Search results

1 – 10 of over 1000
Article
Publication date: 8 December 2022

De-Graft Owusu-Manu, Emmanuel Ofori-Yeboah, Edward Badu, Augustine Senanu Komla Kukah and David John Edwards

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Abstract

Purpose

This study aims to investigate the effects of moral hazard on quality and satisfaction of public–private–partnership (PPP) construction projects in Ghana.

Design/methodology/approach

After undertaking a literature review, questionnaires were used to elicit responses from respondents. Population consisted of quantity surveyors, project managers, procurement officers, consultants, public agency officers involved in PPP projects, private partners and contractors. A total of 211 questionnaires were received from 250 distributed. Purposive and snowballing sampling techniques were adopted. Analytical tools were Cronbach’s alpha for testing reliability, regression, mean score ranking and relative importance index.

Findings

Reduced mutual trust and respect, poor clarity of project objectives; consequence on decision-making; less effective construction process; and increased construction risks were the significant effects of moral hazard on satisfaction of PPP construction projects. Value-based effects; manufacturer-based effects; product-based effects; user-based effects; and transcendent-based effects were the significant effects of moral hazard on quality of PPP construction projects.

Practical implications

Construction stakeholders involved in delivering PPP projects ought to take note of the findings and recommendations arising. Further studies should explore the effects on other project performance indicators apart from satisfaction and quality.

Originality/value

This paper extends knowledge in the area of exploring the effects of moral hazard on PPP project satisfaction and quality. The findings are beneficial to both academia and industry practitioners.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 15 March 2024

Huimin Li, Boxin Dai, Yongchao Cao, Limin Su and Feng Li

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of…

26

Abstract

Purpose

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of losses or increased transaction costs caused by opportunistic behavior in a soft environment where trust asymmetry is quite common and difficult to avoid.

Design/methodology/approach

This study focuses on examining asymmetric trust between the government and the private sector in public-private partnership (PPP) projects. Drawing upon both project realities and relevant literature, the primary conditional variables influencing asymmetric trust are identified. These variables encompass power perception asymmetry, information asymmetry, interaction behavior, risk perception differences and government-side control. Subsequently, through the use of a survey questionnaire, binary-matched data from both the government and the private sector are collected. The study employs fuzzy-set qualitative comparative analysis (fsQCA) to conduct a configurational analysis, aiming to investigate the causal pathways that trigger asymmetric trust.

Findings

No single conditional variable is a necessary condition for the emergence of trust asymmetry. The pathways leading to a high degree of trust asymmetry can be categorized into two types: those dominated by power perception and those involving a combination of multiple factors. Differences in power perception play a crucial role in the occurrence of high trust asymmetry, yet the influence of other conditional variables in triggering trust asymmetry should not be overlooked.

Originality/value

The findings can contribute to advancing the study of trust relationships in the field of Chinese PPP projects. Furthermore, they hold practical value in facilitating the enhancement of trust relationships between the government and the private sector.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 24 May 2023

Mohammad Daradkeh

Effective management of risk and knowledge is critical to ensure the success of industry–university collaboration (IUC) projects. However, the intricate dynamics through which…

Abstract

Purpose

Effective management of risk and knowledge is critical to ensure the success of industry–university collaboration (IUC) projects. However, the intricate dynamics through which these factors influence the performance of IUC projects have yet to be fully investigated. The purpose of this study is to explore the interplay between risk management and knowledge management capabilities and their impact on IUC project performance.

Design/methodology/approach

A model was constructed and evaluated through the examination of a sample of 188 collaborative innovation projects located in the United Arab Emirates (UAE), utilizing structural equation models (SEM) and hierarchical regression analysis.

Findings

The findings indicate that social system risk, technical system risk and project management risk have a negative impact on the performance of university–industry collaboration (UIC) projects, while cultural, technical and structural knowledge management capabilities can mitigate the negative impact of these risks on the performance of IUC projects.

Practical implications

The study concludes with three recommendations aimed at improving the management of UIC projects, including the establishment of a distinct and precise management strategy, the deployment of a comprehensive and systematized management methodology and the adoption of a balanced management framework.

Originality/value

The originality and value of this study lie in its exploration of the interplay between risk management and knowledge management capabilities in IUC projects. While previous studies have examined either risk management or knowledge management in IUC projects separately, this study provides a comprehensive analysis of both factors and their combined impact on project performance. The study also contributes to the literature by highlighting the specific risks and knowledge management capabilities that are most relevant to the context of IUC projects in the UAE. The practical recommendations offered by the study can help project managers and stakeholders to improve the success of collaborative innovation projects.

Details

Journal of Organizational Effectiveness: People and Performance, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2051-6614

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2023

G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…

169

Abstract

Purpose

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.

Design/methodology/approach

A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.

Findings

This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.

Practical implications

FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.

Originality/value

FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Ruman Thapa, Niranjan Devkota, Krishna Dhakal, Vaibhav Puri, Surendra Mahato and Udaya Raj Paudel

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles…

45

Abstract

Purpose

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles, including bureaucratic impediments, red-tapism, prolonged authorization protocols and insufficient inter-agency collaboration which result in project timeline extension, cost escalation and applicant dissatisfaction. Therefore, this study aims to examine customer satisfaction with the assessment of building construction permit certificates in Lalitpur, Nepal.

Design/methodology/approach

Following the notion of evaluation model theory, this study adopts an explanatory research design to determine the causal relationship between latent and observed variables. People who have recently completed the construction of their building and those people whose construction work is pending make up the population for the study. A total of 198 samples were collected by following the convenience sampling method from Lalitpur, Nepal. The primary data are collected by using the structured questionnaire with the interview process where the data are statistically evaluated using descriptive and inferential analysis using the KOBO toolbox, SPSS and AMOS. The connection between variables was examined using structural equation modeling (SEM).

Findings

Results indicate that the negligence of the employees, the attitude of the employees, the need for additional costs and the hiring of the agent are the most significant obstacles encountered by customers during the process of getting construction permit. Regarding the whole assessment system, the general population expresses displeasure. SEM results indicate that environment and quality are significantly related to customer satisfaction.

Originality/value

This paper's novelty lies in its Nepal-specific inquiry into the relationship between building permit acquisition procedures and customer contentment. The study provides a distinctive viewpoint on this context by combining evaluation model theory and SEM. The localized approach emphasizes the importance of customized strategies to improve customer satisfaction, adding to the current literature on the subject. The study's use of SEM as a quantitative analysis tool enhances its methodological rigor. This interdisciplinary research offers valuable insights for academics, practitioners and policymakers in Nepal and contributes to the wider field of construction and customer satisfaction.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Article
Publication date: 9 September 2022

Innocent Chigozie Osuizugbo and Olumide Afolarin Adenuga

This study aimed at determining the decisive factors for achieving sustainable procurement in construction projects.

Abstract

Purpose

This study aimed at determining the decisive factors for achieving sustainable procurement in construction projects.

Design/methodology/approach

Questionnaire survey of principal stakeholders involved in construction project delivery within client, consulting and contracting organisations in Nigeria were conducted to assess stakeholders' perspectives on the decisive factors for achieving sustainable procurement in construction projects using importance weights. A total of 243 questionnaires were distributed and a response rate of 51% (123 questionnaires were adequately filled and returned) was achieved. Descriptive and inferential statistics were utilised in analysing elicited data.

Findings

The results from data analysis showed that “satisfaction – including workforce satisfaction and user satisfaction”, “value for money” and “creating a healthy, nontoxic environment – including high indoor air quality” were the top most three decisive factors for achieving sustainable procurement in construction projects in Nigeria.

Originality/value

An understanding of these decisive factors can help principal stakeholders in the construction industry of developing countries to facilitate the development of methods required in supporting the adoption of sustainable procurement practice.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 19 June 2023

Mershack Opoku Tetteh, Albert P.C. Chan, Amos Darko, Beliz Özorhon and Emmanuel Adinyira

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance…

Abstract

Purpose

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance benchmark is established. However, existing studies fall short of adequately providing a mutually acceptable benchmark for assessing the performance of ICJVs. This study aims to develop an adequate and suitable performance measurement framework for ICJVs.

Design/methodology/approach

A twofold structured questionnaire survey, supplemented by semi-structured interviews, was used to collect data from the practitioners of ICJVs hosted in the developing country of Ghana. The data were analyzed by using descriptive statistics, confirmatory factor analysis (CFA) and a hybrid-fuzzy logic approach.

Findings

A list of 30 performance indicators (PIs), defined by project performance, perceived satisfaction, company/partner performance, socio-environmental performance and performance of ICJV management, was validated and proved to be significant. Only 22 out of the 30 PIs, focusing on project efficiency, societal improvement and organizational goals are realized by the ICJV practitioners. Further, suitable determinants and viable quantitative ranges for measuring each PI are established to prevent different interpretations of the meanings of PIs and objectively express the level of success in quantitative terms. The results call for further investigation of the convergence between the practice of and research into some PIs (e.g. socio-environmental performance) and a range of different performance levels (PLs) in a more scientific manner.

Practical implications

This study not only advances the knowledge base and practice of performance measurement in ICJVs but could also assist stakeholders and decision-makers to assess, compare and monitor the performance of different ICJV projects on common grounds objectively.

Originality/value

This study not only comprehensively assessed PIs – what to measure – but also systematically determined suitable determinants – how to measure – for each PI.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 April 2024

Rob Elkington, Robyn Ruttenberg-Rozen and Nadia Worthington

This paper aims to explore virtual simulations, merging artificial intelligence with real-world simulations, supporting Canadian armed forces (CAF) junior military leaders (JMLs…

99

Abstract

Purpose

This paper aims to explore virtual simulations, merging artificial intelligence with real-world simulations, supporting Canadian armed forces (CAF) junior military leaders (JMLs) leadership development. Our research questions are: (1) How do virtual simulations support CAF junior military leadership development within a globalized and complex environment in the 21st century? (2) Could virtual simulations support a leadership culture change through efficacious “soft skills” training? In this paper, we explore the efficacy of virtual simulations for enhancing or developing leadership in JMLs in the CAF through a four-day pilot project with twenty JMLs (n = 20).

Design/methodology/approach

To assess the efficacy of virtual simulations for leadership development, we designed and studied a four-day leadership workshop for JMLs in the CAF using several virtual artificial intelligence leadership role-play simulations developed by McGraw Hill in their smart book textbook (Manning & Curtis, 2022) and several non-virtual in-class simulations for comparison. We selected four twenty to thirty-minute virtual role-play simulations that synergized with the in-person morning leadership workshop. We facilitated the three-hour leadership workshops and virtual/in-class simulations over four consecutive days. We emulated the ELESS model (De Freitas & Routledge, 2013) to assess soft and leadership skills.

Findings

The participants (JMLs) reported beneficial learning utility associated with the virtual simulations. Participants also expressed that further utility might be leveraged through virtual simulations incorporating greater complexity with multiple potential outcomes. They also suggested that leadership simulations designed around military situations would prove highly beneficial, something that was outside of the scope of this small pilot project.

Research limitations/implications

Since this phase of our research is a pilot project, we secured a small amount of funding to test our hypothesis that simulations enhance leadership development for JMLs. These funding limitations resulted in several constraints in the research, such as the availability of virtual simulations articulating leadership from a military perspective. However, we believed the assigned organizational leadership simulations in the McGraw Hill Smart Book ecosystem would approximate generic leadership situations enough to test the hypothesis with the JMLs. As a pilot project, our sample size was relatively small (n = 20 JMLs) since participation was voluntary amidst a busy spring season for the JMLs. Since this is a pilot project, we suggest that twenty JMLs are an adequate sampling to test the hypothesis that simulations enhance JML leadership development. We will expand the sample size in the next phase of our research as we work with the CAF to expand the pool of participants to at least forty JML participants (n = 40). We also plan to secure further funding to collaborate with subject matter experts to design virtual simulations based on Canadian military leadership scenarios.

Practical implications

The CAF host robust simulations capabilities for combat training, but have not exploited the potential training and analytical capacity of virtual leadership simulations for leadership development within the CAF. We believe that virtual simulations provide an opportunity for the CAF to effect desired culture change through leadership development that leverages the substantial pedagogical benefits of simulations.

Social implications

The CAF encountered several detrimental leadership scandals that eroded the reputational capital of the CAF. In the current geo-political climate of an expanding North American Treaty Organization (NATO) and threats from several international actors, the CAF seeks to expand its capabilities by adding and enhancing its human capital. However, the CAF currently experiences a significant gap in its human capital aspirations. There is a unanimous consensus that the endemic traditional culture of the CAF, as expressed in the recent explosive leadership scandals, is a deterrent to recruitment and thus weakens the CAF’s capability. The CAF targets leadership development with new leadership paradigms as pivotal to culture change. The CAF suggests that by enhancing leadership development in the CAF the new cadre of leadership will change the culture of the CAF and thereby enhance the reputational capital of the CAF. It is believed that this rejuvenated culture will lead to greater recruitment and retention, leading to a strengthened military. A strengthened military is important to provide effective support and protection for the Canadian people in these volatile and uncertain times. This expanded capacity will enable the CAF to address external military threats more effectively and also the increasing operations other than war (OOTW), such as the military support of long-term care facilities during COVID-19 or the military’s support in fighting record wildfires and the military’s support in climate change related disasters such as flooding.

Originality/value

The satisfaction measures indicated by the participants are typical evaluative measures of leadership development (Noe, 2023). These satisfaction ratings do not, however, indicate whether training has produced a change in behaviour (Brown, 2022). The implications of these outcomes for leadership education are that role-player simulations are useful leadership education and development tools because they provide a theatre of practice in which mistakes are not detrimental and serve as learning moments (Moore, 2012; Piro and O’Callaghan, 2021; Riotto, 2021). Further, the importance of role-player simulations that closely approximate the sector where leadership is experienced and practiced is perceived to enhance the experience. While the CAF invest in combat related simulations, but leadership development simulations are not as evident in the training and development array. This study seeks to assess their potential value as a leadership development tool within the wider context of character development as a leadership competency.

Details

Journal of Leadership Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1552-9045

Keywords

Article
Publication date: 14 April 2023

Shenghua Yan and Weigong Chen

The core of the successful implementation of the integrated project delivery (IPD) mode is to establish a high-quality relationship of cooperation, trust and sharing among…

Abstract

Purpose

The core of the successful implementation of the integrated project delivery (IPD) mode is to establish a high-quality relationship of cooperation, trust and sharing among participants. This paper proposes recommendations to improve the relationship quality of participants from the owner's perspective. The results provide the theoretical basis and practical guidance for the popularization and application of the IPD mode.

Design/methodology/approach

This paper analyzes the dynamic relationship among participants in IPD mode based on supply chain theory and similarity theory. A tripartite game model of the owner, designer and the contractor is constructed to obtain the evolutionary equilibrium strategies under different parameter constraints. Then, numerical simulations under various scenarios are conducted to explore the dynamic evolution and the influencing factors of the relationship quality among the participant in the IPD mode.

Findings

The results show that (1) the relationship quality under certain conditions gradually improves as the project progresses until stable and high-quality cooperation is formed and (2) the owner's positive supervision cost, the distribution coefficient of incentive and punishment of participants and the scale of incentive pool are important factors influencing the relationship quality.

Originality/value

This study incorporates the following three innovations. First, analyzing the relationship quality among the participants of IPD mode based on supply chain theory. Second, the evolutionary game theory is applied to the relationship quality analysis. Third, conclusion innovation. The authors conclude that the relationship quality may progress, decrease or cycle with the progress of the project and targeted recommendations are presented based on the results.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

1 – 10 of over 1000