International Journal of Energy Sector Management, vol. 18 no. 3
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Abstract

Details

Supervising Doctoral Candidates
Type: Book
ISBN: 978-1-83797-051-3

Article
Publication date: 9 January 2024

Benjamin Boahene Akomah and Prasanna Venkatesan Ramani

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis…

Abstract

Purpose

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis (CFA) model.

Design/methodology/approach

The study adopted a deductive research approach and started by identifying the positive factors that influence construction project performance. This was followed by the modification of the identified factors. After that, a questionnaire was developed out of the factors for data collection. Exploratory factor analysis was used to establish the factor structure of the positive factors, and this was verified using CFA afterwards. A model fit analysis was performed to determine the goodness of fit of the hypothesised model, followed by the development of the confirmatory model.

Findings

The study demonstrated substantial correlation in the data, sufficient unidimensionality and internal reliability. In addition, the estimated fit indices suggested that the postulated model adequately described the sample data.

Practical implications

The paper revealed that performance can be enhanced if stakeholders identify and leverage the positive factors influencing performance. The paper suggests that project stakeholders, particularly government, project owners, consultants and construction firms, can improve project performance by critically examining economic and financial systems (EFS), regulation and policy-making systems (RPS), effective management practices (EMP) and project implementation strategies (PIS).

Originality/value

The contribution of this paper to the present literature is identifying the positive factors and developing the confirmatory factor model. The model comprised 42 positive variables under four indicators: EMP, RPS, PIS and EFS.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 October 2022

Limin Su, YongChao Cao, Huimin Li and Chengyi Zhang

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of…

Abstract

Purpose

The optimal payment in the whole operation and maintenance period of water environment treatment PPP projects has become the main approach to realize sustainable development of projects. This study is aimed at constructing an effective payment model for the whole life period of projects to achieve win-win among all stakeholders, so as to provide a theoretical reference and managerial implications for the public sector in the whole operation and maintenance period.

Design/methodology/approach

In the whole operation and maintenance period of water environment treatment PPP projects, this article investigates how the public sector optimizes the payment in the whole operation and maintenance period of projects. Firstly, the projects' whole operation and maintenance period is divided into several stages according to the performance appraisal period. And then, the multi-stage dynamic programming model is constructed to design the payment construct model for the public sector in each performance appraisal stage. The payment from the public sector is the decision variable, and the deduction from the private sector is a random variable.

Findings

The optimal payment model showed that the relatively less objective weight of public sector leaded to its relatively more total payment and vice versa. Therefore, the sustainable development of the projects can only be ensured when the objective weights both of them should be balanced. Additionally, the deduction from the performance appraisal of private sector plays an important role in the model construction. The larger deduction the private sector undertakes, the smaller profits private sector has. Since the deduction at each stage is a random variable, the deduction varies with the different probability distributions obeyed by the practical deduction in each stage.

Research limitations/implications

The findings from this study have provided theoretical and application references, and some managerial implications are also given. First, the improvement of the pricing system of public sector should be accelerated. Second, the reasonable profit of the private sector must be guaranteed. While pursuing the maximization of social benefits, the public sector should make full use of the price sharing mechanism in the market and supervise the real income situation of the private sector. Third is increasing the public to participate in pricing. Additionally, it is a limitation that the deduction is assumed to conform to a uniform distribution in this study. Other probability distributions on deduction can be essentially further sought, so as to be more line with the actual situation of the projects.

Originality/value

The optimal payment in whole operation and maintenance period of the projects has become an important issue, which is a key to project success. This study constructs a multi-stage dynamic programming model to optimize payment in the whole period of projects. Additionally, this study adds its value through deeply developing the new theories of optimal payment to more suitable for the practical problems, so that to optimize the design of payment mechanism. Meanwhile, a valuable reference for public and private sectors is provided to ensure the sustainable development of the projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988