Article
Publication date: 8 February 2022

Sayed Muhammad Fawad Sharif, Yang Naiding and Sayed Kifayat Shah

Collaborative projects require overlapping skills and capabilities to facilitate knowledge transfer. However, not all kinds of learning are virtuous and some may lead to leakage…

Abstract

Purpose

Collaborative projects require overlapping skills and capabilities to facilitate knowledge transfer. However, not all kinds of learning are virtuous and some may lead to leakage of commercially valuable knowledge. The purpose of this paper is to explain and restrain leakage of organizational competitive knowledge in collaborative projects.

Design/methodology/approach

A total of 398 survey questionnaires are collected from project-based firms in Pakistan. We gathered data from horizontal and vertical collaborations. Analysis is conducted with transaction cost economics lens through Process Macro 3.0.

Findings

Findings suggest that partner’s learning intent (PLI) and distrust positively affect knowledge leakage, whereas human resource management (HRM) practices have negative effect on knowledge leakage. Furthermore, HRM practices negatively moderate the relationship between PLI and knowledge leakage and distrust positively mediates it.

Research limitations/implications

This study integrates HRM with knowledge management to restrain knowledge leakage and contributes to knowledge management and strategic management. This study examines knowledge leakage in the presence of passive opportunism.

Originality/value

This study explains how passive opportunism translates into opportunistic behavior. Besides, effectiveness of HRM practices are least surveyed to restrain passive and active opportunisms.

Details

VINE Journal of Information and Knowledge Management Systems, vol. 54 no. 3
Type: Research Article
ISSN: 2059-5891

Keywords

Article
Publication date: 2 January 2024

Andreas Wibowo

This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors…

Abstract

Purpose

This paper delves into the ex ante rates of return demanded by the private sector in Indonesian public–private partnership (PPP) infrastructure projects and the manifold factors emanating from project attributes that can influence these rates.

Design/methodology/approach

This paper analyzes feasibility studies of 37 PPP projects across different sectors. The studies were carefully selected based on relevance, completeness and validity of data. The analysis uses statistical techniques, including Levene’s tests, t-tests, ANOVA tests, Cohen’s effect size and Pearson correlations, to explore differences in cost of capital and excess returns across various attributes.

Findings

Based on the statistical analysis, no significant difference exists between the excess return of 200 basis points (bps) and the equity excess return of 0 bps. This suggests that the eligibility criteria for PPP projects require an internal rate of return (IRR) equal to the weighted average cost of capital plus 200 bps or an equity IRR equal to the cost of equity. The variations in the tested variables among diverse project attributes do not exhibit statistically significant disparities, even though specific attributes display moderate to high effect sizes.

Originality/value

This paper represents one of the first attempts to examine the rates of return demanded by the private sector in the context of Indonesian PPP projects. It comprehensively explores the factors that influence these rates, drawing on insights derived from feasibility studies.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 29 February 2024

Xi Yu, Awudu Abdulai and Dongmei Li

This study aims to examine farmers' decision to use smartphone agricultural applications (SAAs) and how SAAs adoption impact their land transfer behaviors in terms of the current…

Abstract

Purpose

This study aims to examine farmers' decision to use smartphone agricultural applications (SAAs) and how SAAs adoption impact their land transfer behaviors in terms of the current land transfer-in area (LTA) and the future willingness to renew land transfer-in after it expires (WTR).

Design/methodology/approach

This study provides empirical evidence on the relationship between farmers' use of SAAs and land transfer choice, using a field survey data of 752 rural farm households in 2020 from Sichuan province of China. The endogenous switching models are employed to address potential self-selection bias associated with voluntary SAAs use and to quantitatively examine the impacts of SAAs use on land transfer choice.

Findings

The empirical results reveal that SAAs significantly improves the probability of transfer-in of more land by 39.10%. We find SAAs use has heterogeneous impacts on land transfer-in choice in the groups of agricultural technology, extension service, marketing and credit. Besides, we also find that SAAs use exerts highly positive and significant impact on farmers with less land area transfer-in. Moreover, SAAs can increase the probability of farmers' willingness to renew the land transfer-in by 30%.

Originality/value

To the best of our knowledge, this study is the first to explore the quantitative relationship between the use of SAAs and farm households' land transfer choice. The findings of this work can provide policy-related insights to help government promote the development of digital applications in the agricultural sector.

Details

China Agricultural Economic Review, vol. 16 no. 1
Type: Research Article
ISSN: 1756-137X

Keywords

Article
Publication date: 28 March 2024

Ewa Sońta-Drączkowska and Agnieszka Krogulec

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to…

Abstract

Purpose

This study seeks to illuminate the managerial tensions inherent in implementing scaled agile (on the organizational, top management, middle management and team levels) and to frame these challenges within the broader context of project management.

Design/methodology/approach

The study adopts a grounded theory approach and delves into a qualitative dataset sourced from 34 interviews with subject matter experts actively engaged in scaling agile initiatives within large organizations spanning various industries. Additionally, the data have been enriched through a comprehensive literature review of the existing body of knowledge on scaling agile.

Findings

As a result of our investigation, we propose a framework of managerial tensions in scaling agile in large corporate settings and a series of research propositions and questions that may contribute significantly to the body of knowledge surrounding the phenomenon of “deprojectification” and propose agenda for the future studies in the field of project management.

Research limitations/implications

The study also carries significant managerial implications. Firstly, based on the insights from the practice of scaling agile in large corporate setting, management can build awareness of the challenges inherent of transitioning to agile practices. This may help to anticipate the possible problems and proactively develop strategies how to address them. Secondly, management can be instructed about contingencies inherent in scaling agile, along with the potential disfunctions and side effects (unintended outcomes) that may emerge during the transition process. Thirdly, project management practitioners can gain insights on how scaling agile may cause shifts in the approach to managing projects, project team management and competencies that need to be developed to cope with environments where various approaches to managing projects coexist.

Practical implications

These insights can aid in the agile transition process, beginning with directing managerial attention toward contextual factors and progressing through potential challenges at the organizational, top management, middle management and team levels. Furthermore, the study highlights possible dysfunctionalities and side effects of scaling agile, shedding light on the “dark side” of agile.

Originality/value

The study contributes to the expansion of the empirical database on the implementation of agile practices in large organizational settings. It plays a role in defining and delineating the phenomenon of scaling agile within the context of project management and outlines a research agenda for future project management studies. Additionally, our study adds to the ongoing discourse surrounding the “deprojectification” effect that can occur during the scaling of agile. Lastly, it establishes connections between project management and software development literature regarding the implementation of agile at scale.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 23 January 2024

Didas S. Lello, Yongchun Huang and Jonathan M. Kansheba

Agenda for knowledge creation within inter-project alliances and inter-firm supply chain networks has been extensively debated. However, the existing knowledge networks within…

Abstract

Purpose

Agenda for knowledge creation within inter-project alliances and inter-firm supply chain networks has been extensively debated. However, the existing knowledge networks within consultant-supplier interfaces in the architecture, engineering and construction (AEC) industry seem to be vague, loose, incidental and insignificant. This study examines factors affecting knowledge networking intention (KNI) within construction service supply chain (CSSC) networks.

Design/methodology/approach

Data analysis was conducted on a quantitative survey of 161 consulting professional service firms in Tanzania, employing stepwise regression modelling as the statistical technique.

Findings

The results indicate that three types of knowledge inertia (KI) exert varying effects on KNI. While both procedural (PI) and learning inertia (LI) negatively impact KNI, experience inertia (EI) has no impact on KNI. In addition, knowledge governance (KG) mechanisms are found to strongly strengthen and leverage the negative effects of PI and LI on KNI and the positive link between EI and KNI within outbound and heterogeneous CSSC actors, with formal KG having greater leverage than informal KG.

Practical implications

The study offers guidance on how managers of PBOs should strategically orchestrate knowledge governance mechanisms within CSSC networks to leverage KI behaviours.

Originality/value

Current literature on KNI, KI and KG within CSSC networks offers a limited understanding of how KI behaviours influence KNI of project-based organizations (PBOs) in tapping vibrant outbound peripheral knowledge. The research presents two major original contributions. First, the empirical evidence contributes to deepening the current understanding of how heterogeneous external knowledge within consultant-supplier interactions is negatively influenced by KI. Lastly, the study suggests formal and informal knowledge governance strategies for managers on how to counteract KI forces, thus extending the theoretical debate on KNI, KI and KG literature.

Article
Publication date: 19 February 2024

Donglin Chen, Min Fu and Lei Wang

The purpose of this paper is to analyze the symbiotic evolution decisions of digital innovation enterprises, research institutes and the government in the digital innovation…

Abstract

Purpose

The purpose of this paper is to analyze the symbiotic evolution decisions of digital innovation enterprises, research institutes and the government in the digital innovation ecosystem.

Design/methodology/approach

Based on innovation ecosystem theory and an evolutionary game model, this study constructs a tripartite symbiotic evolution game model of digital innovation ecosystems with digital innovation enterprises, research institutes and the government as the main bodies and analyzes the influencing factors as well as the evolution paths of the different behavioral strategies of each subject through numerical simulation.

Findings

The research shows that the digital innovation ecosystem has the characteristic of self-organization, which requires the symbiotic cooperation of each subject. The government plays an active role in any stage of symbiotic evolution, and the system cannot enter symbiosis under a low level of subsidies and penalties. Only when the initial willingness to cooperate of digital innovation enterprises and scientific research institutes is at a medium or high level is the system likely to become symbiotic. While digital innovation enterprises are more sensitive to government subsidies and punishments, scientific research institutes are more sensitive to the distribution proportion of cooperation income.

Originality/value

This study includes government regulation into the research scope, expands the research mode of the digital innovation ecosystem and overcomes the difficulties of empirical research in collecting dynamic large sample data. It vividly and systematically simulates the symbiotic evolution process of the digital innovation ecosystem, which provides a theoretical and practical reference for digital innovation ecosystem governance.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 21 December 2021

Bamidele Temitope Arijeloye, Isaac Olaniyi Aje and Ayodeji Emmanuel Oke

The purpose of the study is to elicit risk factors that are peculiar to public-private partnership (PPP)-procured mass housing in Nigeria from the expert perspectives in ensuring…

Abstract

Purpose

The purpose of the study is to elicit risk factors that are peculiar to public-private partnership (PPP)-procured mass housing in Nigeria from the expert perspectives in ensuring the success of the scheme thereby reducing housing deficit in the country.

Design/methodology/approach

The risk inherent in construction projects had been established through literature in general. The risk in PPP projects is emerging because of the recent acceptance of the procurement option by governments all over the globe. The Nigerian Government has also adopted the procurement option in bridging the housing deficit in the country. This study, therefore, conducts a Delphi survey on the probability of risk occurrence peculiar to PPP mass housing projects (MHPs) in Nigeria. Pragmatic research approach through the mixed method of both quantitative and qualitative methods was adopted for this study. The quantitative method adopts the administration of questionnaires through the Delphi survey, whereas the qualitative method used interviews with the respondents. A two-stage Delphi questionnaire was administered to construction practitioners that cut across academics, the public and the private sectors by adopting convenient sampling techniques and following the Delphi principles and procedures. A total of 63 risk factors were submitted to the expert to rank on a Likert scale of 7 and any risk factors that the mean item score (MIS) falls below the grading scale of the five-point benchmark is deemed not necessary a risk factor associated with PPP MHPs and thereby expunged from the second round of the Delphi Survey. The interview was subsequently applied to the respondents to substantiate the risk factors that are peculiar to PPP-procured mass housing in the study area.

Findings

The findings show that risk factors such as maintenance frequent than expected, life of facility shorter than anticipated and maintenance cost higher than expected fall below 5.0 benchmark with MIS of 4.64 and 4.55 indicating that the risk factors are not peculiar to PPP mass housing in Nigeria.

Research limitations/implications

The implication for practise of this research is that these risk factors provide the PPP stakeholders with the comprehensive checklists that can aid in developing PPP risk assessment guidelines in the sector though both partners should be aware of the dynamic nature of risk because new ones might be emerging.

Originality/value

The authors hereby declare that the research findings are a product of a thorough research conducted in the study area and have not to be submitted or published by another person or publisher and due acknowledgement was made where necessary.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 4 April 2024

Yubo Guo, Jinchan Liu, Chuan Chen, Xiaowei Luo and Igor Martek

Public–Private Partnerships (PPPs) are crucial to the procurement of global infrastructure projects. Moreover, a price mode based on a cluster of core concessionary items is key…

Abstract

Purpose

Public–Private Partnerships (PPPs) are crucial to the procurement of global infrastructure projects. Moreover, a price mode based on a cluster of core concessionary items is key to the delivery of value-for-money and successful project outcomes. However, existing research has yet to fully identify PPP concessionary items, nor yet described the range of practical price modes. This study provides taxonomy of core concessionary items impacting PPP projects, systematically classifies price modes, and assesses the applicability and risk impacts of those price modes on PPP projects.

Design/methodology/approach

This study adopts a comparative case study method in analyzing core concessionary items and alternative price modes. China is taken as the context, as it is one of the world’s largest PPP markets. In ensuring research validity and reliability, diverse data sources are utilized, with a graphic content analysis tool developed to capture the structure of price modes.

Findings

Eight PPP price modes are identified. These are: (1) UP (Unit Price) mode, (2) ALS (Annual Lump Sum) mode, (3) IRR (Internal Rate of Return) mode, (4) RP (Return for Investing Capital (RIC) - Profit Rate of O&M (PROM)) mode, (5) RFP (RIC - Financing Interest Rate (FR) - PROM) mode, (6) RFPL (RIC - FR - PROM - Lower Limit of User Charge (LLoUC)) mode, (7) RFL (RIC - FR - Lump Sum/Fixed Unit Price O&M Contract (LSOM/FUP)) mode, and (8) RFLL (RIC - FR - LSOM/FUP - LLoUC) mode. Other main findings are as follows: (1) Five risk allocation configurations can be achieved via these price modes. Yet while different price modes enable the allocation of specific risks, these do not always align with contracting parties’ original intentions. (2) IRR and RP modes may be less applicable in general because of their vulnerability in allocating critical risks and capacity for spurring opportunistic behavior.

Originality/value

By depicting the paths by which concessionary items in price modes affect cash flow, a systematic analysis of price modes was conducted exposing structural characteristics, along with risk allocation choice implications. The study is unique in: (1) Providing a systematic classification of PPP price modes used in PPP projects, (2) Presenting a comprehensive identification and streamlining of concessionary items in PPP practice, and (3) Analyzing the risk effects of different price modes. Together, these outcomes offer a hitherto unavailable perspective on PPP project risk management. The value of the study lies in the following: (1) Existing studies employ diverse concessionary items, but their applicability varies. This study offers an overarching framework facilitating decision-making in selecting appropriate PPP price modes and in determining concessionary items. (2) This study adds to the understanding of PPP price modes in significant ways that will aid local governments and potential sponsors in crafting and administrating more workable contract designs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 August 2022

Saba Mani, Navid Ahmadi Eftekhari, M. Reza Hosseini and Javad Bakhshi

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Abstract

Purpose

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Design/methodology/approach

This paper relies on grounded theory and data collection from two case studies – one in the public sector and one in the private sector – and is underpinned by Leavitt’s (1964) sociotechnical model.

Findings

Findings reveal four new dimensions of stakeholder management as being affected through BIM-induced changes: commitment; transparency; learning and experience; and stakeholder satisfaction, with these extending beyond the dimensions recognised in the existing literature. Another novelty lies in bringing to light the highly context-specific nature of BIM-induced changes pertinent to stakeholder management, with the two case studies demonstrating differences in these changes. Furthermore, a theoretical model of the causal impacts of various identified dimensions is presented, in which the sequence of changes and the causal associations between the identified dimensions are conceptualised.

Originality/value

Through Leavitt’s (1964) Diamond lens, the procedure of change and its evolutionary procedure for various components of the sociotechnical system of stakeholder management are theorised. The tentative conceptualisations presented offer a springboard from which to further investigate the episode of change pertinent to various dimensions of stakeholder management in BIM-enabled projects.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords