Article
Publication date: 4 August 2022

Cong Liu, Jiming Cao, Kaifeng Duan and Guangdong Wu

This study investigates the impact of network positions on inter-team conflicts and project success in megaprojects.

Abstract

Purpose

This study investigates the impact of network positions on inter-team conflicts and project success in megaprojects.

Design/methodology/approach

Network position is measured with centrality and structural holes. Substantive conflict and affective conflict reflect inter-team conflicts. A questionnaire survey was implemented in Chinese megaprojects, and 309 valid questionnaires were collected. The data were analyzed using structural equation modeling and bootstrapping methods.

Findings

The results show that centrality negatively impacts project success, while the presence of a team in a structural hole has no significant impact on project success. Centrality is negatively related to substantive conflict and is positively related to affective conflict. The team in a structural hole has a positive effect on substantive conflict and a negative effect on affective conflict. Substantive conflict and affective conflict have positive and negative effects on project success, respectively. The effect of network position on project success is mediated by inter-team conflict.

Research limitations/implications

This research provides a reference for megaproject managers to better conduct network governance, manage inter-team conflict, and successfully manage projects. The study did not investigate the effects of changes in teams' network positions on project success. Future research should explore this facet of megaprojects.

Originality/value

This research adds to existing research on network position, and reveals that project network governance is important for megaproject success. This provides a new direction for megaproject management. Furthermore, the results validate constructive and non-constructive roles and the mediating role of inter-team conflict. This complements the literature on conflict management, providing a reference for megaproject managers when managing inter-team conflict.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 March 2024

Hisham Said, Aswathy Rajagopalan and Daniel M. Hall

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT…

Abstract

Purpose

Cross-laminated timber (CLT) is an innovative construction material that provides a balanced mix of structural stiffness, fabrication flexibility and sustainability. CLT development and innovation diffusion require close collaborations between its supply chain architectural, engineering, construction and manufacturing (AECM) stakeholders. As such, the purpose of this study is to provide a preliminary understanding of the knowledge diffusion and innovation process of CLT construction.

Design/methodology/approach

The study implemented a longitudinal social network analysis of the AECM companies involved in 100 CLT projects in the UK. The project data were acquired from an industry publication and decoded in the form of a multimode project-company network, which was projected into a single-mode company collaborative network. This complete network was filtered into a four-phase network to allow the longitudinal analysis of the CLT collaborations over time. A set of network and node social network analysis metrics was used to characterize the topology patters of the network and the centrality of the companies.

Findings

The study highlighted the scale-free structure of the CLT collaborative network that depends on the influential hubs of timber manufacturers, engineers and contractors to accelerate the innovation diffusion. However, such CLT supply collaborative network structure is more vulnerable to disruptions due to its dependence on these few prominent hubs. Also, the industry collaborative network’s decreased modularity confirms the maturity of the CLT technology and the formation of cohesive clusters of innovation partners. The macro analysis approach of the study highlighted the critical role of supply chain upstream stakeholders due to their higher centralities in the collaborative network. Stronger collaborations were found between the supply chain upstream stakeholders (timber manufacturers) and downstream stakeholders (architects and main contractors).

Originality/value

The study contributes to the field of industrialized and CLT construction by characterizing the collaborative networks between CLT supply chain stakeholders that are critical to propose governmental policies and industry initiatives to advance this sustainable construction material.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 May 2023

Welington Norberto Carneiro, Jose Carlos Tiomatsu Oyadomari, Paulo Afonso, Ronaldo Gomes Dultra-de-Lima and Octavio Ribeiro de Mendonça Neto

This paper seeks to understand kaizen in practice as it travels through time and space in the organisational setting.

Abstract

Purpose

This paper seeks to understand kaizen in practice as it travels through time and space in the organisational setting.

Design/methodology/approach

A qualitative case study was carried out at a multinational company using mainly interviews for the data collection that were analysed from an actor-network theory (ANT) perspective.

Findings

This paper finds that the company deals with a series of paradoxes while managing the kaizen process. Efficiency and quality paradoxes are the basis for starting kaizen projects. Furthermore, intrinsic, and extrinsic motivation, emerge in these processes, and paradoxes relate to how spontaneous ideas emerge in a deliberated context of cost-saving objectives. The supply chain finance team coordinates kaizen projects with the collaboration of plant managers, promoting the paradox of autonomy and control. In addition, as kaizen mobilises and enrols the actors, some trials of strength emerge, showing actors who oppose the kaizen network and create competing networks that mutually exist in the firm.

Practical implications

This study presents valuable insights for professionals to successfully implement kaizen methodologies that take advantage of developing a network for problem-solving in organizations.

Originality/value

This study highlights the supply chain finance team's role in enrolling the actors within a network built by practitioners engaged in kaizen projects. Usually, engineers, quality, or manufacturing teams lead kaizen projects, and only occasionally, accounting and financial teams participate, including multidisciplinary teams.

Details

Benchmarking: An International Journal, vol. 31 no. 3
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2024

Mahmud Akhter Shareef, Yogesh K. Dwivedi, Md. Shazzad Hosain, Mihalis Giannakis and Jashim Uddin Ahmed

This study has conducted exploratory research to understand who should comprise the members of a resilient supply chain for promoting an entrepreneurial ecosystem of a startup…

Abstract

Purpose

This study has conducted exploratory research to understand who should comprise the members of a resilient supply chain for promoting an entrepreneurial ecosystem of a startup project and to determine the mechanisms for the balanced coexistence of all stakeholders. This is necessary to ensure mutual benefits for all stakeholders, each of whom has multidimensional interests. Additionally, this supply chain must be able to withstand any potential disruption risks.

Design/methodology/approach

This research has employed a mixed-design approach. In this context, the study conducted an extensive qualitative and quantitative investigation, including 30 interviews and a survey involving 180 potential stakeholders in this supply network, respectively in the capital city of Bangladesh, Dhaka. The analysis of the interviews utilized principles of matrix thinking, while structural equation modeling (SEM) through LISREL was employed to understand cause-and-effect relationships.

Findings

Network, platform and governance—these three independent constructs have the potential to contribute to the dependent construct, a resilient supply chain, aimed at promoting an entrepreneurial ecosystem for startup projects. It has been revealed that the management of such projects depends on the rules and regulations within the ecosystem. An excellent governance mechanism is essential for this purpose. To facilitate coexistence, the establishment of a platform is crucial, where cooperation among all members is mandatory.

Practical implications

For practitioners, three distinctive but closely interdependent issues are explored and resolved in this philanthropic study. It has unfolded the elements of any startup project with essential settings.

Originality/value

The identification of the structural dynamics of potential stakeholders within the entrepreneurial ecosystem of startups is largely absent in existing literature. Therefore, there is a need to comprehensively investigate the entire network, including their roles, responsibilities and associations. This study makes a significant and novel contribution to the existing literature. Academics and practitioners alike have ample opportunities to learn from this new aspect of relationships across three distinct areas: the entrepreneurial ecosystem, startup projects and the development of a resilient supply chain.

Details

International Journal of Entrepreneurial Behavior & Research, vol. 30 no. 5
Type: Research Article
ISSN: 1355-2554

Keywords

Article
Publication date: 29 January 2024

Libiao Bai, Xiaoyan Xie, Yichen Sun, Xue Qu and Xiao Han

Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased…

Abstract

Purpose

Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased diversity in approaches, the understanding of vulnerable project impacts is still limited. To promote a better understanding of assessing project criticality, a vulnerability measurement model is constructed.

Design/methodology/approach

First, integrating the tasks, projects and corresponding relationships among them, a project portfolio network (PPN) is constructed. Second, the project's vulnerability is measured by combining the topological structure and functional attributes. Third, project criticality is assessed by the vulnerability measurement results. Lastly, the proposed model is applied in a numerical example to illustrate its suitability and effectiveness.

Findings

For academia, this study provides a novel perspective on project vulnerability measurement and expands project criticality assessment tools. For practitioners, the straightforward model provides an effective tool for assessing project criticality and contributes to enhancing project portfolio management (PPM).

Originality/value

The impact of the task on the project is considered in this study. Topological structure and functional attributes are also integrated for measuring project vulnerability due to the impact of random attacks in an uncertain environment, providing a new perspective on the requirements of project criticality assessment and the measurement of project vulnerability.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 August 2023

Mohamad Tannir, Grant Mills, Ilias Krystallis and Jas Kalra

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and…

Abstract

Purpose

This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and coordination in inter-organisational projects (IOPs) on sub-system and project levels.

Design/methodology/approach

The authors use the Viable Systems Model as a framework to analyse inter-organisational project governance, cooperation and coordination by adopting a multiple-case study.

Findings

The findings illustrate how governance and coordination mechanisms exhibit a filter-down effect on lower sub-systems while cooperation influence is confined within each sub-system. While remarking the importance of specific sub-systems on the overall project performance, the interplay of governance, cooperation and coordination across sub-systems appears to be complex, with governance influencing cooperation and coordination, whereas cooperation and coordination influence each other with an incremental effect.

Originality/value

This study defines two propositions that explain how multiple levels of analysis (project and sub-systems) can support the governance of large inter-organisational projects. The authors elaborate theory on the interplay of inter-organisational project governance, cooperation and coordination.

Details

International Journal of Operations & Production Management, vol. 44 no. 3
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 27 June 2023

Nirodha Fernando, Kasun Dilshan T.A. and Hexin (Johnson) Zhang

The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial…

Abstract

Purpose

The Government’s investment in infrastructure projects is considerably high, especially in bridge construction projects. Government authorities must establish an initial forecasted budget to have transparency in transactions. Early cost estimating is challenging for Quantity Surveyors due to incomplete project details at the initial stage and the unavailability of standard cost estimating techniques for bridge projects. To mitigate the difficulties in the traditional preliminary cost estimating methods, there is a requirement to develop a new initial cost estimating model which is accurate, user friendly and straightforward. The research was carried out in Sri Lanka, and this paper aims to develop the artificial neural network (ANN) model for an early cost estimate of concrete bridge systems.

Design/methodology/approach

The construction cost data of 30 concrete bridge projects which are in Sri Lanka constructed within the past ten years were trained and tested to develop an ANN cost model. Backpropagation technique was used to identify the number of hidden layers, iteration and momentum for optimum neural network architectures.

Findings

An ANN cost model was developed, furnishing the best result since it succeeded with around 90% validation accuracy. It created a cost estimation model for the public sector as an accurate, heuristic, flexible and efficient technique.

Originality/value

The research contributes to the current body of knowledge by providing the most accurate early-stage cost estimate for the concrete bridge systems in Sri Lanka. In addition, the research findings would be helpful for stakeholders and policymakers to propose policy recommendations that positively influence the prediction of the most accurate cost estimate for concrete bridge construction projects in Sri Lanka and other developing countries.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords