Publication date: 25 November 2022

Zhijia You

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…

Abstract

Purpose

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.

Design/methodology/approach

This research adopts a deductive research approach.

Findings

This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.

Originality/value

The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Sonali Khatua, Manoranjan Dash and Padma Charan Mishra

Ores and minerals are extracted from the earth’s crust depending on the type of deposit. Iron ore mines come under massive deposit patterns and have their own mine development and…

Abstract

Purpose

Ores and minerals are extracted from the earth’s crust depending on the type of deposit. Iron ore mines come under massive deposit patterns and have their own mine development and life cycles. This study aims to depict the development and life cycle of large open-pit iron ore mines and the intertwined organizational design of the departments/sections operated within the industry.

Design/methodology/approach

Primary data were collected on the site by participant observation, in-depth interviews of the field staff and executives, and field notes. Secondary data were collected from the literature review to compare and cite similar or previous studies on each mining activity. Finally, interactions were conducted with academic experts and top field executives to validate the findings. An organizational ethnography methodology was employed to study and analyse four large-scale iron ore mines of India’s largest iron-producing state, Odisha, from January to April 2023.

Findings

Six stages were observed for development and life cycle, and the operations have been depicted in a schematic diagram for ease of understanding. The intertwined functioning of organizational set-up is also discovered.

Originality/value

The paper will benefit entrepreneurs, mining and geology students, new recruits, and professionals in allied services linked to large iron ore mines. It offers valuable insights for knowledge enhancement, operational manual preparation and further research endeavours.

Details

Journal of Organizational Ethnography, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6749

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2718

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 December 2022

Ram Asra Khural, Shashi, Myriam Ertz and Roberto Cerchione

This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable…

Abstract

Purpose

This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable construction materials, sustainable construction design, modern construction methods and environmental provisions and reporting) and sustainability performance (environmental, economic and social) in hill road construction (HRC).

Design/methodology/approach

Primary data were collected from the 313 HRC practitioners with the help of a questionnaire, and research hypotheses were tested employing structural equation modeling.

Findings

The findings reveal a mixed effect of sustainability implementation barriers. Resource (managerial) barriers are negatively related to all practices except environmental provisions and reporting (sustainable construction materials), while regulatory barriers only negatively impact modern construction methods. On the other hand, all sustainability practices positively impact environmental performance, whereas economic (social) performance is positively influenced by all practices, except environmental provisions and reporting (modern construction methods), and positively affects economic performance.

Originality/value

In order to transform HRC toward sustainability, the barriers to sustainability implementation, sustainability practices and performance need to be understood by practitioners; however, the relationships have not previously been empirically assessed in extant literature. Besides, past research appears to be predominantly focused on the environmental aspect, thereby neglecting economic and social aspects. This study is a modest attempt to bridge these research gaps.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 17 October 2023

Qiong Wu, Qiwei Zhou and Kathryn Cormican

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious…

Abstract

Purpose

Shared leadership is an effective mechanism for managing project teams. Its performance-enhancing benefits have been demonstrated in many studies. Nonetheless, there is an obvious silence about how to promote shared leadership in Lean Six Sigma (LSS) project teams. To address this deficit, the purposes of this study are to investigate the influence of shared leadership on LSS project success and to explore how team psychological safety, project task complexity and project task interdependence influence shared leadership.

Design/methodology/approach

A multi-source, time-lagged survey design with a four-month interval was conducted. To do this, the authors collected data from 71 project teams (comprising 71 project managers and 352 project members) using LSS approaches in the manufacturing and service industries.

Findings

The findings show that shared leadership positively influences LSS project success. The authors also found that team psychological safety fosters the development of shared leadership and, more importantly, these effects are stronger when the tasks are more complex and more interdependent.

Practical implications

These findings advance our understanding of the factors that enable shared leadership and equip LSS project managers with practical techniques to improve shared leadership for the success of their projects.

Originality/value

This study extends the theory of shared leadership to the context of LSS project management and is among the first, to the best of the authors’ knowledge, to theoretically propose and empirically validate how to promote shared leadership in LSS project teams.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3307

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.