Article
Publication date: 29 January 2024

Nilton Takagi, João Varajão and Thiago Ventura

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental…

Abstract

Purpose

As in the private sector, public organizational information systems (IS) development is commonly carried out through projects. One of the alternatives followed by governmental organizations to perform their projects is outsourcing (by hiring other public institutions that have expertise in the IS area of the projects to be developed). However, limited research has been conducted on project success regarding these government-to-government (G2G) contexts. Since achieving success is crucial for public management, this paper proposes a model for Success Management of IS projects in G2G context.

Design/methodology/approach

The research method was design science research (DSR). In the evaluation step of the DSR, IS projects in a G2G environment were the object of case studies.

Findings

This work presents in detail how Success Management activities can be integrated into the processes and process groups of the Project Management Institute's project management guide. The authors also suggest tools and techniques to be used in each Success Management activity.

Practical implications

Managing success, particularly addressing success criteria and success factors, can help managers focus their efforts on what will really impact the success of a project. In the context of IS projects in G2G contexts, this contributes to decreasing waste and increasing the chances of providing better services to citizens.

Originality/value

This work contributes to theory by providing a new model for IS G2G projects that integrates Success Management and project management processes.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 March 2024

Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…

Abstract

Purpose

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.

Design/methodology/approach

Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.

Findings

The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.

Research limitations/implications

The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.

Originality/value

This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 16 February 2024

Nandini Sharma and Boeing Laishram

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…

Abstract

Purpose

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.

Design/methodology/approach

This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.

Findings

The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.

Practical implications

The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.

Originality/value

The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 February 2024

Alex Opoku, Kelvin Saddul, Georgios Kapogiannis, Godwin Kugblenu and Judith Amudjie

This paper explores project managers' (PMs') role in contributing to and achieving sustainability within construction projects, particularly focusing on Sustainable Development…

Abstract

Purpose

This paper explores project managers' (PMs') role in contributing to and achieving sustainability within construction projects, particularly focusing on Sustainable Development Goal (SDG) 11.

Design/methodology/approach

Semi-structured interviews were conducted with 15 PMs working with construction firms in the UK. Thematic analysis was also performed on the qualitative data retrieved using the NVivo software.

Findings

The study’s findings revealed that PMs working on construction projects considered various sustainable construction processes in attempts to solve problems with traditional construction technology. Furthermore, it was revealed that the PM’s role was key in achieving the SDGs in general and SDG 11 in particular through the process of perfecting the client brief, ensuring the client’s financial stability and creating an environment of teamwork. In terms of specific competencies, sustainability leadership and sustainable innovative capability were revealed to suggest that a PM is the leader of change.

Originality/value

The study highlights the essential role of the PM in delivering sustainable construction projects as part of the drive to achieve SDG 11. The study impacts the construction industry in developing strategies and training programs that build PMs' competencies and skills for contributing to the world we want.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 25 January 2024

Mohammad Mehrabioun Mohammadi

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed…

Abstract

Purpose

This research aims to examine the challenges of recruiting participatory action research (PAR) in managing innovation projects. An enhanced methodology based on PAR was developed to mitigate the challenges related to recruiting PAR in managing innovation projects. The proposed methodology was evaluated by comparing it to established methodologies/frameworks such as Scrum, Design Thinking (DT) and The Lean Startup (TLS). The evaluation aimed to determine the advantages and limitations of the proposed methodology in managing innovation projects.

Design/methodology/approach

The proposed enhanced methodology consists of eight steps, ranging from developing an understanding of the industry and business structure to learning and knowledge management. In addition, the enhanced methodology uses other techniques, such as Force field analysis and 12 boundary questions.

Findings

The research findings indicate that using the proposed methodology can improve the formalization of collaboration in PAR, enabling the organization to respond better to market changes. It helps define the project scope more clearly, encouraging innovation, addressing communication barriers and considering different worldviews and practical issues. Based on the findings, the proposed enhanced methodology could complement other methodologies/frameworks such as Scrum, DT and TLS.

Research limitations/implications

The current research adds to the existing literature by identifying the challenges of recruiting PAR in managing innovation projects. A deductive reasoning process was utilized because there is no comprehensive research concerning the challenges of recruiting PAR in managing innovation projects. On the other hand, the PAR 4-phase cycle has been reviewed and enhanced to manage innovation projects.

Practical implications

The proposed methodology was used in a new product development project. The case study was done on one of the payment service provider companies that design, develop and deploy a digital product for marketing, installation, repair and maintenance of electronic funds transfer at point of sale devices.

Originality/value

No research has yet sought to identify the challenges of using PAR in innovation project management (IPM). Identifying the challenges associated with applying PAR in the IPM and providing an enhanced methodology to mitigate the challenges could fill a gap in IPM studies.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 24 January 2022

Muhammad Ayat, Sheheryar Mohsin Qureshi and Changwook Kang

The purpose of this study is to propose an improved framework for managing Private Participation in Infrastructure ICT (PPI-ICT) projects in the context of developing countries as…

Abstract

Purpose

The purpose of this study is to propose an improved framework for managing Private Participation in Infrastructure ICT (PPI-ICT) projects in the context of developing countries as the requirements to manage them are different in several aspects.

Design/methodology/approach

The framework has been proposed based on an exhaustive literature review and statistical analysis of the PPI-ICT projects’ data set using logistic regression, F-test and student’s t-test. The proposed framework was also applied to the PPI-ICT projects.

Findings

The framework is an extension to NTCP (novelty, technology, complexity and pace) approach by including extrinsic factors such as income of the country, climate risk, religious diversity, political stability, regularity quality and control of corruption. The proposed framework was used to analyze project characteristics and their external conditions in the context of developing countries. Based on the analyses, the authors have presented a detailed set of recommendations for project managers, practitioners and governments to improve the success rate of these projects.

Originality/value

The major contribution of this study is the framework, which encompasses the NTCP model as well as extrinsic characteristics of PPI-ICT projects. The proposed framework is meant to assist the project managers to comprehend the project characteristics and its external environment to identify an adequate approach for managing projects successfully.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords