Search results

1 – 10 of over 1000
Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 October 2023

Dan-Yi Wang and Xueqing Wang

In construction projects, engineering variations are very common and create breeding grounds for opportunistic claims. This study investigates the complementary effect between an…

Abstract

Purpose

In construction projects, engineering variations are very common and create breeding grounds for opportunistic claims. This study investigates the complementary effect between an inspection mechanism and a reputation system in deterring opportunistic claims, considering an employer with limited inspection accuracy and a contractor, which can be either reputation-concerned or opportunistic.

Design/methodology/approach

This paper applies a signaling game to investigate the complementary effect between the employer's inspection and a reputation system in deterring the contractor's possible opportunistic claim, considering the information-flow influence of claiming prices.

Findings

This study finds that in the exogenous-inspection-accuracy case, the employer does not always inspect the claim. A more stringent reputation system complements a less accurate inspection only when the inspection cost is lower than a threshold, but may decline the employer's surplus or social welfare. In the optimal-inspection-accuracy case, the employer always inspects the claim. However, only a sufficiently stringent reputation system can guarantee the effectiveness of an optimal inspection in curbing opportunistic claims. A more stringent reputation system has a value-stepping effect on the employer's surplus but may unexpectedly impair social welfare, whereas a higher inspection cost efficiency always reduces social welfare.

Originality/value

This article contributes to the project management literature by combing the signaling game theory with the reputation theory and thus embeds the problem of inspection mechanism design into a broader socio-economic framework.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

93

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 December 2023

Libiao Bai, Xuyang Zhao, ShuYun Kang, Yiming Ma and BingBing Zhang

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions…

Abstract

Purpose

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions may lead to conflict risks. These conflict risks change dynamically with different stages of the PP life cycle, increasing the challenge of PP risk management. Existing conflict risk research mainly focuses on source identification but lacks risk assessment work. To better manage the stakeholder conflict risks (SCRs) of R&D PPs, this study employs the dynamic Bayesian network (DBN) to construct its dynamic assessment model.

Design/methodology/approach

This study constructs a DBN model to assess the SCRs in R&D PP. First, an indicator system of SCRs is constructed from the life cycle perspective. Then, the risk relationships within each R&D PPs life cycle stage are identified via interpretative structural modeling (ISM). The prior and conditional probabilities of risks are obtained by expert judgment and Monte Carlo simulation (MCS). Finally, crucial SCRs at each stage are identified utilizing propagation analysis, and the corresponding risk responses are proposed.

Findings

The results of the study identify the crucial risks at each stage. Also, for the crucial risks, this study suggests appropriate risk response strategies to help managers better perform risk response activities.

Originality/value

This study dynamically assesses the stakeholder conflict risks in R&D PPs from a life-cycle perspective, extending the stakeholder risk management research. Meanwhile, the crucial risks are identified at each stage accordingly, providing managerial insights for R&D PPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 June 2022

Mireille Chidiac El Hajj, May Chidiac and Ali Awdeh

This paper aims at shedding light on the entrepreneurs' perception towards crowdfunding as a new mean for raising capital, and their willingness to send appropriate signals to the…

Abstract

Purpose

This paper aims at shedding light on the entrepreneurs' perception towards crowdfunding as a new mean for raising capital, and their willingness to send appropriate signals to the potential fund providers/backers.

Design/methodology/approach

The research strategy is based on three methodological approaches: desk research on online sources, a map of the crowdfunding phenomenon, and a quantitative approach with a survey performed between June and December 2020. The survey covers a sample of 147 Small and Medium enterprises (SMEs) and startups, in addition to semi-structured interviews with 10 entrepreneurs.

Findings

The study reveals that between losing their work and losing part of their firms' equity, entrepreneurs are keen on sending positive signals to backers. Moreover, they are willing to adopt a new way of thinking, as their primary goal is to save their firms, their jobs, and their source of income. The research highlights the concern of entrepreneurs of losing reputation, losing intellectual property, losing control, and of becoming only shareholders in their enterprises.

Research limitations/implications

The main limitation in this paper is that no single study in Lebanon adequately covers the topic and thus extensive research has been carried out on crowdfunding across the world and analyzed in the Lebanese context.

Practical implications

Overcoming funding challenges can reduce brain drain, promote a culture of entrepreneurship, serve the economy, combat poverty, achieve more equitable society, increase the levels of expectations, and turn the flywheel. Moreover, the paper presents clear implications for the field of policy-making both in developing and developed countries.

Originality/value

Considering the serious financial disintermediation and liquidity shortage Lebanon faces, the findings of this study show how important changing entrepreneurial culture and behavior is, and the crucial role crowdfunding could play in providing funds for the SMEs that form 95% of the total business sector in Lebanon.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Open Access
Article
Publication date: 19 December 2023

Mueen Ghazi Elmobayed, Hamood Mohammed Al-Hattami, Mohammed A. Al-Hakimi, Walaa Salama Mraish and Ahmad Samed Al-Adwan

This research aims to determine the effect of marketing literacy on the success of entrepreneurial projects (EPS) in Palestine.

589

Abstract

Purpose

This research aims to determine the effect of marketing literacy on the success of entrepreneurial projects (EPS) in Palestine.

Design/methodology/approach

To attain the study’s purpose, the researchers employed the questionnaire, which was applied to a random sample of 298 individuals from the owners of entrepreneurial projects in Palestine. The data were analyzed and tested using SmartPls 4 software.

Findings

The study reached a set of results, including that the level of marketing literacy among owners of small businesses in the Gaza Strip was significantly higher for customer service (CS), management style (MS), technology (T) and customer retention (CR). In particular, the results implied that CS, MS, T and CR significantly and positively affect EPS.

Practical implications

This research would help the start-ups in Palestine spread marketing literacy among the workers in entrepreneurial projects.

Originality/value

Today, most countries tend to support entrepreneurs and owners of creative ideas and entrepreneurial projects through various programs. To the best of the authors'' knowledge, this research is distinguished by its modernity and scarcity in the Arab world, particularly in Palestine. Thus, it would help raise awareness of marketing literacy among owners of entrepreneurial projects and provide empirical evidence of success for those who are about to establish an entrepreneurial project.

Details

Arab Gulf Journal of Scientific Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1985-9899

Keywords

Article
Publication date: 16 February 2024

M.K.S. Al-Mhdawi, Alan O'connor, Abroon Qazi, Farzad Rahimian and Nicholas Dacre

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Abstract

Purpose

This research aims to systematically review studies on significant risks for Critical Infrastructure Projects (CIPs) from selected top-tier academic journals from 2011 to 2023.

Design/methodology/approach

In this research, a three-step systematic literature review methodology was employed to analyse 55 selected articles on Critical Infrastructure Risks (CIRs) from well-regarded and relevant academic journals published from 2011 to 2023.

Findings

The findings highlight a growing research focus on CIRs from 2011 to 2023. A total of 128 risks were identified and grouped into ten distinct categories: construction, cultural, environmental, financial, legal, management, market, political, safety and technical risks. In addition, literature reviews combined with questionnaire surveys were more frequently used to identify CIRs than any other method. Moreover, oil and gas projects were the subjects most often explored in the reviewed papers. Furthermore, it was observed that publications from Iran, the USA and China dominated CIRs research, making significant contributions, accounting for 49.65% of the analysed articles.

Research limitations/implications

This research specifically focuses on five types of CIPs (i.e. roadways, bridges, water supply systems, dams and oil and gas projects). Other CIPs like cyber-physical systems or electric power systems, were not considered in this research.

Practical implications

Governments and contracting firms can benefit from the findings of this study by understanding the significant risks associated with the execution of CIPs, irrespective of the nation, industry or type of project. The results of this investigation can offer construction professionals valuable insights to formulate and implement risk response plans in the early stages of a project.

Originality/value

As a novel literature review related to CIRs, it lays the groundwork for future research and deepens the understanding of the multi-faceted effects of these risks, as well as sets practical response strategies.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 March 2024

Tuan Son Nguyen, Sherif Mohamed and Sherif Mostafa

This study delves into the dynamics between Agile Response to Change (AR), Adaptive Scoping (AS), Stakeholder Engagement (SE) and Project Performance (PP), with a special focus on…

Abstract

Purpose

This study delves into the dynamics between Agile Response to Change (AR), Adaptive Scoping (AS), Stakeholder Engagement (SE) and Project Performance (PP), with a special focus on the moderating influence of Project Complexity (PC). The research, grounded in a thorough literature review, identifies critical gaps in these areas and examines the extent to which PC moderates the effects of AR, AS and SE on PP, offering new perspectives for managing complex projects.

Design/methodology/approach

The research develops a conceptual model based on a critical analysis of existing literature. A comprehensive questionnaire was designed, incorporating 28 items to measure AR, AS, SE, PP and PC. Data was collected from 136 project managers across various industries, and the responses were analysed using structural equation modelling (SEM) to explore the complex interplay between these variables.

Findings

The analysis revealed that internal AR (ARint) significantly enhances both quantitative (PPqt) and qualitative aspects of PP (PPql). AS and SE were found to positively influence PPql, but their impact on PPqt was not significant. Interestingly, PC was observed to negatively moderate the relationship between ARint and PPql, while its moderating effect on the relationship between ARint and PPql was not significant. The study also notes that PC does not significantly alter the positive correlations between AS, SE and PPql.

Originality/value

This research contributes to the existing body of knowledge by elucidating the relationships between ARint, AS, SE and different dimensions of PP. It uniquely explores the role of PC as a moderating variable in these relationships, offering valuable insights for practitioners and researchers in the field of complex project management.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of over 1000