Search results

1 – 10 of over 1000
Article
Publication date: 17 November 2023

Rebecca Kassa, Ibilola Ogundare, Brian Lines, Jake B. Smithwick, Nancy J. Kepple and Kenneth T. Sullivan

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially…

Abstract

Purpose

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially important given the current challenges in the construction workforce, including labor shortages, an aging workforce, generational differences in the workforce, supply chain disruptions and the need to effectively train staff in the skills that are essential in a constrained labor environment. To address these challenges, this study proposes a performance measurement strategy that construction companies can use as input to design their talent development programs.

Design/methodology/approach

The strategy intends to assess the performance of project managers and develop criteria that define categories of their performance, including the top performers' category. This enables construction organizations to provide each project manager with individualized training that addresses areas of weakness and in turn, develops the skills that correspond with being top performers. The proposed strategy was developed and tested by surveying the immediate supervisors of 187 project managers working for general and specialty contractors in the United States. Principal component analysis was used to develop a single performance construct from seven performance criteria.

Findings

This construct was used to organize the project managers into the categories of top, above-average and below-average performers. According to the findings, top-performing project managers have well-rounded skills in the areas of leadership, communication, technical proficiency and overall job knowledge.

Practical implications

The outcomes of this study can help construction organizations focus their talent-development programs on the skills most associated with PMs being top performers.

Originality/value

This study provides construction organizations with a comprehensive performance-measuring construct to focus their talent-development programs on the skills most associated with top-performing project managers. Researchers can use this study as a foundation for further understanding how performance is related to various construction professions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 27 November 2023

Junwei Zheng, Yu Gu, Peikai Li, Lan Luo and Guangdong Wu

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project…

Abstract

Purpose

The development of project managers and leadership has been highlighted as crucial for improving project success and performance, resulting in a rise of interest in project leadership research over the last two decades. While several qualitative reviews have been conducted, there have been limited quantitative and systematic reviews on project leadership. This study fills this gap by portraying the knowledge landscape and tracking the evolution of project leadership research from 1998 to 2022 through bibliometric approaches.

Design/methodology/approach

Based on 816 records, including 793 articles extracted and selected from the Web of Science database and specific journals, and 23 articles selected from three non-SCI/SSCI indexed journals, the authors used CiteSpace and bibliometrix R-package to depict visualizations of the trajectory of co-cited references, the landscape of co-occurred keywords and emerging trends in project leadership via reference co-citation analysis, keyword co-occurrence analysis and thematic mapping.

Findings

The bibliometric analyses enabled the authors to understand the conceptual aspects of project leadership and its theoretical background. Three stages of the intellectual bases were identified and tracked: the infancy phase (1998–2007), the growth phase (2008–2014) and the new development phase (2015–2022). The results of keyword co-occurrence analysis indicated that the research focus evolved from investigating traits and competences to examining the effects of traditional leadership behaviors, and then considering context-specific leadership. The findings of thematic mapping and theoretical interpretation illustrate the potential directions of the competence comparison, new and appropriate leadership, and the interaction between leadership and context.

Originality/value

This study advanced the field by providing a systematic review of project leadership, developing potential future directions for project leadership research and providing practical implications for career development and training.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 June 2023

Peipei Wang, Peter Fenn and Kun Wang

This paper aims to devise a case-controlled method combined with Bradford Hill criteria for causal inference of contractual disputes in construction projects. It is a genuine…

Abstract

Purpose

This paper aims to devise a case-controlled method combined with Bradford Hill criteria for causal inference of contractual disputes in construction projects. It is a genuine attempt in a systematic method from research design to execution for causal issues where only observational data is available.

Design/methodology/approach

The authors located insufficient top management support as the putative pathogen of construction disputes based on a literature review, an interview and Delphi surveys. A questionnaire survey was then conducted to collect case-controlled data to ensure comparability, in which for each disputed project put in the experimental group, the authors sought for a dispute-free project of similar characteristics. The incidence rates of insufficient top management support in the experimental and control groups were then examined by Bradford Hill criteria as an alternative to the test of intervention effect.

Findings

The association of insufficient top management support and construction disputes was tested to conform with the Bradford Hill criteria with case-controlled data where applicable and logical deduction where statistical tests were not applicable. With a clear, positive, reasonable and statistically significant association, while excluding methodological biases, confounding and chance, the authors reached a causal verdict of insufficient top management support causing contractual disputes.

Originality/value

This paper supports the validity of applying a case-controlled method combined with Bradford Hill criteria in investigating causal issues in project management, especially the verdict of causal inference based on empirical data. In addition, the located root cause of contractual disputes could inform project management personnel with reasoned strategies for dispute avoidance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 April 2022

Chigozie Collins Okafor, Ugochukwu Sydney Ani and Onuegbu Ugwu

Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible…

Abstract

Purpose

Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible corrective measures of CSCM are rare. This study sets out to bridge this gap by identifying and evaluating the most effective CSCM corrective measures that will benefit the global construction industry.

Design/methodology/approach

A methodology was designed to obtain the corrective measures of CSCM. Data were collected from 68 experts who served as research participants in this study, through a questionnaire survey and were analyzed statistically using the severity index analysis, Mann–Whitney test and factor analysis which includes KMO and Barlett's test, commonalities, total variance pattern matrix.

Findings

The findings of the study revealed that free exchange of information between parties from both suppliers and site/firm is the best CSCM corrective measures, according to the research participant's opinion using the severity index analysis. Further analysis revealed seven underlying factors of CSCM corrective measures.

Practical implications

The findings of this study have identified the most critical solutions to the lapses of CSCM. These will serve as adequate corrective measures to the challenges of CSCM and benefit the global construction industry.

Originality/value

This study contributed seven underlying factors of CSCM corrective measures which can be adopted as adequate corrective measures to the lapses of CSCM. The study further contributed to CSCM research theory.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 July 2023

Si Yee Tiew, Helena Aman Hashim and Umi Kalsum Zolkafli @ Zulkifly

Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the…

Abstract

Purpose

Various studies have been conducted to explore the factors that are important to be considered for the effectiveness of construction contract administration (CCA) but lack in the context of graduate architects. The purpose of this study is to identify factors influencing the effectiveness of graduate architects in CCA and possible methods to enhance their work efficiency through developing the relevant skills in a changing construction environment.

Design/methodology/approach

This paper identified the factors that influence the effectiveness of graduate architects in CCA through the quantitative methods. General skill elements that are perceived as essential for the effectiveness of CCA had been investigated through a survey of graduate architects in the construction industry. One hundred and twenty-seven completed questionnaires returned were analyzed and tested using descriptive analysis and relative important index (RII).

Findings

The result from the study showed that the factors influencing the effectiveness of graduate architects as CCA are building construction skills, design management skills, project management skills, soft skills and dispute resolution skills.

Originality/value

The contribution of this study can be utilized for developing models/tools in the future that would improve the work performance of graduate architects in CCA. Educators may utilize this study to improve their syllabus to cater to the market's demand and facilitate students' entry into the labor market.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 July 2023

Aziz Yousif Shaikh, Robert Osei- kyei, Mary Hardie and Matt Stevens

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to…

Abstract

Purpose

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.

Design/methodology/approach

This study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.

Findings

According to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.

Practical implications

The results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.

Originality/value

A list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of over 1000