Search results

1 – 10 of 489
Article
Publication date: 11 October 2021

Achinthya Dharani Perera Halnetti, Nihal Jayamaha, Nigel Peter Grigg and Mark Tunnicliffe

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the…

Abstract

Purpose

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the USA in terms of LSS project definition, structure and practices.

Design/methodology/approach

In-depth investigation through case studies – 12 Australian/New Zealand cases and 4 US cases – on the implementation mechanisms of successful LSS initiatives.

Findings

A significant difference was found between Australasian and US definitions of an LSS project. However, firms in both regions followed similar project selection, initiating and execution practices. LSS reporting structures were found to be well-established in US organizations, but none of the Australasian organizations were found to be equipped with such a structure, although the effectiveness of LSS implementation success remained unaffected.

Research limitations/implications

Sufficient uniformity of LSS was found across two regions implying its usefulness/generalizability, but the findings are based only on 12 cases.

Originality/value

The paper provides the groundwork to develop a unique LSS model for Australasian organizations to improve processes in an effective and efficient manner.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

457

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 23 January 2024

Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo and João Santos Baptista

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase…

Abstract

Purpose

This study aims to review recent advances towards the implementation of ANN and NLP applications during the budgeting phase of the construction process. During this phase, construction companies must assess the scope of each task and map the client’s expectations to an internal database of tasks, resources and costs. Quantity surveyors carry out this assessment manually with little to no computer aid, within very austere time constraints, even though these results determine the company’s bid quality and are contractually binding.

Design/methodology/approach

This paper seeks to compile applications of machine learning (ML) and natural language processing in the architectural engineering and construction sector to find which methodologies can assist this assessment. The paper carries out a systematic literature review, following the preferred reporting items for systematic reviews and meta-analyses guidelines, to survey the main scientific contributions within the topic of text classification (TC) for budgeting in construction.

Findings

This work concludes that it is necessary to develop data sets that represent the variety of tasks in construction, achieve higher accuracy algorithms, widen the scope of their application and reduce the need for expert validation of the results. Although full automation is not within reach in the short term, TC algorithms can provide helpful support tools.

Originality/value

Given the increasing interest in ML for construction and recent developments, the findings disclosed in this paper contribute to the body of knowledge, provide a more automated perspective on budgeting in construction and break ground for further implementation of text-based ML in budgeting for construction.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1050

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 October 2023

Renan Ribeiro Do Prado, Pedro Antonio Boareto, Joceir Chaves and Eduardo Alves Portela Santos

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in…

Abstract

Purpose

The aim of this paper is to explore the possibility of using the Define-Measure-Analyze-Improve-Control (DMAIC) cycle, process mining (PM) and multi-criteria decision methods in an integrated way so that these three elements combined result in a methodology called the Agile DMAIC cycle, which brings more agility and reliability in the execution of the Six Sigma process.

Design/methodology/approach

The approach taken by the authors in this study was to analyze the studies arising from this union of concepts and to focus on using PM tools where appropriate to accelerate the DMAIC cycle by improving the first two steps, and to test using the AHP as a decision-making process, to bring more excellent reliability in the definition of indicators.

Findings

It was indicated that there was a gain with acquiring indicators and process maps generated by PM. And through the AHP, there was a greater accuracy in determining the importance of the indicators.

Practical implications

Through the results and findings of this study, more organizations can understand the potential of integrating Six Sigma and PM. It was just developed for the first two steps of the DMAIC cycle, and it is also a replicable method for any Six Sigma project where data acquisition through mining is possible.

Originality/value

The authors develop a fully applicable and understandable methodology which can be replicated in other settings and expanded in future research.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 October 2023

Qiong Wu, Qiwei Zhou and Kathryn Cormican

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious…

Abstract

Purpose

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious silence about how to promote shared leadership in Lean Six Sigma (LSS) project teams. To address this deficit, the purposes of this study are to investigate the influence of shared leadership on LSS project success and to explore how team psychological safety, project task complexity and project task interdependence influence shared leadership.

Design/methodology/approach

A multi-source, time-lagged survey design with a four-month interval was conducted. To do this, the authors collected data from 71 project teams (comprising 71 project managers and 352 project members) using LSS approaches in the manufacturing and service industries.

Findings

The findings show that shared leadership positively influences LSS project success. The authors also found that team psychological safety fosters the development of shared leadership and, more importantly, these effects are stronger when the tasks are more complex and more interdependent.

Practical implications

These findings advance our understanding of the factors that enable shared leadership and equip LSS project managers with practical techniques to improve shared leadership for the success of their projects.

Originality/value

This study extends the theory of shared leadership to the context of LSS project management and is among the first, to the best of the authors’ knowledge, to theoretically propose and empirically validate how to promote shared leadership in LSS project teams.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 24 April 2024

Ronnie Figueiredo and Pedro Cabral

The purpose of this paper is to model a process for moving toward sustainable ecosystem service decisions in a Coastal Biodiversity and discuss the directions of the process for…

Abstract

Purpose

The purpose of this paper is to model a process for moving toward sustainable ecosystem service decisions in a Coastal Biodiversity and discuss the directions of the process for decision-makers to apply in ocean ecosystem services.

Design/methodology/approach

After the development of theoretical approaches to understand their prospects for the future development of ecosystem services, the authors worked on a process for developing factors for sustainable decision-making. It uses the Delphi method to develop all the factors supported by six dimensions in two specific moments: deductive-inductive and inductive-deductive.

Findings

This process of modeling the factors expands the possibility of adaptive governance to make prior and subsequent decisions using factors related to dimensions, stakeholders and benefits, risks, opportunities and costs.

Research limitations/implications

Considering the limitations, future studies could use another database to widen the view in terms of the studies, factors, dimensions and other additional information to maintain the evolution of this process in ocean ecosystem services decision-making. Another limitation arose in the number of projects and experts defining the factors. This may prevent the opportunity to have more impact in terms of future decisions if more sources are used in the market. In addition, time and the access to experts during this modeling process demonstrate a limitation, as does the time for feedback.

Practical implications

This set of factors developed for adaptive governance decision-making can be applied to develop a prior alignment of stakeholder interests with sustainable practices.

Social implications

This set of factors developed with the intervention of experts reinforces the importance of sustainable collective decisions on ocean ecosystem services. This is a joint approach with participants in the NextOcean project, sponsored by the European Commissions (EC)’s Horizon 2020 program. An Earth Observation-based Consortia aims to create sustainable value for Space, Land and Oceans.

Originality/value

This modeling process generated dimensions and factors to support adaptive governance stakeholders in making sustainable decisions in a coastal biodiversity zone.

Details

Sustainability Accounting, Management and Policy Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-8021

Keywords

Article
Publication date: 4 October 2021

Adeel Akmal, Nataliya Podgorodnichenko, Richard Greatbanks, Jeff Foote, Tim Stokes and Robin Gauld

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims…

Abstract

Purpose

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims to present a concerted attempt to create a quality improvement maturity model (QIMM) derived from holistic principles underlying the successful implementation of system-wide QI programmes.

Design/methodology/approach

A hybrid methodology involving a systematic review (Phase 1) of over 270 empirical research articles and books developed the basis for the proposed QIMM. It was followed by expert interviews to refine the core constructs and ground the proposed QIMM in contemporary QI practice (Phase 2). The experts included academics in two academic conferences and 59 QI managers from the New Zealand health-care system. In-depth interviews were conducted with QI managers to ascertain their views on the QIMM and its applicability in their respective health organisations (HOs).

Findings

The QIMM consists of four dimensions of organisational maturity, namely, strategic, process, supply chain and philosophical maturity. These dimensions progress through six stages, namely, identification, ad-hoc, formal, process-driven, optimised enterprise and finally a way of life. The application of the QIMM by the QI managers revealed that the scope of QI and the breadth of the principles adopted by the QI managers and their HOs in New Zealand is limited.

Practical implications

The importance of QI in health systems cannot be overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality.

Originality/value

This paper contributes new knowledge by presenting a maturity model with an integrated set of quality principles for HOs and their extended supply networks.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of 489