Search results
1 – 10 of over 5000This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural…
Abstract
Purpose
This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural history.
Design/methodology/approach
The methodology applied for this study was a theory-interpretive analysis. This study examines the modernization process of Seoul based on the concept of “high modernism,” in that the theory-interpretive analysis method analyzes historical phenomena centered on a specific concept.
Findings
As a form of national belief, the various ideas that give birth to modern cities are defined as “high modernism.” As a Korean megastructure, the Sewoon Sangga project is significant in the history of Korean urbanism and architecture because it is the archetype of Korean high modernism and is representative of South Korea's compressed economic growth. However, soon-to-be-demolished Sewoon Sangga signifies the failure of Korean high modernism. This study identified the critical characteristics of Korean high modernism through the Sewoon Sangga project.
Originality/value
This study analyzed a representative Asian city through the specific concept of high modernism. It transpired that high modernism, which played an important role in the birth and development of modern cities, should be transformed for future cities and architectural development. This study has significance in that it expands the study of the history of urbanism and architecture centered on the West to the same in Asia.
Details
Keywords
Emma Mihocic, Koorosh Gharehbaghi, Per Hilletofth, Kong Fah Tee and Matt Myers
In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail…
Abstract
Purpose
In successfully meeting city and metropolitan growth, sustainable development is compulsory. Sustainability is a must-focus for any project, particularly for large and mega rail infrastructure. This paper aims to investigate to what degree social, environmental and economic factors influence the government when planning sustainable rail infrastructure projects. To respond to such a matter, this paper focuses on two Australian mega-rail projects: the South West Rail Link (SWRL) and the Mernda Rail Extension (MRE).
Design/methodology/approach
As the basis of an experimental evaluation framework strengths, weaknesses, opportunities and threats (SWOT) and factor analysis were used. These two methods were specifically selected as comparative tools for SWRL and SWRL projects, to measure their overall sustainability effect.
Findings
Using factor analysis, in the MRE, the factors of network capacity, accessibility, employment and urban planning were seen frequently throughout the case study. However, politics and economic growth had lower frequencies throughout this case study. This difference between the high-weighted factors is likely a key element that determined the SWRL to be more sustainable than the MRE. The SWOT analysis showed the strengths the MRE had over the SWRL such as resource use and waste management, and natural habitat preservation. These two analyses have shown that overall, calculating the sustainability levels of a project can be subjective, based on the conditions surrounding various analysis techniques.
Originality/value
This paper first introduces SWRL and MRE projects followed by a discussion about their overall sustainable development. Both projects go beyond the traditional megaprojects' goal of improving economic growth by developing and enhancing infrastructure. Globally, for such projects, sustainability measures are now considered alongside the goal of economic growth. Second, SWOT and factor analysis are undertaken to further evaluate the complexity of such projects. This includes their overall sustainable development vision alignment with environmental, economic and social factors.
Details
Keywords
Simon Wyke, Søren Munch Lindhard and Jesper Kranker Larsen
Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as…
Abstract
Purpose
Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as identified in previous research. This has led to a need for better understanding how factors affecting cost and time overruns on public construction projects can be managed more efficiently. The purpose of this paper is to address these issues.
Design/methodology/approach
In this study 26 factors affecting cost and time overruns on construction projects were identified, through qualitative interviews with project managers from Danish governmental agencies and through a literature review. Through principal component analyses the 26 factors were subsequently narrowed down to four primary latent factors.
Findings
The identified four latent factors affecting cost and time overruns on public construction projects were lack of quality management, lack of project pre-planning, lack of user management and lack of project management.
Originality/value
Previous research has focussed on increasing knowledge by identifying and ranking factors affecting time and cost performance. This has led to the identification of an overwhelming number of factors to use for managing construction projects. The present research reduced the number of factors by clustering them into key latent factors responsible for most of the deviation in performance, narrowing the scope of construction cost and time management into a few tangible key focus areas. This supports and improves fast decision-making that is necessary in a changeable environment such as construction.
Details
Keywords
Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…
Abstract
Purpose
In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.
Design/methodology/approach
A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.
Findings
The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.
Research limitations/implications
The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.
Practical implications
This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.
Originality/value
The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.
Details
Keywords
B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…
Abstract
Purpose
Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.
Design/methodology/approach
A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.
Findings
The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.
Originality/value
Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.
Details
Keywords
Mohamed Saad Bajjou and Anas Chafi
Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…
Abstract
Purpose
Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.
Design/methodology/approach
This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.
Findings
This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.
Originality/value
To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.
Details
Keywords
Jing An, Suicheng Li and Xiao Ping Wu
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…
Abstract
Purpose
Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.
Design/methodology/approach
It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.
Findings
The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.
Originality/value
The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.
Details
Keywords
Matti Haverila and Jenny Carita Twyford
Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to…
Abstract
Purpose
Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.
Design/methodology/approach
A survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.
Findings
The results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.
Originality/value
Previous research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.
Details
Keywords
Pouya Amies, Xiaohua Jin and Sepani Senaratne
Dam industry projects have significant economic, social and environmental impacts. However, very little has been carried out to improve their lifecycle performance. The purpose of…
Abstract
Purpose
Dam industry projects have significant economic, social and environmental impacts. However, very little has been carried out to improve their lifecycle performance. The purpose of this study is to identify success criteria applicable to different stages of such projects.
Design/methodology/approach
This study adopted a quantitative research design where the potential success criteria for dam engineering projects were evaluated. The applicable success criteria were determined for the four phases of project lifecycle by three rounds of Delphi technique with the participation of experts from dams industry in Australia.
Findings
The findings of this research suggest that project success is a multidimensional notion and varies over lifecycle of projects. This study on project success criteria shows that certain criteria can be applied to measure success in different phases over lifecycle of Australian dam industry projects.
Originality/value
The results of this research present the first exclusive quantitative assessment of success criteria for dams industry. The success criteria presented in this study enable project practitioners to measure success at various stages of dam industry projects. This can serve as a tool to put more management efforts into achieving success on those criteria.
Details
Keywords
Te Wu, Huy Will Nguyen, Young Hoon Jung and Isabelle Yi Ren
Organizations have always faced the possibility of disruptions. Traditional approaches, such as shifting risks through insurance or improving organizational resiliency, view…
Abstract
Purpose
Organizations have always faced the possibility of disruptions. Traditional approaches, such as shifting risks through insurance or improving organizational resiliency, view disruptions as threats. This study aims to propose a new perspective where disruptions can also be opportunities. By adopting project portfolio management (PPM), organizations can develop proactive capabilities to manage uncertainty and prepare to exploit future disruptions.
Design/methodology/approach
Drawing on publicly available research reports, company reports, professional standards and press reports, this study describes key features of PPM and provides detailed practical guidance on how to apply PPM in daily operations, especially in preparation for the next disruption.
Findings
The key steps in applying PPM in daily operations are: align portfolios and projects with strategic goals and objectives; establish a robust governance framework; optimize resource capability and capacity; build and implement appropriate implementation methodologies; continuously monitor, review and optimize the project portfolio; and develop a culture that embraces risks, innovation and adaptability.
Research limitations/implications
This research has several limitations and implications. On limitations, the study was constrained by publicly available data, an in-depth interview with a consulting firm and a survey based on convenient sampling. These limitations will impact the generalizability of the findings. On implications, this paper shows how organizations can prepare for future disruptions by applying PPM. There are other ways to prepare for the unpredictable future, and further research is needed to explore other methods.
Practical implications
The results of this study have important practical implications for all organizations and in all sectors. Major disruptions are matters of “when,” not “how,” and responsible organizations need to pay attention. Based on the PPM discipline, this research provides an approach for business executives and project management practitioners to tackle this challenge. Furthermore, portfolio managers should use this information to promote and advocate for more disciplined planning to confront the uncertain future.
Social implications
The findings of this paper carry important social implications. As the recent events showed the vastness of disruptions, from extreme heat to fires in Maui, sitting idly and waiting passively for an unpredictable future is not an option. This paper advocates the need for more awareness and preparation for future disruption by applying PPM. Furthermore, this research provides concrete guidelines for organizations and practitioners to consider as they confront the unknown. Additional research should investigate other effective strategies to meet the challenges of an uncertain and volatile future.
Originality/value
This study offers practical steps on how organizations may manage not only to survive but also to thrive in an uncertain and volatile world.
Details