Publication date: 23 October 2023

Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…

Abstract

Purpose

The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.

Design/methodology/approach

This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.

Findings

Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.

Practical implications

Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.

Originality/value

To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 April 2024

Patrick Kraus, Elias Fißler and Dennis Schlegel

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the…

Abstract

Purpose

In recent years, the robotic process automation (RPA) technology has increasingly been used to automate business processes. While a lot of research has been published on the potential and benefits of the technology, only a few studies have conducted research on challenges related to RPA adoption. Hence, this study aims to identify and discuss challenges related to RPA implementation projects.

Design/methodology/approach

Following an inductive methodology, interviews have been conducted with consultants who were involved in multiple RPA implementation projects. Hence, their extensive experience and views contribute to a detailed and in-depth understanding of the phenomena under research.

Findings

The results suggest that there are various process-related, technical, resource-related, psychological and coordinative challenges that must be considered when conducting an RPA implementation project.

Originality/value

This paper contributes to knowledge by presenting a new typology of challenges, as well as providing an in-depth discussion of the individual challenges that organizations face.

Details

International Journal of Organizational Analysis, vol. 32 no. 11
Type: Research Article
ISSN: 1934-8835

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 19 March 2024

Mansoor Ahmed and Lorenzo Lucianetti

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage…

Abstract

Purpose

The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage (EB) and project success (PS), in the case of freelancers. The study aims to get a better understanding of whether freelancers, who behave like entrepreneurial leaders, can successfully complete projects through EB.

Design/methodology/approach

The study collected data from 209 freelancers through snowball sampling, in two waves, with a time-lag of fourteen days, to better examine the causality of variables. Data were analyzed by Model No. 4 and 7 (i.e. mediation and moderation, respectively) of Process macro.

Findings

Drawing on the effectuation theory, the results show that EB mediates the relationship between EL and PS and EPF moderates this relationship.

Practical implications

The freelancers can formally establish businesses later, after knowing whether they can complete these new types of projects. These online freelancing platforms can provide special services to freelancers who first want to test their skills on unrelated projects. In sum, the paper suggests that freelancers can be successful entrepreneurial leaders.

Originality/value

The EL, EPF, EB and PS are studied in the context of the informal sector, i.e. freelancing, which is the emerging working style in the world. It provides an in-depth understanding of phenomena in freelancers that lacks background literature.

Details

Journal of Small Business and Enterprise Development, vol. 31 no. 8
Type: Research Article
ISSN: 1462-6004

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

457

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 April 2024

Rifaldi Majid

The presence of securities crowdfunding (SCF) FinTech in the Islamic financial landscape opens investment opportunities through shares and sukuk (Sharia bond) instruments. This…

Abstract

Purpose

The presence of securities crowdfunding (SCF) FinTech in the Islamic financial landscape opens investment opportunities through shares and sukuk (Sharia bond) instruments. This study aims to examine the effect of investment risk (IR), legal risk (LR), product knowledge (PK), Sharia compliance (SC) and subjective norm (SN) on investment decisions in businesses and projects run by small and medium enterprises (SMEs).

Design/methodology/approach

The questionnaires were distributed to prospective investors with prior knowledge of SCF and Islamic investment. The data collected was then examined using partial least square-structural equation modeling using SmartPLS 4.0.

Findings

The results show that LR has positive and significant implications for supporting investment through SCF, while IR has the opposite. The main findings in this study explain that PK and SC are proven to strengthen the intention to invest in SCF. Meanwhile, SN, which also strengthens intention, is the greatest influence. Therefore, it is highly recommended that SCF organizers collaborate with regulators (OJK), universities, academics and the investor community, as well as Muslim entrepreneurs, to provide education and literacy regarding SCF products and the underlying contracts, along with the consequences and uniqueness of investment vis SCF.

Practical implications

From a managerial side, Sharia expert educators can be appointed to increase investors’ literacy and confidence to support SMEs’ business expansion via SCF. In addition, to minimize investment risk, SCF organizers are also advised to issue sukuk and shares in different low-risk businesses/sectors, followed by investment amounts that are more affordable for novice investors.

Originality/value

Research on SCF as an alternative to SME financing is still scarce. To the best of the author’s knowledge, this is the first research to empirically test the relationship between risk, SC, PK and SN on potential investors’ decisions to support SMEs through the SCF mechanism.

Details

Journal of Islamic Marketing, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1759-0833

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1605

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 October 2021

Achinthya Dharani Perera Halnetti, Nihal Jayamaha, Nigel Peter Grigg and Mark Tunnicliffe

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the…

Abstract

Purpose

The purpose of this paper is to investigate how successful lean six sigma (LSS) manifests in the Australasian (Australian and New Zealand) context relative to the context in the USA in terms of LSS project definition, structure and practices.

Design/methodology/approach

In-depth investigation through case studies – 12 Australian/New Zealand cases and 4 US cases – on the implementation mechanisms of successful LSS initiatives.

Findings

A significant difference was found between Australasian and US definitions of an LSS project. However, firms in both regions followed similar project selection, initiating and execution practices. LSS reporting structures were found to be well-established in US organizations, but none of the Australasian organizations were found to be equipped with such a structure, although the effectiveness of LSS implementation success remained unaffected.

Research limitations/implications

Sufficient uniformity of LSS was found across two regions implying its usefulness/generalizability, but the findings are based only on 12 cases.

Originality/value

The paper provides the groundwork to develop a unique LSS model for Australasian organizations to improve processes in an effective and efficient manner.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of 338