Article
Publication date: 8 June 2023

Lamiae Benhayoun, Marie-Anne Le-Dain, Tarik Saikouk, Holger Schiele and Richard Calvi

Buying firms involve suppliers early in New Product Development (NPD) projects to benefit from their capabilities. The authors investigate the joint impact on project performance…

Abstract

Purpose

Buying firms involve suppliers early in New Product Development (NPD) projects to benefit from their capabilities. The authors investigate the joint impact on project performance improvement, of the social capital established throughout the project, and the strategic preferred buyer/supplier statuses awarded prior to the project, from the buyer's perspective.

Design/methodology/approach

The authors propose a conceptual model underlining the complementary contribution to project performance of social capital dimensions and of preferred partners' statuses resulting from social exchange expectations. The model is analyzed with Partial Least Squares using 80 responses of purchasers and R&D managers involved in collaborative NPD projects with suppliers.

Findings

The relational capital built during the project has a positive central role, with a direct impact on NPD project performance and mediating effects through cognitive and structural capitals. The preferred partners' statuses have strong direct impacts on performance, and mediating effects that do not completely supplant the social capital's contribution.

Practical implications

The implications for the efficient management of supplier involvement are twofold. First, the authors encourage strategic investments of buying firms to acquire preferred buyer's status and to support preferred supplier programs. Second, the authors alert them on the importance of establishing trust and shared cognition during the project.

Originality/value

This study captures NPD project performance from the social angle of buyer–supplier relationship management. It demonstrates the complementarity of relationship management at the strategic and operational levels, before and during the project unfolding.

Details

The International Journal of Logistics Management, vol. 35 no. 2
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Book part
Publication date: 12 December 2023

Audrey Harroche and Christine Musselin

The French higher education system has experienced reforms since the 2000s that gradually emphasized the executive power of universities and the centralization of decision-making…

Abstract

The French higher education system has experienced reforms since the 2000s that gradually emphasized the executive power of universities and the centralization of decision-making. This culminated with the excellence initiatives (Idex) that concentrated 7.7 billion euros on only nine institutions to create “world-class” universities and made their leaders responsible for the local allocation of this substantial endowment. The universities’ executives had four years to complete changes in governance in order to see their institution permanently awarded the title and the funding of Idex. The hiring process is one of the elements that this policy impacted the most within these universities, enabling leaders to create new kinds of positions and control the hiring process. However, by looking at the hiring practices within three different Idex, we will show that collegiality did not disappear but rather it evolved: in the three cases, the closest colleagues have been marginalized but decision-making remained collective and in the hands of academics chosen by the university executives. Variations in the intensity of this evolution could be observed according to two dimensions. First, the scientific reputation of the university: the higher it is, the less collegiality is transformed. Second, the level of external pressures: the less collegial universities have relaxed their hiring practices after the evaluation that permanently granted them the label of Idex.

Details

Revitalizing Collegiality: Restoring Faculty Authority in Universities
Type: Book
ISBN: 978-1-80455-818-8

Keywords

Article
Publication date: 12 February 2024

Udara Willhelm Abeydeera Lebunu Hewage, Jayantha Wadu Mesthrige and Eric G. Too

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Abstract

Purpose

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Design/methodology/approach

The current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.

Findings

The research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.

Research limitations/implications

The study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.

Originality/value

RM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 23 August 2022

Mohammad Nafe Assafi, Md. Mehrab Hossain, Nicholas Chileshe and Shuvo Dip Datta

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a…

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 August 2022

Abdul Wahab, Jun Wang, Alireza Shojaei and Junfeng Ma

Smart contracts using blockchain technology (BCT) is a tool that decentralizes authority and makes it easier to upgrade the contract administration process by providing an…

Abstract

Purpose

Smart contracts using blockchain technology (BCT) is a tool that decentralizes authority and makes it easier to upgrade the contract administration process by providing an efficient system. Current literature provides a good overview of contracts in the construction industry; however, the specific details of BCT's smart contracts applications in the three categories have not been addressed adequately: (1) information quality, (2) enhancing project schedule and progress payment time and (3) reducing conflicts among project stakeholders. Thus, this study aims to analyze smart contracts using BCT by creating a computerized contract model, specifically evaluating its impact on the three identified categories.

Design/methodology/approach

In this paper BCT-SmContract was developed through an automated program that utilizes blockchain to define the contractual agreements between different parties in a construction project. BCT-SmContract model provides a new technique to overcome the current challenges associated with factors identified in this study, i.e. (1) information quality, (2) enhancing project schedule and progress payment time and (3) reducing conflicts among project stakeholders. Afterward, the model was tested to ensure validity and reliability through a construction project.

Findings

The findings indicated that BCT-SmContract was approximately 90% faster to execute the contract and 100% accurate in reflecting the correct information about the project status, resulting in reduced conflicts.

Originality/value

This study has contributed in upgrading the traditional contracting method in construction by developing an automated smart contract model to enhance the processes and achieve higher accuracy.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 February 2022

Farzaneh Moshtaghian and Esmatullah Noorzai

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Abstract

Purpose

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Design/methodology/approach

In this research, all the information related to the construction of a residential project including 3D, 4D and 5D BIM models and the execution and control phases information was collected, and the risk list was determined for each activity accordingly.

Findings

The present study has suggested a framework for risk management in order to optimize project changes.

Originality/value

The lack of integration between 3D, 4D and 5D modeling besides execution information is a fundamental problem in many projects. The gap between these two groups of information will lead to improper management and late decisions, eventually imposing unforeseen delays and cost overruns. Risk management by the means of adopting a new approach has been addressed in recent studies using new methods, such as BIM and its associated technologies, some of which were mentioned in the review of theoretical literature in this research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 May 2023

Lin Jia, Ying Zhang and Chen Lin

Social interaction in comment sections has become a key factor for backers' decision making in crowdfunding platforms. However, current research on the two-way social interaction…

Abstract

Purpose

Social interaction in comment sections has become a key factor for backers' decision making in crowdfunding platforms. However, current research on the two-way social interaction in crowdfunding is insufficient, and there exist inconsistent conclusions. This study focuses on the social interaction between creators and backers and explores its influence on the successful exit of crowdfunding projects.

Design/methodology/approach

The extended Cox model is used for the empirical analysis of 1,988 crowdfunding projects on the Modian (www.modian.com) platform, a crowdfunding platform for cultural and creative projects in China. The two-way social interaction is reflected in comment quantity and sentiment, as well as reply rate.

Findings

Results reveal an inverted U-shaped relationship between comment quantity/sentiment and the successful exit of crowdfunding projects. This relationship is strengthened by high reply rate.

Originality/value

This study focuses on comment quantity and sentiment. The inverted U-shaped results reconcile previous conclusions. Replies from creators are regarded as a separate factor, and their moderating role is explained. The study research proves the importance of social interaction in crowdfunding platforms and provides suggestions for backers, creators and platform managers.

Details

Information Technology & People, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 20 October 2023

Jyh-Bin Yang and Ying-Fu Chen

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable…

Abstract

Purpose

An S-curve is an essential project-management tool. However, it is difficult to adjust S-curve to deal with a force majeure event. The present study develops four valuable adjustment approaches, designed to achieve a compromise between the views of the client and contractor. These can be used to control projects after a force majeure event.

Design/methodology/approach

The present study develops four adjustment approaches, which can be used to achieve a compromise between the views of the client and those of the contractor when controlling projects after a force majeure. To determine the S-curves during a force majeure event, two approaches can be selected: BCWS (budgeted cost of scheduled work)-base approach, or BCWP (budgeted cost of work performed)-base approach. To determine the rest of S-curves after a force majeure event, two approaches can be considered: maintaining the original curve of the remaining BCWS, or allocating the original curve of the remaining BCWS. Based on the validation of three empirical cases, drawn from a professional project-management website, this study confirms the feasibility of four proposed empirical approaches and a selection procedure for S-curve adjustment.

Findings

The S-curve-adjustment approaches presented here can be used to deal with cases that are ahead of, on and behind schedule. Using the proposed approaches and selection procedure, contractors can easily revise S-curves and control projects more effectively. To deal with a force majeure event, such as COVID-19, they are strongly advised to adopt the approaches labeled SA-A1 (to adjust the S-curve based on the extension ratio multiplied by the difference in progress during the force majeure) and SA-B1 (to maintain the original curve of the remaining BCWS) for the A/E and E/F curves, respectively.

Research limitations/implications

The proposed approaches can be used in cases of continuous construction during force majeure events. If construction work is totally suspended during such an event, it will be necessary to fine-tune the proposed approaches.

Originality/value

Previous studies have used case-oriented or mathematical-simulation approaches to forecast S-curves. The present study proposes simple approaches that allow the client and contractor to adjust the S-curve easily after a force majeure event. These approaches can be used to adjust work and project-completion targets within an extended duration. Selecting the right S-curve adjustment approach can help to control the remainder of the project, reducing the possibility of delay claims.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2023

Ercan Emin Cihan, Cigdem Alabas Uslu and Özgür Kabak

This study aims to develop a new integrated decision-making framework specifically designed to address complexity and uncertainty for project portfolio management. It particularly…

425

Abstract

Purpose

This study aims to develop a new integrated decision-making framework specifically designed to address complexity and uncertainty for project portfolio management. It particularly focuses on managing portfolios in a post-merger context. The paper portrays a normative and prescriptive approach to effectively creating a well-balanced project portfolio in a post-merger scenario.

Design/methodology/approach

This study introduces hyper-project portfolio frame as a prospective methodology for evaluating post-merger portfolios. The proposed method especially addresses the challenges associated with integration following a merger.

Findings

Hyper-project portfolio frame provides fundamental leaps in post-merger project portfolios. The frame gives opportunities to check consistency with policy, organizational scalability, flexibility and product diversity. It also underpins achieving the strategic objectives of mergers and acquisitions (M&As).

Research limitations/implications

The literature synthesis is approached from an interpretative standpoint. The research incorporates discussions and comparative studies from the relevant literature and introduces a novel approach. Additionally, new descriptive studies can expand the proposed process-oriented decision-making. Moreover, this research does not consider hostile takeovers.

Originality/value

Nested in content and process-oriented fashion, the frame provides suitable prequalification analysis for portfolios in a post-merger under the concepts of complexity, uncertainty, risk and value.

Details

Management Decision, vol. 61 no. 8
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 9 November 2021

Masoud Zavari and Mohammad Reza Afshar

In the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done…

Abstract

Purpose

In the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.

Design/methodology/approach

The proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.

Findings

The results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.

Originality/value

As there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 5
Type: Research Article
ISSN: 2398-4708

Keywords