Search results

1 – 10 of over 9000
Article
Publication date: 20 September 2022

Vassiliki Demetracopoulou, William J. O'Brien, Nabeel Khwaja, Jeffrey Feghaly and Mounir El Asmar

Over the last three decades, construction projects have increasingly been delivered through alternative delivery methods. As a result, many owners have a range of delivery methods…

Abstract

Purpose

Over the last three decades, construction projects have increasingly been delivered through alternative delivery methods. As a result, many owners have a range of delivery methods to choose from and aim to use the right one for each of their projects. Researchers have developed several tools and decision-support processes to facilitate this selection procedure. The purpose of this study is to review and discuss differences and common themes across selection tools developed by academic researchers and project owners.

Design/methodology/approach

The study reviews prominent selection processes and tools used for infrastructure projects by conducting an in-depth literature review and using the content analysis method to elicit findings on the methodologies and criteria presented in the literature.

Findings

This study presents three principal findings. First, findings show three common themes emerge within the selection criteria—characteristics, goals and risks. Second, while academic studies most commonly suggest employing multi-attribute analysis, this study reveals that, in practice, selection tools most frequently employ a staged or gated evaluation based on the type of criteria and their importance to the decision. Finally, this review further highlights the importance of institutional context in decision-making.

Originality/value

This work contributes to the body of knowledge by providing guidance to practitioners and opening new directions for researchers around the way selection criteria are categorized in the relevant literature and the institutional context considerations when structuring or evaluating a selection process or tool.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Giovanni Cláudio Pinto Condé, José Carlos Toledo and Mauro Luiz Martens

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection…

Abstract

Purpose

The purpose of this paper is to test and develop a method for generation and selection of six sigma projects. This is done by testing the use of the generation and selection method for six sigma projects (GSM_SSP) in a Brazilian manufacturing industry with the participation of managers, aiming to gather the user’s perspective and improvement opportunities for the approach itself.

Design/methodology/approach

The work adopts the action research (AR) approach once the researchers were busily involved in the training, implementation and use of the GSM_SSP. The intervention was performed in on a series of 15 workshops, with a group of managers, during six months.

Findings

The application of the eight steps of the GSM_SSP approach assisted the company’s management team to generate nine project candidates and also to select three six sigma projects. This study also finds and discusses barriers and lessons learned used to improve the GSM_SSP.

Research limitations/implications

This study presents an example of how six sigma project generation and selection has been applied to a manufacturing industry by adapting AR to the process using the eight steps of GSM_SSP, demonstrating how the management team was involved. This study should be replicated in different companies because AR is limited in its generalization.

Originality/value

To the best of the authors’ knowledge, this study represents the first use of AR methodology in six sigma project selection. This study contributes a method that can generate and select six sigma projects. In doing so, the research offers a simple approach that can be used by managers. In addition, the steps of the approach before selection were explored.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 7 June 2023

Ruyue Han, Xingmei Li, Zhong Shen and Dongqing Jia

The consideration of the substitution phenomenon in the project portfolio selection problem can improve the robustness of project portfolio selection and help enterprises better…

Abstract

Purpose

The consideration of the substitution phenomenon in the project portfolio selection problem can improve the robustness of project portfolio selection and help enterprises better achieve their strategic objectives. However, the existence of inter-project risk propagation will have a negative impact on project substitution. This paper proposes a new framework for project portfolio selection and constructs a risk propagation model based on strategic objectives to study the impact of risk propagation on substitution in the project portfolio.

Design/methodology/approach

The authors first construct a risk propagation model based on strategic objectives to describe the risk propagation between projects. Then the project substitution phenomenon based on risk propagation is put forward, and the calculation method of substitution loss is given. Finally, a robust project portfolio selection framework based on strategic objectives considering risk propagation is constructed.

Findings

The analysis of a case study demonstrates that (1) With the increase of risk intensity, the strategic loss of the same project portfolio increases linearly, and under the same risk intensity, the more projects in the portfolio, the stronger the robustness. (2) Considering risk propagation, the effect of project substitution is significantly weakened, and the strategic loss rate of the project portfolio is significantly increased compared with that of a direct attack.

Originality/value

This study is the first to take the project substitution into account in the project portfolio selection process. Moreover, the authors describe inter-project risk propagation and analyze the impact of risk propagation on the project substitution phenomenon. Finally, the authors extend the evaluation index of robustness. This paper puts forward a new way to solve the problem of project portfolio selection.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2023

Mehdi Namazi, Madjid Tavana, Emran Mohammadi and Ali Bonyadi Naeini

New business practices and the globalization of markets force firms to take innovation as the fundamental pillar of their competitive strategy. Research and Development (R&D…

Abstract

Purpose

New business practices and the globalization of markets force firms to take innovation as the fundamental pillar of their competitive strategy. Research and Development (R&D) plays a vital role in innovation. As technology advances and product life cycles become shorter, firms rely on R&D as a strategy to invigorate innovation. R&D project portfolio selection is a complex and challenging task. Despite the management's efforts to implement the best project portfolio selection practices, many projects continue to fail or miss their target. The problem is that selecting R&D projects requires a deep understanding of strategic vision and technical capabilities. However, many decision-makers lack technological insight or strategic vision. This article aims to provide a method to capitalize on the expertise of R&D professionals to assist managers in making informed and effective decisions. It also provides a framework for aligning the portfolio of R&D projects with the organizational vision and mission.

Design/methodology/approach

This article proposes a new strategic approach for R&D project portfolio selection using efficiency-uncertainty maps.

Findings

The proposed strategy plane helps decision-makers align R&D project portfolios with their strategies to combine a strategic view and numerical analysis in this research. The proposed strategy plane consists of four areas: Exploitation Zone, Challenge Zone, Desperation Zone and Discretion Zone. Mapping the project into this strategic plane would help decision-makers align their project portfolio according to the corporate perspectives.

Originality/value

The new approach combines the efficiency and uncertainty dimensions in portfolio selection into an integrated framework that: (i) provides a complete representation of the stochastic decision-making processes, (ii) models the endogenous uncertainty inherent in the project selection process and (iii) proposes a computationally practical and visually unique solution procedure for classifying desirable and undesirable R&D projects.

Details

Benchmarking: An International Journal, vol. 30 no. 10
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 28 December 2023

Cláudia Rafaela Saraiva de Melo Simões Nascimento, Adiel Teixeira de Almeida-Filho and Rachel Perez Palha

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria…

Abstract

Purpose

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria, thereby meeting the needs of the institution and the existing constraints.

Design/methodology/approach

The research design follows a framework using technique for order preference by similarity to ideal solution (TOPSIS) associated with integer linear programming.

Findings

The method involves a flow of assessments allowing criteria and weights to be elicited where outcomes are based on the experts' intra-criteria assessment of alternatives and decision-makers' inter-criteria assessment. This is of utmost interest to public organizations, where selections must result in benefits and lower costs, integrating the experts' technical and management perspectives.

Social implications

Public institutions are characterized by having limited financial and personnel resources for project development despite having a high demand for requests not associated with profits, making it essential to have a framework that enables using multiple criteria to better evaluate the benefits related to these decisions.

Originality/value

The main contributions of this article are: (1) the proposition of a framework for selecting construction project portfolios considering the organization's strategic needs; (2) identifying quantitative and qualitative assessment criteria for project selection; (3) integrating TOPSIS with an optimization process for selecting the construction project portfolios and (4) providing a structured decision process for selecting the portfolio that best represents the interests of the institution within its limited resources and personnel.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 April 2022

Yizhong Chen, Taozhi Zhuang and Guiwen Liu

The aims of this paper is to establish an appropriate physical-change-based renewal (PCBR) projects selection mechanism capable of selecting the combination of the PCBR projects…

Abstract

Purpose

The aims of this paper is to establish an appropriate physical-change-based renewal (PCBR) projects selection mechanism capable of selecting the combination of the PCBR projects that can make up an integrated urban renewal program in high-density cities.

Design/methodology/approach

The research design follows a sequential integrated methodology that combines the calculation algorithms of Fuzzy Analytic Network Process (Fuzzy-ANP) with Zero-One Goal Programming (ZOGP) to support decisions for the selection of PCBR projects. In the first phase, general criteria for assessing the sustainability performance of PCBR projects were collected from relevant literature. In the second phase, the Fuzzy-ANP was used to identify the priority weights of the candidate projects through clarifying the interdependent degree between the criteria and candidate projects. Finally, ZOGP method was selected as a predetermined number of PCBR projects among candidate projects.

Findings

The feasibility and effectiveness of this hybrid approach is then verified in a case study of Yuzhong District, Chongqing in China. The results of this study indicate that the integrated method is capable of directing the decision maker toward the best compromising solution of PCBR program that can achieve the maximization of sustainable benefits and allocate limited resources most efficiently.

Originality/value

The novelty of this paper consists in combining the algorithms of the Fuzzy-ANP method with those of the ZOGP model that serves as an effective analysis tool to address practical decision problems. This is the first hybrid algorithms to make PCBR projects selection decision that reach the maximization of the sustainable benefits, both in economic and socio-environmental terms.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Yue Teng and Mengqi Yuan

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship…

Abstract

Purpose

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship sustainability. The developer satisfaction reflecting requirements can boost the cooperative relationship among stakeholders and act as an evaluation scale for the success of GB projects, which needs to be emphasized in the selection process but little involved in the existing research. This study explores improving GB contractor (GBC) selection by integrating developer satisfaction into selection procedures.

Design/methodology/approach

A systematic framework of GBC selection including twenty-five criteria from literature review and experts survey is firstly constructed. Both tactical and strategic criteria are further classified into Kano categories (must-be, one-dimensional, and attractive categories) using the fuzzy Kano model (FKM), and weighted by the developer satisfaction index. The model proposed by this study combining FKM and TOPSIS divides the selection process into the filtration phase and selection phase by Kano categories. The proposed model is finally verified through performance comparison among multiple methods in a case.

Findings

Selection criteria are measured linearly and nonlinearly, showing criteria having nonlinear satisfaction change accounts for two-thirds of all. Criteria at tactical level tend to be must-be or one-dimensional categories for the developer, and most strategic criteria are classed as the attractive category, indicating that adding strategic criteria is necessary for long-term cooperation. The proposed model, using developer satisfaction to improve the selection process, ensures the selected GBC to be the most satisfactory with requirements of the developer and makes the performance of GBCs easily distinguishable.

Originality/value

This study contributes to the existing body of knowledge for promoting relationship sustainability by supplementing an integrated model with emphasis on developer satisfaction in GBC selection, so as to establish a good initial foundation due to the match between performances of GBCs and needs of developers. It not only helps maximize developer satisfaction in GBC selection by applying satisfaction to pre-construction management, but also instructs GBCs to prioritize performance improvements. The framework is also conducive for developers to classify selection criteria and select other participants (like green suppliers) from the satisfaction perspective in GBs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 November 2023

Libiao Bai, Mengqin Yang, Tong Pan and Yichen Sun

Selecting and scheduling optimal project portfolio simultaneously is a complex decision-making problem faced by organizations to realize the strategy. However, dynamic synergy…

Abstract

Purpose

Selecting and scheduling optimal project portfolio simultaneously is a complex decision-making problem faced by organizations to realize the strategy. However, dynamic synergy relationships among projects complicate this problem. This study aims at constructing a project portfolio selection and scheduling (PPSS) model while quantifying the dynamic synergetic effects to provide decision support for managing PPSS problems.

Design/methodology/approach

This study develops a mathematical model for PPSS with the objective of maximal project portfolio benefits (PPBs). To make the results align with the strategy, comprehensive PPBs are divided into financial and non-financial aspects based on the balanced scorecard. Then, synergy benefits evolve dynamically in the time horizon, and system dynamics is employed to quantify them. Lastly, a case example is conducted to verify the applicability of the proposed model.

Findings

The proposed model is an applicable model for PPSS while incorporating dynamic synergy. It can help project managers obtain the results that which project should be selected and when it should start while achieving optimal PPBs.

Originality/value

This study complements prior PPSS research in two aspects. First, financial and non-financial PPBs are designed as new criteria for PPSS, making the results follow the strategy. Second, this study illuminates the dynamic characteristic of synergy and quantifies the synergetic effect. The proposed model provides insights into managing a PPSS effectively.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 22 August 2023

Lei Cui

The construction industry has long been criticized for unethical conduct. The owner usually manages the contractor's opportunistic behaviors by employing a professional…

Abstract

Purpose

The construction industry has long been criticized for unethical conduct. The owner usually manages the contractor's opportunistic behaviors by employing a professional supervisor, but there is a risk of covert collusion between the supervisor and contractor. Based on the principal–agent theory and collusion theory, this paper aims to investigate optimal collusion-proof incentive contracts.

Design/methodology/approach

This paper presents a game-theoretic framework comprising an owner, supervisor and contractor, who interact and pursue maximized self-profits. Built upon the fixed-price incentive contract, cost-reimbursement contract, and revenue-sharing contract, different collusion-proof incentive contracts are investigated. A real project case is used to validate the developed model and derived results.

Findings

This paper shows that the presence of unethical collusion undermines the owner's interests. Especially, the possibility of agent collusion may induce the owner to abandon extracting quality information from the supervisor. Furthermore, information asymmetry significantly affects the construction contract selection, and the application conditions for different incentive contracts are provided.

Research limitations/implications

This study still has some limitations that deserve further exploration. First, this study explores contractor–supervisor collusion but ignores the possibility of the supervisor abusing authority to extort the contractor. Second, to focus on collusion, this paper ignores the supervision costs. What's the optimal supervision effort that the owner should induce the supervisor to exert? Finally, this paper assumes that the colluders involved always keep their promises. However, what if the colluders may break their promises?

Practical implications

Several collusion-proof incentive contracts are explored in a project management setting. The proposed incentive contracts can provide the project owner with effective and practical tools to inhibit covert collusion in construction management and thus safeguard construction project quality.

Originality/value

This study expands the organization collusion theory to the field of construction management and investigates the optimal collusion-proof incentive contracts. In addition, this study is the first to investigate the effects of information asymmetry on contract selection.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 August 2022

Nayana Dissanayake, Bo Xia, Martin Skitmore, Bambang Trigunarsyah and Vanessa Menadue

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction…

Abstract

Purpose

The purpose of this study was to prioritize the appropriate generic contractor selection criteria for Engineering–Procurement–Construction (EPC) projects in the construction industry.

Design/methodology/approach

Proceeding from a review of previous studies and validation by a small group of experts, a preliminary set of 16 criteria was first identified. This was followed by three rounds of Delphi surveys: firstly, with 64 experienced participants confirming the relevance of the 16 criteria; secondly, with a reduced subgroup of 47 more experienced participants scoring the importance of each; and finally, providing the opportunity for these 47 to revise their scores in the light of knowing the aggregated results of the previous round.

Findings

The results show the consensus view, of which the most important criteria are ranked as past performance, project understanding, technical attributes, key personnel, health and safety, past experience, time, management, financial, contractual and legal, quality, cost, relationships, environmental and sustainability, organizational and industrial relations, and geographic location.

Originality/value

The findings are useful for both practitioners and academics in making a significant contribution to the body of knowledge of the EPC process. This will assist in providing a better understanding of criteria importance and pave the way to developing an EPC contractor selection model involving the criteria most needed to objectively identify potential contractors and evaluate tenders.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 9000