Article
Publication date: 20 February 2020

Jingfeng Yuan, Xuewei Li, Yongjian Ke, Wei Xu, Zhao Xu and M. Skibnewski

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth…

1016

Abstract

Purpose

Effective performance management (PM) in public–private partnership (PPP) projects is critical to realizing value for money (VFM). This study aims to provide an in-depth understanding of problems existing in PPP PM and possible avenues for improvement, presenting an experimental system to verify that building information modeling (BIM) and other information communication technologies can improve PPP PM.

Design/methodology/approach

The mixed research method adopted in this study combined empirical research with experimental research. Semistructured interviews were used to ascertain the current situation of PPP PM with the help of Nvivo software. A BIM-based performance management system (BPMS), which combines BIM with Web and Cloud technology, was then constructed to achieve performance monitoring, performance measurement, and performance-based payment. Finally, a case study was introduced to explain the function application of the proposed system.

Findings

The case demonstration verified is found to verify that the developed BIM-based execution framework for PPP PM can effectively guide stakeholders toward achieving mixed PM, promote effective PM, and improve work efficiency with the support of BIM and other information and communication technologies.

Originality/value

Through the development of a BPMS for PPP projects, the effectiveness and efficiency of PM are improved. Practical PM applications are also provided to different stakeholders, through which the key performance indicators and the behaviors of the government and private-sector partners can be monitored to form a more comprehensive and reasonable PM mechanism and promote the realization of VFM in PPP projects.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2017

John M. Kamara

The purpose of this paper is to explore the contribution of the design quality indicator (DQI) tool in the management of client requirements in construction projects, and propose…

Abstract

Purpose

The purpose of this paper is to explore the contribution of the design quality indicator (DQI) tool in the management of client requirements in construction projects, and propose a requirements-oriented project process (ROPP) to ensure continued focus on client requirements throughout the lifecycle of a project.

Design/methodology/approach

Direct participant involvement and case studies of building projects that have used the DQI tool are used to analyse the extent to which DQI contributes to the management of client requirements.

Findings

Case study analysis suggests that the DQI enhances focus on client and project stakeholder requirements through the initial quality aspirations set out at the beginning of a project, but it is limited in its scope to address a more comprehensive requirements profile.

Research limitations/implications

The proposed ROPP model is conceptual and requires further development to test its effectiveness in enhancing focus on client requirements. However, given current developments in automated checking in BIM and other environments, this offers scope for further research in this area.

Originality/value

Maintaining focus on client requirements throughout the process is a key criterion for project success. However, given the many stakeholders involved, and the progressive translation into various project documents, there is a risk that focus on the original/evolving requirements of the client can be lost. Current approaches such as the DQI have limitations and a robust ROPP is, therefore, a key contribution to securing clients’ objectives over the project lifecycle.

Details

Built Environment Project and Asset Management, vol. 7 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 29 March 2013

Charles MacDonald, Derek H.T. Walker and Neveen Moussa

This paper aims to present and describe a value for money framework that can be used on alliance projects to improve the consideration of, and reporting of, value for money.

1852

Abstract

Purpose

This paper aims to present and describe a value for money framework that can be used on alliance projects to improve the consideration of, and reporting of, value for money.

Design/methodology/approach

Development of the framework used a combination of interviews with domain experts, reflection on practice and a Delphi panel to develop and refine a value for money/best value outcome framework for alliance projects.

Findings

The results indicate that a robust framework for demonstrating value for money in an alliance project is feasible, and a framework was developed and tested through the Delphi panel.

Research limitations/implications

The paper briefly describes the research approach but focuses on the outcome rather than the process.

Practical implications

The research aim of this paper is to expand the conceptual view and to illustrate how a practical assessment of value for money in project alliancing can be achieved. It presents the framework and describes it in sufficient detail for readers to be able to adopt and adapt it.

Social implications

Value for money in infrastructure projects has profound implications for society; this extends and enhances techniques used to assure value for money.

Originality/value

The paper provides a value for money framework across the whole project design to delivery cycle.

Details

Facilities, vol. 31 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 4 February 2021

Eymen Cagatay Bilge and Hakan Yaman

Integrated project delivery (IPD) and building information modeling (BIM) has begun to be used in real estate development projects over the past decade to improve collaboration…

1480

Abstract

Purpose

Integrated project delivery (IPD) and building information modeling (BIM) has begun to be used in real estate development projects over the past decade to improve collaboration, communication and efficiency. However, the use of BIM and IPD in projects does not always imply that the information is well used and managed. This study aims to explain how information management should be carried out in BIM and IPD projects, what activities should be managed by the information manager and which stakeholder should play this role and why?

Design/methodology/approach

This study provides a framework on the subject by conducting a comprehensive systematic review in the field of real estate development, BIM, IPD and information management. In this context, the Web of Science and Scopus databases have been systematically reviewed, n = 45 out of a total of n = 1,356 articles and additionally, the BIM documents and standards prepared by public institutions and organizations and industry reports have been examined in detail.

Findings

The framework for information management roles was established by reviewing the literature. According to this framework, information management activities of information managers are listed in the table that covers all phases of real estate development. The owner should undertake this role as it is the entity that oversees the built asset from planning to the management of that facility.

Originality/value

In terms of acquiring information management roles, there is no research on BIM and IPD projects and who will take over this role. This study desired to close this gap in the literature.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 February 2022

Hazhar Faris, Mark Gaterell and David Hutchinson

The construction industry is a primary contributor to the development of emerging economies such as the Kurdistan Region of Iraq. However, the sector is underperforming, and…

Abstract

Purpose

The construction industry is a primary contributor to the development of emerging economies such as the Kurdistan Region of Iraq. However, the sector is underperforming, and products are not meeting expectations. A lack of collaboration is considered a significant contributor to these issues. Various researchers have identified factors to improve collaborative approaches. However, there is still a lack of clear frameworks to help implement collaboration in the construction industry, especially in emerging economies. Therefore, this study aims to develop a framework to implement collaboration in the construction industry.

Design/methodology/approach

This article utilises a review of literature, questionnaire and interviews with experts in the construction industry in order to develop a framework to achieve collaboration in construction projects.

Findings

The research presents a framework that distributes the factors of collaboration over the project lifecycle stages in accordance with the Royal Institute of British Architects (RIBA) Plan of Work 2007. Each factor is divided into a set of enabling conditions which must be satisfied to ensure that the given specific factors are delivered. Additionally, the framework suggests appointing a collaboration champion at the beginning of the project to manage the process.

Originality/value

The research contributes to scarce literature about collaboration practices in the Kurdistan Region and in emerging economies in general.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 19 January 2010

Hemanta Doloi

The purpose of the paper is to put forward a research‐based argument on the benefits of simulation approach in managing design at an early stage of a project. Having selected an…

1534

Abstract

Purpose

The purpose of the paper is to put forward a research‐based argument on the benefits of simulation approach in managing design at an early stage of a project. Having selected an optimal design configuration, the operational uncertainties can be removed and investment decisions are fully justified over the lifecycle of projects.

Design/methodology/approach

A simulation‐based methodology embodying balanced scorecard (BSC) for measuring the operational and business performance has been synthesised in the research. Multi‐criteria decision analysis (MCDA) has been employed to evaluate the trade‐offs between feasible design alternatives and to select the optimum design configuration.

Findings

The findings show that the integrated framework developed in this research by integrating simulation technology, BSC and MCDA adds significant contributions in improving the current body of knowledge in the design management practices.

Research limitations/implications

The framework should further be tested by applying to large engineering projects in order for realising the benefits in the decision‐appraisal process. Access to data in large projects before implementation would be the greatest challenge from a commercial‐in‐confidence perspective.

Practical implications

The framework will help the practitioner's understanding and management of the design configuration in highly complex modern projects. This will allow the decision makers to manage interdependency of complex processes and select optimal designs upfront. The resulting framework will significantly contribute to reducing scope creeps and cost variations and thereby reducing contractual disputes in projects.

Originality/value

The original design of the integrated framework of this kind for managing design complexity in projects adds significant value in the design management practices. The use of simulation embodying BSC and MCDA adds significant novelty in theoretical advancement of contemporary knowledge in the design management profession.

Details

Construction Innovation, vol. 10 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 28 February 2019

Monty Sutrisna and Jack Goulding

Following the increasing need for faster construction, improved quality and evidence value propositions, offsite construction is increasingly being proffered as a viable contender…

2395

Abstract

Purpose

Following the increasing need for faster construction, improved quality and evidence value propositions, offsite construction is increasingly being proffered as a viable contender to “traditional” construction approaches. However, whilst evidence supports the move towards offsite, its uptake has been lower than expected. Whilst the precise reasons for this seem to be influenced by a number of issues, including contextual drivers and market maturity; some project stakeholders also view offsite as carrying greater risks. The purpose of this paper is to report on the quality of information flow, in particular, the impact and influence of this on design risks in offsite construction projects.

Design/methodology/approach

An existing design risk framework is used as the point of departure for this research. This is further expanded into a specific model for evaluating offsite construction projects design risks, the rubrics of which were informed by two case studies of offsite construction projects in Australia and the UK analysed with a process-tracing technique. Whilst these cases were geographically separated, the constructs were aligned to uncover fundamental design information requirements and concomitant risks associated with offsite.

Findings

The findings of the research reported in this paper include the crucial information feeding into the design process emanating from the lifecycle of offsite construction projects, namely, design, offsite (manufacturing), handling and transporting, site works and installation and also occupancy. These are contextualised within the four categories, namely, client requirements, project requirements, regulation aspects and social aspects and the final outcomes were summarised into a holistic diagram.

Originality/value

Given that the offsite construction has shifted the working paradigm into assigning a significant level of efforts and emphasis at the front end of the construction projects, the importance of its design process and hence design risks management has gone up significantly in construction projects delivered using this technique. This research and paper contributes significantly to the built environment domain by identifying the crucial aspects along the project lifecycle to be considered to minimise the potential occurrence of design risks and hence increasing the confidence of project stakeholders in adopting offsite construction techniques in their projects.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 May 2018

Martin Morgan Tuuli

The purpose of this paper is to explore the impact of project settings on empowerment experiences of individuals and teams by examining the effects of specific project

Abstract

Purpose

The purpose of this paper is to explore the impact of project settings on empowerment experiences of individuals and teams by examining the effects of specific project characteristics on facets of the empowerment concept (i.e. the structural and psychological perspectives).

Design/methodology/approach

A parallel questionnaire survey of client, consultant and contractor organisations was conducted in Hong Kong to test hypotheses relating three facets of the empowerment concept and five project-level antecedents. Hierarchical linear modelling and ordinary least square regression were employed to test the hypotheses.

Findings

The analyses show that dynamic project environments, high project team integration and high interdependence of project tasks lead to high individual psychological empowerment, while public-client projects (compared with private-client projects), a hostile project environment and high client integration lead to a low individual psychological empowerment. Uncertainty in project technology also leads to high team psychological empowerment, while hostile project environments lead to low team psychological empowerment. Further, dynamic project environments lead to more empowering work climate, while hostile project environments lead to less empowering work climate. However, project team integration, project complexity, project lifecycle and quasi-public-client projects (compared with private-client projects) have no significant association with the empowerment of individuals and teams.

Originality/value

This study examined task-related factors (i.e. project in this case) which traditionally have not been the focus of studies examining the antecedents of empowerment. Further, project-level antecedents and their link to an integrated perspective of empowerment comprising a sociostructural perspective, a psychological perspective and a team-based perspective are examined, which is a significant departure from the unitary perspective of empowerment taken in most previous studies.

Details

International Journal of Managing Projects in Business, vol. 11 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 14 August 2017

Krista White and Caryn Radick

This paper aims to explore two separate legacy oral history digitization projects at one institution and how the project teams approached the different issues and challenges these…

1307

Abstract

Purpose

This paper aims to explore two separate legacy oral history digitization projects at one institution and how the project teams approached the different issues and challenges these projects presented.

Design/methodology/approach

The approach compares two case studies of how digitization of legacy oral history collections was carried out. The paper discusses these projects utilizing a lifecycle model approach and reveals how archival and digital humanities perspectives drove some of the projects’ differences.

Findings

The authors find that when working with digitizing legacy oral history collections, each collection will require different approaches and methods of problem solving. In large institutions with multiple repositories, it can be useful for project teams to consult each other to develop best practices.

Practical implications

The two case studies presented in this paper can serve as models for other institutions digitizing many oral history collections and serve as a model for communication and collaboration in larger institutions with multiple repositories.

Originality/value

This paper compares and contrasts two case studies of digitization projects involving legacy oral history collections in different units of one large institution. Project teams were influenced by different approaches. One project was conducted by archivists and the other led by a digital humanities librarian. Differing professional foci provided different perspectives about collection characteristics and, subsequently, led to different approaches that impacted implementation of the projects.

Details

Digital Library Perspectives, vol. 33 no. 3
Type: Research Article
ISSN: 2059-5816

Keywords

21 – 30 of over 8000