Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended…

Downloads
1827

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

To view the access options for this content please click here
Article
Publication date: 5 November 2019

Mohammad Javad Ershadi, Reza Edrisabadi and Aghileh Shakouri

Project management generally covers many important areas such as cost, quality and time in different industrial settings, but it is deficient in relation to integration of…

Abstract

Purpose

Project management generally covers many important areas such as cost, quality and time in different industrial settings, but it is deficient in relation to integration of health, safety and environmental risks. Poor knowledge of project managers about HSE management necessitates the studying on the mutual effects of HSE and project management. Hence, investigating the impact of project management on health monitoring programs, safety prevention monitoring, environmental monitoring plans and finally the effectiveness of professional health monitoring programs and determining their importance are main objectives of this research. The paper aims to discuss these issues.

Design/methodology/approach

A model based on structural equations was designed and developed. The constructs of this model are project management, health monitoring and safety prevention monitoring program. Based on the conceptual model, some questionnaires were prepared and distributed among the experts of strategic project management.

Findings

The results of applied structural modeling suggest that project management focuses on each aspect of HSE management, including health monitoring programs, safety prevention monitoring programs, environmental monitoring plans and effectiveness of professional health monitoring programs. HSE management can also be strengthened by empowering project management. Checking fire protection systems, using appropriate techniques to identify contamination and disposal of waste and incorporating techniques for brainstorming or other ideas creation in the group are the most important tasks in HSE-enabled project management frameworks.

Originality/value

Since there is still no strategic alignment model that includes components of project management and HSE management, a model for achieving this goal is vital. This paper elaborates this alignment based on literature and using a field study.

Details

Built Environment Project and Asset Management, vol. 10 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

To view the access options for this content please click here
Article
Publication date: 1 May 1997

Seow‐Eng Ong

Proposes a reputation‐based model to examine the managerial investment and liquidation decisions regarding real estate projects in developing countries. Unlike investments…

Downloads
2412

Abstract

Proposes a reputation‐based model to examine the managerial investment and liquidation decisions regarding real estate projects in developing countries. Unlike investments in domestic projects, foreign investments are subject to noisy monitoring, resulting in a liquidation inefficiency where managers preserve their reputational capital by not liquidating projects likely to fail as long as negative signals are not revealed to the public. The manager’s decision to invest in foreign countries is influenced not only by the difference between foreign and domestic project returns, but also by the change in reputational capital. Shows that reputation‐based utility maximization can lead to an under‐investment in profitable foreign projects. Government support to invest in foreign countries can reduce the under‐investment problem, but it can also increase the liquidation inefficiency.

Details

Journal of Property Valuation and Investment, vol. 15 no. 2
Type: Research Article
ISSN: 0960-2712

Keywords

To view the access options for this content please click here
Book part
Publication date: 22 July 2014

Abby Kinchy, Kirk Jalbert and Jessica Lyons

This paper responds to recent calls for deeper scrutiny of the institutional contexts of citizen science. In the last few years, at least two dozen civil society…

Abstract

This paper responds to recent calls for deeper scrutiny of the institutional contexts of citizen science. In the last few years, at least two dozen civil society organizations in New York and Pennsylvania have begun monitoring the watershed impacts of unconventional natural gas drilling, also known as “fracking.” This study examines the institutional logics that inform these citizen monitoring efforts and probes how relationships with academic science and the regulatory state affect the practices of citizen scientists. We find that the diverse practices of the organizations in the participatory water monitoring field are guided by logics of consciousness-raising, environmental policing, and science. Organizations that initiate monitoring projects typically attempt to combine two or more of these logics as they develop new practices in response to macro-level social and environmental changes. The dominant logic of the field remains unsettled, and many groups appear uncertain about whether and how their practices might have an influence. We conclude that the impacts of macro-level changes, such as the scientization of politics, the rise of neoliberal policy ideas, or even large-scale industrial transformations, are likely to be experienced in field-specific ways.

Details

Fields of Knowledge: Science, Politics and Publics in the Neoliberal Age
Type: Book
ISBN: 978-1-78350-668-2

To view the access options for this content please click here
Article
Publication date: 17 July 2019

Callistus Tengan, Clinton Ohis Aigbavboa, Francis Guribie and Joseph Annor-Asubonteng

This study aims to analyze the outcome features of effective monitoring and evaluation in construction projects delivery.

Abstract

Purpose

This study aims to analyze the outcome features of effective monitoring and evaluation in construction projects delivery.

Design/methodology/approach

The study adopted a quantitative research approach. Questionnaire survey was administered to 230 participants who were drawn from metropolitan, municipal, district assemblies and regional coordinating councils in Ghana. Data collected were analyzed to determine the key and underlying monitoring and evaluation outcome features in project delivery. A Cronbach’s α value of 0.953 was achieved based on standardized items, while the Kaiser–Meyer–Olkin measure of sampling adequacy recorded was 0.876. The result of Bartlett’s test of sphericity also revealed a significance level of 0.000 (p <0.05).

Findings

The study discovered that value for money, successful project closure, end-user satisfaction, timely completion of projects and fitness for purpose were the top five monitoring and evaluation outcome features. Similarly, three principal monitoring and evaluation outcome features were identified, namely, performance, satisfaction and value outcome.

Practical implications

The study, thus, seeks to guide project planning and implementation of effective construction project M&E.

Originality/value

The study contributes to the body of knowledge by establishing top and key success outcomes (KSO) in the implementation of monitoring and evaluation.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

To view the access options for this content please click here
Article
Publication date: 23 June 2021

Wesam Salah Alaloul, Khalid M. Alzubi, Ahmad B. Malkawi, Marsail Al Salaheen and Muhammad Ali Musarat

The unique nature of the construction sector makes it fall behind other sectors in terms of productivity. Monitoring construction productivity is crucial for the…

Abstract

Purpose

The unique nature of the construction sector makes it fall behind other sectors in terms of productivity. Monitoring construction productivity is crucial for the construction project's success. Current practices for construction productivity monitoring are time-consuming, manned and error prone. Although previous studies have been implemented toward reducing these limitations, a gap still exists in the automated monitoring of construction productivity.

Design/methodology/approach

This study aims to investigate and assess the different techniques used for monitoring productivity in building construction projects. Therefore, a mixed review methodology (bibliometric analysis and systematic review) was adopted. All the related publications were collected from different databases, which were further screened to get the most relevant based on the Preferred Reporting Items for Systematic Review and Meta-Analyses (PRISMA) criteria.

Findings

A detailed review was performed, and it was found that traditional methods, computer vision-based and photogrammetry are the most adopted data acquisition for productivity monitoring of building projects, respectively. Machine learning algorithms (ANN, SVM) and BIM were integrated with monitoring tools and technologies to enhance the automated monitoring performance in construction productivity. Also, it was observed that current studies did not cover all the complex construction job sites and they were applied based on a small sample of construction workers and machines separately.

Originality/value

This review paper contributes to the literature on construction management by providing insight into different productivity monitoring techniques.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

To view the access options for this content please click here
Article
Publication date: 1 January 2006

Nasina Jigeesh and M.S. Bhat

Project monitoring is one of the important activities in the management of a project and its main objective is to supply the necessary information for proper control of…

Abstract

Project monitoring is one of the important activities in the management of a project and its main objective is to supply the necessary information for proper control of the project based on the project plan. Monitoring of a project covers different issues related to costs, resources, problems, progress etc. All these issues are dependent on many other sub‐issues and any changes in any of them influences the whole project monitoring system. EArned value analysis is one of the tools used for monitoring the progress and costs of the project is composed of several factors. In the present work, the activity of project monitoring has been treated as a general system and earned value analysis as a specific system for modeling and simulating the dynamics involved therein. System dynamics methodology has been applied for this purpose. A case study has been conducted on a real‐world software project in an IT organization. The results show that the system of earned value analysis is highly influenced by the variations in the estimated cost of unit effort, delay in an activity and estimated effort of work package.

Details

Journal of Advances in Management Research, vol. 3 no. 1
Type: Research Article
ISSN: 0972-7981

Keywords

To view the access options for this content please click here
Article
Publication date: 30 September 2014

Kunal Vegad, Mangesh Madurwar and Rahul Ralegaonkar

The purpose of this paper is to report the results of a techno-economic feasibility study on the application of Audio Visual Enterprise Resource Planning (AV-ERP). Due to…

Abstract

Purpose

The purpose of this paper is to report the results of a techno-economic feasibility study on the application of Audio Visual Enterprise Resource Planning (AV-ERP). Due to rapid urbanisation and economic growth in developing countries (DCs) like India, there has been tremendous development in infrastructural projects. To maintain the quality and competitive commercial pricing of the projects, stakeholders are working together from different geographic locations. Due to lack of culture in adopting the technological advancements, the on-site construction activities lack coordination among the stakeholders.

Design/methodology/approach

In the present case, it is observed that the site and various stakeholders like consultants are physically monitoring and controlling the ongoing construction activity from different geographic locations. To manage the effective communication and information exchanges, an integrated tool for surveillance and AV-ERP is proposed in the present paper. These equipment and technologies play a very vital role in the construction industry, which, in turn, significantly affects the progress, cost and time of the project. The techno-economic feasibility of proposed AV-ERP system was evaluated for the ongoing township project over the study area.

Findings

For the considered case study, 75 per cent cost of the project overhead incurred for site monitoring can be saved by implementing the proposed technology of AV-ERP system.

Practical implications

The proposed AV-ERP system is a techno-economically viable solution for the effective project management.

Originality/value

In the DCs like India, to develop the culture for adopting the technological advancements (AV-ERP system) for monitoring the on-site construction activities, the presented case becomes an innovative solution for upcoming medium as well as large-scale construction projects.

Details

Construction Innovation, vol. 14 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

To view the access options for this content please click here
Article
Publication date: 2 January 2007

Tom McBride, Brian Henderson‐Sellers and Didar Zowghi

The paper seeks to investigate whether project managers regard software development projects as design problems or production problems.

Downloads
2535

Abstract

Purpose

The paper seeks to investigate whether project managers regard software development projects as design problems or production problems.

Design/methodology/approach

Project management literature was examined to determine what evidence there should be to indicate whether a software development project was regarded as a problem to be solved or a product to be produced. Data were then collected through structured interview of project managers currently engaged in managing software development projects. The data were analysed to determine how project managers regarded their projects and whether this matched a theoretical expectation.

Findings

The empirical data indicated that most project managers regard their projects as production problems, where it is assumed that the underlying problem is largely understood, the project encapsulated in a planned schedule of activities and there will be an emphasis on monitoring the project against the planned progress.

Research limitations/implications

Owing to the small sample size of fewer than 30 project managers, external validity is weak. More research is needed to confirm these results over a larger sample and to probe more subtle orientation to production or design projects.

Practical implications

The research developed a simple test to indicate the degree of novelty of the application to be developed. The test indicates whether the application is novel and should be treated as a design problem, or well known and therefore should be treated as a production problem.

Originality/value

The paper draws attention to the need for project managers to evaluate the type of application to be developed and to adopt an appropriate project management approach. The paper also provides a simple test to achieve that objective.

Details

Journal of Enterprise Information Management, vol. 20 no. 1
Type: Research Article
ISSN: 1741-0398

Keywords

To view the access options for this content please click here
Article
Publication date: 1 March 2004

V. Ahuja and V. Thiruvengadam

Project scheduling/rescheduling occurs in all stages of projects, from feasibility stage to monitoring stage to completion. Since the late 1950s, network‐based techniques…

Downloads
3680

Abstract

Project scheduling/rescheduling occurs in all stages of projects, from feasibility stage to monitoring stage to completion. Since the late 1950s, network‐based techniques CPM (critical path method) and PERT (programme evaluation review technique) are the techniques commonly used for project management. However, there are limitations in working with these tools that need to be overcome. Also, the computing ef. ciency of classic CPM/PERT analysis needs to be enhanced. Substantial research has been carried out globally in this field covering all areas of project scheduling: time scheduling, resource scheduling, cost scheduling, modern project management techniques, advanced mathematical models used for construction scheduling, and so on. To understand and document this research status, the authors have carried out an extensive study of various journals, published and unpublished research papers, and present this literature review.

Details

Construction Innovation, vol. 4 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords