Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5306

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Content available
Article
Publication date: 25 April 2023

Benjamin Jowett, David John Edwards and Mohamad Kassem

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT…

Abstract

Purpose

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT features and the construction management functions on sites.

Design/methodology/approach

A positivist approach with elements of interpretivism is adopted to allow to capture what is perceived as “reality” in relation to individuals’ interpretation and experience in the use and implementation of MBT. This is achieved by using a mixed qualitative-quantitative approach that can capture the various understandings of MBT. The research methods included a longitudinal case study over 12 months, two project workshops, expert interviews and an industry survey that together helped to investigate MBT at project, enterprise and industry levels.

Findings

The MBT requirements taxonomy included requirements relating to both project and organisation. Project requirements addressed MBT functionalities for sites and information management, while organisation requirements focused on the integration of MBT solutions with the enterprise from information technology, legal and security perspectives. A detailed matrix showing the interactions between five key MBT features and seven construction management functions was also developed.

Research limitations/implications

The two constructs developed by this study can help researchers to structure their investigation of key uses of MBT applications and their benefits. It can be used by researchers aiming to investigate integrated approaches to the digitalisation of construction sites, such as those enabled by Digital Twins. The interaction matrix can aid researchers in evaluating the intersections between the MBT functionalities and the site construction management functions (e.g. theoretical analysis of interactions from Lean Construction, benefit evaluation perspective). More broadly, the two constructs can support research and practice investigating the development of data-driven approaches on construction sites.

Practical implications

The developed MBT taxonomy can guide construction organisations in selecting suitable MBT for Field BIM for their projects. It can also act as a baseline against which varying MBT solutions can be compared.

Originality/value

Constructs such as taxonomies for MBTs; an understanding of MBT capabilities and use within the industry; and a lack of delineation between related terms, such as Mobile BIM, Field BIM, Site BIM, Cloud BIM and Mobile Apps, were lacking in the literature. This study contributed to addressing this gap.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 9 February 2022

Anja Perry and Sebastian Netscher

Budgeting data curation tasks in research projects is difficult. In this paper, we investigate the time spent on data curation, more specifically on cleaning and documenting…

2634

Abstract

Purpose

Budgeting data curation tasks in research projects is difficult. In this paper, we investigate the time spent on data curation, more specifically on cleaning and documenting quantitative data for data sharing. We develop recommendations on cost factors in research data management.

Design/methodology/approach

We make use of a pilot study conducted at the GESIS Data Archive for the Social Sciences in Germany between December 2016 and September 2017. During this period, data curators at GESIS - Leibniz Institute for the Social Sciences documented their working hours while cleaning and documenting data from ten quantitative survey studies. We analyse recorded times and discuss with the data curators involved in this work to identify and examine important cost factors in data curation, that is aspects that increase hours spent and factors that lead to a reduction of their work.

Findings

We identify two major drivers of time spent on data curation: The size of the data and personal information contained in the data. Learning effects can occur when data are similar, that is when they contain same variables. Important interdependencies exist between individual tasks in data curation and in connection with certain data characteristics.

Originality/value

The different tasks of data curation, time spent on them and interdependencies between individual steps in curation have so far not been analysed.

Details

Journal of Documentation, vol. 78 no. 7
Type: Research Article
ISSN: 0022-0418

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1025

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 28 October 2021

Eloise Atkinson, John Spillane, Jim Bradley and Tara Brooks

The purpose of this paper is to investigate the challenges faced with mobile information communication technology (M-ICT), more specifically tablet software, in the construction…

1829

Abstract

Purpose

The purpose of this paper is to investigate the challenges faced with mobile information communication technology (M-ICT), more specifically tablet software, in the construction phase of UK infrastructure projects. Quality assurance in the context of passive fire protection is scrutinised, where M-ICT use is prevalent, to provide an industry perspective.

Design/methodology/approach

The research design is founded on exploratory multiple case study approach. Specific themes are developed, based on a critical review of previous ICT studies. The themes identified are used to inform a qualitative interview protocol for investigating three large UK infrastructure projects. Each project is at different stages in the construction phase, with varying examples of M-ICT implementation in use. Participants are interviewed regarding their experiences of the implementation of M-ICT on each project.

Findings

Findings identify diverse experiences across each project. Single and multiple M-ICT platforms are currently being used, with individual stakeholders using ICT in isolation, and in some instances, multiple project stakeholders are using it together. Complete replacement of paper-based processes is evident in one case study, but more commonly, digital technology is being used in parallel to traditional paper-based processes. The challenges, although varied across each case study, can be categorised under the themes of Technology (IT support, ICT infrastructure, IT security, contractual, software), People (social aspects, user competency, safety), Technical Compliance (technical compliance evidence) and Process (conventional processes).

Originality/value

It is recommended that each theme be reviewed at project commencement, with all key stakeholders, to ensure key aspects are considered prior to M-ICT deployment. This will ensure avoidance of challenges reported and maximise the opportunities that are available through M-ICT in a multi-stakeholder infrastructure project.

Details

International Journal of Building Pathology and Adaptation, vol. 40 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 7 September 2020

Will Brown, Melanie King and Yee Mey Goh

This paper is premised upon an analysis of 26 cities within the UK regarding their smart city projects. Each city was analyzed through news articles, reports and policy documents…

Abstract

This paper is premised upon an analysis of 26 cities within the UK regarding their smart city projects. Each city was analyzed through news articles, reports and policy documents to ascertain the level of each city's development as a smart city. Each was coded by separating the projects into five types, which were ranked on a scale from 0 (no plans for use) to 5 (project type in use). The most common types are the provision of open data and the creation of business ecosystems as the primary driver of the smart city. However, many councils and enterprises proclaim smartness before the technology is actually in use, making it difficult to separate what is utilised and what is under development. Therefore, this paper further carried out an analysis of 20 cities and their intended plans to usher in the smart city, to observe the expected emergence of smart city technology. This was achieved by interrogating various roadmaps and policy documents produced by the respective cities. It was found that the most prevalent form of emergent smart city technology is the rollout of 5G and increased educational programmes alongside a proliferation of internet of things and electric vehicle usage.

Details

Emerald Open Research, vol. 1 no. 5
Type: Research Article
ISSN: 2631-3952

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 29 December 2022

Petter Haglund and Martin Rudberg

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics…

2964

Abstract

Purpose

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective.

Design/methodology/approach

A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019).

Findings

The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors.

Research limitations/implications

Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components.

Practical implications

Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit.

Originality/value

This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.

Details

The International Journal of Logistics Management, vol. 34 no. 7
Type: Research Article
ISSN: 0957-4093

Keywords

Open Access
Article
Publication date: 15 September 2017

Mariner Wang

The purpose of this study is to find out the future development of the Panama Canal after opening of the new waterway (third set of locks project), in terms of the change of cargo…

26354

Abstract

Purpose

The purpose of this study is to find out the future development of the Panama Canal after opening of the new waterway (third set of locks project), in terms of the change of cargo throughput, further deployment of fleets by the shipping companies and competition for the canal.

Design/methodology/approach

The research of this paper is based on an empiric study by collecting the relevant data from annual report of the Panama Canal Authority, publications related to the same field. Graphs pertaining to toll revenue also are made based on statistical data provided by the Panama Canal Authority.

Findings

The findings show that the opening of the new waterway of the Panama Canal generates more toll revenue for Panama government by allowing mega-vessels to transit, expediting further economic development of the country largely from behind. At the same time, shipping operators also can enjoy earning more revenue by deploying New Panamax vessels transiting the Canal.

Originality/value

Ingenuity in tabling the users of the Panama Canal by incorporating the logo marks of the shipping companies/implication is drawn through empirical analysis to provide the shipping companies and ports authorities concerned with more understanding toward the very significance of the new waterway expansion of the Panama Canal.

Details

Maritime Business Review, vol. 2 no. 3
Type: Research Article
ISSN: 2397-3757

Keywords

Open Access
Article
Publication date: 16 April 2020

Keith Still, Marina Papalexi, Yiyi Fan and David Bamford

This paper aims to explore the development and application of place crowd safety management tools for areas of public assembly and major events, from a practitioner perspective.

11514

Abstract

Purpose

This paper aims to explore the development and application of place crowd safety management tools for areas of public assembly and major events, from a practitioner perspective.

Design/methodology/approach

The crowd safety risk assessment model is known as design, information, management-ingress, circulation, egress (DIM-ICE) (Still, 2009) is implemented to optimise crowd safety and potentially throughput. Three contrasting case studies represent examples of some of the world’s largest and most challenging crowd safety projects.

Findings

The paper provides some insight into how the DIM-ICE model can be used to aid strategic planning at major events, assess potential crowd risks and to avoid potential crowd safety issues.

Practical implications

It provides further clarity to what effective place management practice is. Evidence-based on the case studies demonstrates that the application of the DIM-ICE model is useful for recognising potential place crowd safety issues and identifying areas for require improvement.

Originality/value

Crowd science is an emerging field of research, which is primarily motivated by place crowd safety issues in congested places; the application and reporting of an evidence-based model (i.e. DIM-ICE model) add to this. The paper addresses a research gap related to the implementation of analytic tools in characterising place crowd dynamics.

Details

Journal of Place Management and Development, vol. 13 no. 4
Type: Research Article
ISSN: 1753-8335

Keywords

1 – 10 of over 1000