Article
Publication date: 15 July 2022

Saleh Abu Dabous, Tareq Zadeh and Fakhariya Ibrahim

This study aims at introducing a method based on the failure mode, effects and criticality analysis (FMECA) to aid in selecting the most suitable formwork system with the minimum…

Abstract

Purpose

This study aims at introducing a method based on the failure mode, effects and criticality analysis (FMECA) to aid in selecting the most suitable formwork system with the minimum overall cost.

Design/methodology/approach

The research includes a review of the literature around formwork selection and analysis of data collected from the building construction industry to understand material failure modes. An FMECA-based model that estimates the total cost of a formwork system is developed by conducting a two-phased semi-structured interview and regression and statistical analyses. The model comprises material, manpower and failure mode costs. A case study of fifteen buildings is analysed using data collected from construction projects in the UAE to validate the model.

Findings

Results obtained indicate an average accuracy of 89% in predicting the total formwork cost using the proposed method. Moreover, results show that the costs incurred by failure modes account for 11% of the total cost on average.

Research limitations/implications

The analysis is limited to direct costs and costs associated with risks; other costs and risk factors are excluded. The proposed framework serves as a guide to construction project managers to enhance decision-making by addressing the indirect cost of failure modes.

Originality/value

The research proposes a novel formwork system selection method that improves upon the subjective conventional selection process by incorporating the risks and uncertainties associated with the failure modes of formwork systems into the decision-making process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 March 2024

Jiju Antony, Michael Sony, Raja Jayaraman, Vikas Swarnakar, Guilherme da Luz Tortorella, Jose Arturo Garza-Reyes, Rajeev Rathi, Leopoldo Gutierrez, Olivia McDermott and Bart Alex Lameijer

The purpose of this global study is to investigate the critical failure factors (CFFs) in the deployment of operational excellence (OPEX) programs as well as the key performance…

Abstract

Purpose

The purpose of this global study is to investigate the critical failure factors (CFFs) in the deployment of operational excellence (OPEX) programs as well as the key performance indicators (KPIs) that can be used to measure OPEX failures. The study also empirically analyzes various OPEX methodologies adopted by various organizations at a global level.

Design/methodology/approach

This global study utilized an online survey to collect data. The questionnaire was sent to 800 senior managers, resulting in 249 useful responses.

Findings

The study results suggest that Six Sigma is the most widely utilized across the OPEX methodologies, followed by Lean Six Sigma and Lean. Agile manufacturing is the least utilized OPEX methodology. The top four CFFs were poor project selection and prioritization, poor leadership, a lack of proper communication and resistance to change issues.

Research limitations/implications

This study extends the current body of knowledge on OPEX by first delineating the CFFs for OPEX and identifying the differing effects of these CFFs across various organizational settings. Senior managers and OPEX professionals can use the findings to take remedial actions and improve the sustainability of OPEX initiatives in their respective organizations.

Originality/value

This study uniquely identifies critical factors leading to OPEX initiative failures, providing practical insights for industry professionals and academia and fostering a deeper understanding of potential pitfalls. The research highlights a distinctive focus on social and environmental performance metrics, urging a paradigm shift for sustained OPEX success and differentiating itself in addressing broader sustainability concerns. By recognizing the interconnectedness of 12 CFFs, the study offers a pioneering foundation for future research and the development of a comprehensive management theory on OPEX failures.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 16 February 2024

Nandini Sharma and Boeing Laishram

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of…

Abstract

Purpose

Construction industry faces challenges in making objective decisions due to monetary value attached to quality. Among various quality management techniques available, cost of quality (COQ) is one such method used to address the concern. However, the absence of measurable COQ factors to monitor quality costs hampers the implementation of COQ framework in the construction industry. Therefore, this study aims to identify COQ factors focused on visible factors (VF) and hidden factors (HF) and the current requirements to achieve it.

Design/methodology/approach

This study is based on Preferred Reporting Items for Systematic Review and Meta-Analyses protocol guidelines. The present study identified 57 articles published between 1992 and 2023 in peer-reviewed journals.

Findings

The findings reveal 22 factors, which are grouped into four categories based on COQ. Through systematic review, the authors observed limited methodological and theoretical diversity. In fact, there are no quantitative frameworks to calculate COQ. The study, therefore, developed a framework comprising four major routes/paths of COQ factors within the framework.

Practical implications

The COQ routes developed through this study will enable the practitioners to meticulously categorise VF and HF, facilitating quantifying of quality throughout the lifecycle of project, which is currently absent from the existing quality assurance/quality control (QA/QC) approach. In addition, these COQ routes stand as essential construction strategies, significantly enhancing outcomes related to time, cost, quality, sustainability and fostering closer relationships within project frameworks.

Originality/value

The current study contributes significantly to the existing body of knowledge by developing various COQ routes and proposing future research directions to address gaps in the literature.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 February 2024

Zhen Zhang and Min Min

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success…

Abstract

Purpose

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success. However, in contrast to positive project leadership, project managers’ knowledge hiding has received little attention. Drawing on the input-mediator-output (IMO) framework and model of work team resilience, we explored the effect of project managers’ destructive knowledge hiding (i.e. evasive hiding and playing dumb) on project team performance (i.e. efficiency and effectiveness) and the serial indirect effect through team psychological safety and transactive memory systems.

Design/methodology/approach

We conducted a time-lagged multiple-sourcing investigation of Chinese high-tech firms and tested the hypotheses using data collected from 105 NPD project teams.

Findings

Our findings demonstrated that project managers’ knowledge hiding negatively affects NPD project team performance and indirectly negatively affects transactive memory systems through team psychological safety. Moreover, project managers’ knowledge hiding exerts a negative indirect effect on team performance through team psychological safety and transactive memory systems in serial.

Originality/value

This study contributes to the literature on operations management (OM) by broadening our understanding of the connection between project managers' destructive knowledge hiding and the failure of NPD projects. In providing such insight, it also offers practical guidance for overcoming team-level obstacles arising from project managers' knowledge hiding.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 11 October 2022

Matti Haverila and Jenny Carita Twyford

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to…

Abstract

Purpose

Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.

Design/methodology/approach

A survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.

Findings

The results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.

Originality/value

Previous research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 21 September 2023

Faisal Mahmood, Abdul Zahid Khan, Sajid Amir Shah and Muhammad Adil

The purpose of this study is to investigate the post–enterprise resource planning (ERP) issues and challenges in the context of Saudi Arabia. There is a lack of research in the…

Abstract

Purpose

The purpose of this study is to investigate the post–enterprise resource planning (ERP) issues and challenges in the context of Saudi Arabia. There is a lack of research in the context of developing countries regarding post-ERP implementation issues and challenges. The high failure rate of the ERP system is a reflection of many management issues that occurred at different phases of ERP implementation. Previous research indicated that even after a successful implementation, the ERP system was unable to sustain itself in the organizations.

Design/methodology/approach

An exploratory case study design was adopted to proceed with this research process at two organizations in Saudi Arabia. The interviews of the top and middle management are conducted and transcribed. These case studies were further analyzed using the Creswell approach to generate several themes, and descriptions provided a deeper understanding of the post ERP implementation issues and challenges.

Findings

Research findings show that for successful ERP implementation, identified factors are top management support, integration, strategy, employee resistance, BPR, change management, vendor selection, team formation and culture. Moreover, factors for the post-ERP implementation that led to sustainability are top management support, training, system adoption, system testing, data migration, cost overrun, employee retention and post-implementation support.

Originality/value

This study is unique in its type to examine the issues and challenges organizations face after deploying ERP initiatives. This research's findings were useful and supportive for the senior management interested in successfully sustaining such an initiative in the organization.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 12 April 2024

Rogers Mwesigwa, Gonzaga Basulira, Joseph Mayengo and Jude Thadeo Mugarura

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Abstract

Purpose

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Design/methodology/approach

This study adopted a cross-sectional and quantitative approach. Data were collected using a questionnaire from 42 PPP projects in Uganda.

Findings

The study found that community engagement and commitment are all positively and significantly associated with the sustainability of PPP projects in Uganda. Results also show that community commitment mediates community engagement and project sustainability.

Research limitations/implications

The study results imply that for sustainability to be achieved, communities must be engaged in project activities such as planning, design and implementation to boost their commitment to project sustainability.

Originality/value

The sustainability of PPP projects is an emerging phenomenon. This paper contributes to scanty literature on ensuring the sustainability of PPP projects from a developing country’s perspective.

Details

Journal of Management Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0262-1711

Keywords

Article
Publication date: 25 March 2024

Francis Nuako, Frank Ato Ghansah and Thomas Adusei

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…

Abstract

Purpose

It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”

Design/methodology/approach

This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.

Findings

This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.

Practical implications

When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.

Originality/value

The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 January 2024

Libiao Bai, Xiaoyan Xie, Yichen Sun, Xue Qu and Xiao Han

Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased…

Abstract

Purpose

Assessing project criticality in a project portfolio (PP) is of great practical significance to improve robustness from damage. While project criticality assessment has increased diversity in approaches, the understanding of vulnerable project impacts is still limited. To promote a better understanding of assessing project criticality, a vulnerability measurement model is constructed.

Design/methodology/approach

First, integrating the tasks, projects and corresponding relationships among them, a project portfolio network (PPN) is constructed. Second, the project's vulnerability is measured by combining the topological structure and functional attributes. Third, project criticality is assessed by the vulnerability measurement results. Lastly, the proposed model is applied in a numerical example to illustrate its suitability and effectiveness.

Findings

For academia, this study provides a novel perspective on project vulnerability measurement and expands project criticality assessment tools. For practitioners, the straightforward model provides an effective tool for assessing project criticality and contributes to enhancing project portfolio management (PPM).

Originality/value

The impact of the task on the project is considered in this study. Topological structure and functional attributes are also integrated for measuring project vulnerability due to the impact of random attacks in an uncertain environment, providing a new perspective on the requirements of project criticality assessment and the measurement of project vulnerability.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2023

Ho Soon Choi

This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural…

96

Abstract

Purpose

This study defines and critically analyzes Korean high modernism using the Sewoon Sangga project as a case study, as it has significant value in Korea's urban and architectural history.

Design/methodology/approach

The methodology applied for this study was a theory-interpretive analysis. This study examines the modernization process of Seoul based on the concept of “high modernism,” in that the theory-interpretive analysis method analyzes historical phenomena centered on a specific concept.

Findings

As a form of national belief, the various ideas that give birth to modern cities are defined as “high modernism.” As a Korean megastructure, the Sewoon Sangga project is significant in the history of Korean urbanism and architecture because it is the archetype of Korean high modernism and is representative of South Korea's compressed economic growth. However, soon-to-be-demolished Sewoon Sangga signifies the failure of Korean high modernism. This study identified the critical characteristics of Korean high modernism through the Sewoon Sangga project.

Originality/value

This study analyzed a representative Asian city through the specific concept of high modernism. It transpired that high modernism, which played an important role in the birth and development of modern cities, should be transformed for future cities and architectural development. This study has significance in that it expands the study of the history of urbanism and architecture centered on the West to the same in Asia.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862