Search results

1 – 10 of 499
Open Access
Article
Publication date: 1 May 2018

Kirsi Aaltonen and Virpi Turkulainen

The purpose of this paper is to elaborate the understanding of socialization in the context of temporary operations and organizational settings, using project alliance – the most…

2844

Abstract

Purpose

The purpose of this paper is to elaborate the understanding of socialization in the context of temporary operations and organizational settings, using project alliance – the most contemporary approach to the management of large and complex projects – as an example. In particular, the paper also assesses how informal and formal socialization mechanisms are used to facilitate relational capital in such a setting.

Design/methodology/approach

Data were collected by two case studies of complex infrastructure projects in a Northern European city. The analysis focuses on how socialization is managed across organizational interfaces within the alliance organization during the project tendering and development phase to create relational capital.

Findings

The findings indicate that significant emphasis is put on socialization in project alliances. However, while in the tendering phase both informal and formal socialization mechanisms are used to create relational capital; in the development phase informal socialization mechanisms are associated with higher levels of relational capital and formal socialization mechanisms are used to maintain the level of relational capital.

Originality/value

While operations and supply chain management research argues that socialization is critical to manage organizational interfaces and to create relational capital in buyer-supplier relationships, research has mainly focused on ongoing operations. This study complements the prior research by developing further insight into socialization in the context of temporary operations and organizational settings; such settings create a unique empirical context, posing different managerial challenges as the results also indicate.

Details

International Journal of Operations & Production Management, vol. 38 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1018

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 24 November 2023

Ornella Tanga Tambwe, Clinton Ohis Aigbavboa and Opeoluwa Akinradewo

Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of…

Abstract

Purpose

Data represents a critical resource that enables construction companies’ success; thus, its management is very important. The purpose of this study is to assess the benefits of construction data risks management (DRM) in the construction industry (CI).

Design/methodology/approach

This study adopted a quantitative method and collected data from various South African construction professionals with the aid of an e-questionnaire. These professionals involve electrical engineers, quantity surveyors, architects and mechanical, as well as civil engineers involved under a firm, or organisation within the province of Gauteng, South Africa. Standard deviation, mean item score, non-parametric Kruskal–Wallis H test and exploratory factor analysis were used to analyse the retrieved data.

Findings

The findings revealed that DRM enhances project and company data availability, promotes confidentiality and enhances integrity, which are the primary benefits of DRM that enable the success of project delivery.

Research limitations/implications

The research was carried out only in the province of Gauteng due to COVID-19 travel limitations.

Practical implications

The construction companies will have their data permanently in their possession and no interruption will be seen due to data unavailability, which, in turn, will allow long-term and overall pleasant project outcomes.

Originality/value

This study seeks to address the benefits of DRM in the CI to give additional knowledge on risk management within the built environment to promote success in every project.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

13804

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 30 March 2021

Christophe Gaie, Bertrand Florat and Steven Morvan

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

2138

Abstract

Purpose

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

Design/methodology/approach

They provide a simple tool based on five complementary views, which should be detailed by the project team using a classic source code management platform.

Findings

The proposed tool is open source and may be reused by any IT team in various project contexts and heterogeneous development methods.

Originality/value

This research provides an operational framework, which facilitates IT project management and documentation. The framework is open source and may be easily downloaded by any other IT team.

Details

Applied Computing and Informatics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-1964

Keywords

Open Access
Article
Publication date: 18 October 2019

Nadeem Ali El-Adaileh and Scott Foster

The purpose of this paper is to present a systematic literature review to determine the factors that relate to successful business intelligence (BI) system implementation.

16316

Abstract

Purpose

The purpose of this paper is to present a systematic literature review to determine the factors that relate to successful business intelligence (BI) system implementation.

Design/methodology/approach

The study has a collection of literature that highlights potential references in relation to factors for system implementation in relation to BI. There is the employment of “content analysis”, given that the study purpose is the achievement of deep understanding of the variety of factors of implementation that other researchers have previously identified.

Findings

An initial investigation of 38 empirical studies on the implementation of BI led to ten factors being compiled. Difficulties in implementation were found to exist in relation to the operationalisation of large numbers of factors within organisations. The implementation factors were analysed and then sorted into a descending order based upon their frequency of occurrence.

Research limitations/implications

The research is limited to consider BI implementation factors. Moreover, literature is collected from selected databases and journals from 1998 to 2018.

Practical implications

Researchers of BI may, within the future, develop models for the measurement of the implementation level of BI within industries along with the sustaining of them. Moreover, work-based learning industries can benefit by adopting the results of this study for the effective implementation of BI. The implementation factors can be seen as key constructs upon which there may be the undertaking of more statistical analyses.

Originality/value

The original output from this research can help researchers’ in the future in enhancing identification of studies that are relevant for the review of literature for their research.

Details

Journal of Work-Applied Management, vol. 11 no. 2
Type: Research Article
ISSN: 2205-2062

Keywords

Open Access
Article
Publication date: 30 March 2023

Areej Alyami, David Sammon, Karen Neville and Carolanne Mahony

This study explores the critical success factors (CSFs) for Security Education, Training and Awareness (SETA) program effectiveness. The questionable effectiveness of SETA…

3354

Abstract

Purpose

This study explores the critical success factors (CSFs) for Security Education, Training and Awareness (SETA) program effectiveness. The questionable effectiveness of SETA programs at changing employee behavior and an absence of empirical studies on the CSFs for SETA program effectiveness is the key motivation for this study.

Design/methodology/approach

This exploratory study follows a systematic inductive approach to concept development. The methodology adopts the “key informant” approach to give voice to practitioners with SETA program expertise. Data are gathered using semi-structured interviews with 20 key informants from various geographic locations including the Gulf nations, Middle East, USA, UK and Ireland.

Findings

In this study, the analysis of these key informant interviews, following an inductive open, axial and selective coding approach, produces 11 CSFs for SETA program effectiveness. These CSFs are mapped along the phases of a SETA program lifecycle (design, development, implementation and evaluation) and nine relationships identified between the CSFs (within and across the lifecycle phases) are highlighted. The CSFs and CSFs' relationships are visualized in a Lifecycle Model of CSFs for SETA program effectiveness.

Originality/value

This research advances the first comprehensive conceptualization of the CSFs for SETA program effectiveness. The Lifecycle Model of CSFs for SETA program effectiveness provides valuable insights into the process of introducing and sustaining an effective SETA program in practice. The Lifecycle Model contributes to both theory and practice and lays the foundation for future studies.

Details

Information Technology & People, vol. 36 no. 8
Type: Research Article
ISSN: 0959-3845

Keywords

Open Access
Article
Publication date: 22 February 2022

Solmaz Mansoori, Janne Harkonen and Harri Haapasalo

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization…

2245

Abstract

Purpose

This study aims to facilitate consistency of information in building information modelling (BIM) and address the current BIM gaps through the perspectives of the productization concept and product structure (PS).

Design/methodology/approach

The study follows a conceptual research approach in conjunction with a single case study. First, the previous studies on BIM implementation, productization and PS are reviewed. Further, a case study is used to analyse the current state of productization in the construction sector and develop a functional PS for construction.

Findings

A Part-Phase-Elements Matrix is proposed as a construction-specific PS to facilitate consistency in information and to enhance BIM. The proposed matrix provides new avenues to facilitate consistent information exchange through the interconnection between conceptual PS and standard building objects library, and encourage collaborative communication between stakeholders.

Originality/value

This study explores the core of the productization concept and PS as means to facilitate consistency of information and thus address the current gaps in BIM. This as building projects progressively move towards systematic modular and prefabricated construction where the flow of reliable information about product and construction offerings becomes increasingly important.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 499