Search results

1 – 10 of over 5000

Abstract

Details

Integrated Land-Use and Transportation Models
Type: Book
ISBN: 978-0-080-44669-1

Book part
Publication date: 6 November 2013

Ronald K. Klimberg, George P. Sillup, Kevin J. Boyle and Alyssa Beck

A common problem that many universities face, especially with their specialized programs, is coordinating faculty availability and class offerings. The schedule is usually…

Abstract

A common problem that many universities face, especially with their specialized programs, is coordinating faculty availability and class offerings. The schedule is usually developed using paper and pencil after numerous iterations. As a result, the objectives of the program, such as course integration, length of course, and student workload, are most likely compromised in lieu of faculty availability. This chapter describes a multiple objective approach to this class assignment problem that considers the program’s objectives and faculty preferences. The results of applying this class assignment model to an Executive MBA (EMBA) program are presented.

Open Access
Book part
Publication date: 1 May 2019

Marco A. Bragadin and Kalle Kähkönen

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry…

Abstract

Purpose

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry out the evaluation of construction schedules.

Design/Methodology/Approach

The development of the Schedule Health assessment method can be characterised as constructive research. The structuring of the method is based on analysis of factors forming the overall quality of construction schedules. The method has been tested in a proof of concept study. This comprised a case study in which four master schedules developed by junior production managers were evaluated using the Schedule Health assessment method.

Findings

It is possible to construct a method for the quality evaluation of construction schedules.

Research Limitations/Implications

The completed testing is still rather limited since it is based merely on experiences of junior production managers with a single case.

Practical Implications

The Schedule Health assessment method can in a useful manner make the quality evaluation of construction schedules easy to approach and effective process.

Originality/Value

This research has produced a novel method for the quality evaluation of construction schedules.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Book part
Publication date: 5 October 2018

Nima Gerami Seresht, Rodolfo Lourenzutti, Ahmad Salah and Aminah Robinson Fayek

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes and…

Abstract

Due to the increasing size and complexity of construction projects, construction engineering and management involves the coordination of many complex and dynamic processes and relies on the analysis of uncertain, imprecise and incomplete information, including subjective and linguistically expressed information. Various modelling and computing techniques have been used by construction researchers and applied to practical construction problems in order to overcome these challenges, including fuzzy hybrid techniques. Fuzzy hybrid techniques combine the human-like reasoning capabilities of fuzzy logic with the capabilities of other techniques, such as optimization, machine learning, multi-criteria decision-making (MCDM) and simulation, to capitalise on their strengths and overcome their limitations. Based on a review of construction literature, this chapter identifies the most common types of fuzzy hybrid techniques applied to construction problems and reviews selected papers in each category of fuzzy hybrid technique to illustrate their capabilities for addressing construction challenges. Finally, this chapter discusses areas for future development of fuzzy hybrid techniques that will increase their capabilities for solving construction-related problems. The contributions of this chapter are threefold: (1) the limitations of some standard techniques for solving construction problems are discussed, as are the ways that fuzzy methods have been hybridized with these techniques in order to address their limitations; (2) a review of existing applications of fuzzy hybrid techniques in construction is provided in order to illustrate the capabilities of these techniques for solving a variety of construction problems and (3) potential improvements in each category of fuzzy hybrid technique in construction are provided, as areas for future research.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Content available
Book part
Publication date: 13 November 2018

Lana Kay Coble

Abstract

Details

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Type: Book
ISBN: 978-1-78743-148-5

Book part
Publication date: 25 April 2022

Duc-Hoc Tran and Putri Basenda Tarigan

The concept of sustainability is about the relationships among people, the planet, and profit. Nowadays, it has been spread to many areas, including construction projects

Abstract

The concept of sustainability is about the relationships among people, the planet, and profit. Nowadays, it has been spread to many areas, including construction projects. Sustainability in construction projects has been so important in the present time. It is commonly pointed to the environment and construction materials. Nevertheless, it is also important in construction management which addresses sustainable project scheduling. Sustainable project scheduling will help to deliver the project under the deadlines, within the available budget, and also ensuring about the quality of the works. This study presents the trade-off among time, cost, and quality in the construction project to provide the decision-maker some alternative solutions in the planning phase to conduct a sustainable construction project. Multi-objective optimisation using Symbiotic Organism Search (SOS) algorithm is done to find the best solutions to the problem under investigation. Then, fuzzy logic approach is utilised to model the diverse environment and uncertainty in the construction project. A case study in repetitive construction project is analysed to see the capability of the model to work in time cost quality trade-off to reach into a sustainable construction project.

Abstract

Details

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Type: Book
ISBN: 978-1-78743-148-5

Abstract

Details

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Type: Book
ISBN: 978-1-78743-148-5

Content available
Book part
Publication date: 13 November 2018

Lana Kay Coble

Abstract

Details

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Type: Book
ISBN: 978-1-78743-148-5

Book part
Publication date: 10 October 2017

Hans Mikkelsen and Jens O. Riis

Our notion of project control is based on the five-by-five model and constitutes a comprehensive control model including control of results, time and work control, resource…

Abstract

Our notion of project control is based on the five-by-five model and constitutes a comprehensive control model including control of results, time and work control, resource control, financial control, and contract management.

The task of project control is determined by uncertainty and complexity and calls for improvisation and ingenuity in order to be able to maneuver the project. The notion of forward-oriented follow-up is introduced.

Details

Project Management
Type: Book
ISBN: 978-1-78714-830-7

1 – 10 of over 5000