Article
Publication date: 28 July 2023

Nyamagere Gladys Sospeter

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost…

Abstract

Purpose

The design documents are products of a process that aims to provide sufficient details to enable the contractor to efficiently implement the project at a realistic cost. Accordingly, it is expected that these design documents must be of high quality to engender the attainment of the desired project objectives. The purpose of this study is to analyze the factors that affect the quality of design documentation in construction projects in the context of a developing country.

Design/methodology/approach

This study used a descriptive research design involving professionals from firms offering services in areas of design and documentation, mainly architectural, quantity surveying and engineering. A total of 80 out of 84 questionnaires were received and analyzed using IBM SPSS Statistics Version 25, and a factor analysis approach was used to categorize the factors into smaller five groups.

Findings

The factors were subsequently categorized according to size, time, staff, quality and training-related factors. Collectively, large size of the project, inadequate supervision of junior design staff, low professional fees, procurement process and system, failure to adopt quality management systems and allocation or assigning of staff to more than one project at the same time have high influence (component loading of 700) in respective groups.

Research limitations/implications

The reliance on data to analyze the factors of design documents in construction projects in developing economies context, using a Tanzanian exemplar, is considered a limitation. Developing countries with similar economic characteristics, procurement systems and cultural setup could benefit from the results of this study.

Practical implications

The study of factors affecting quality of design and documents in construction projects serves as a guide for built environment firms in Tanzania in conducting effective business and ensuring quality design documents, hence improved project performance. Understanding the nature of relationship between the design and construction teams as well as the impact of design documents on project performance is of great importance for the design teams of future projects and other decision-makers to pay attention when preparing design and related documents, especially during design stage of construction projects in developing countries.

Originality/value

The study contributes the knowledge by providing useful insights on the subject through a categorization of the factors affecting the quality of design documentation and exploring the nature of relationship between the design and construction teams in construction projects within a previously unexplored Tanzanian context focusing on a traditional procurement system for future improvement of project delivery, hence project success.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 31 May 2022

Naima Benkari

Through a project of cooperation between the Ministry of Heritage and Tourism (MHT) and Sultan Qaboos University (SQU), a team including faculty members, technicians and students…

194

Abstract

Purpose

Through a project of cooperation between the Ministry of Heritage and Tourism (MHT) and Sultan Qaboos University (SQU), a team including faculty members, technicians and students from the SQU department of civil and architectural engineering (CAE), was involved in the project of documentation, survey and the development of management plans of four (4) Omani Vernacular settlements (Harat). Such an experience was meant to initiate students from different levels in undergraduate programs of civil and architectural engineering to the fieldwork and professional practice in the field of built heritage studies. The present research aims to explore the effect of such an experience on the learning process and skills acquired by the involved students.

Design/methodology/approach

The research was undertaken with students of CAE undergraduate programs at SQU. The documentation method has been implemented in 4 different settlements with the same students. A questionnaire has been administered to the participating students after their graduation to collect their feedback regarding the benefits of this experience on their education and skills development. The data was complemented by active observation and semi-directive interviews with some students randomly selected among the respondents to the questionnaire.

Findings

The outcome of each documentation campaign as well as the results of the questionnaires administered revealed that this experience has raised students' awareness about the importance of studying the built heritage and safeguarding it. The research has shown that important soft skills, such as team-working, leadership and communication, have been consolidated. It has also revealed that this experience was an opportunity for students to discover the variety of options within the profession of architecture and its intellectual and ethical responsibilities. Such aspects are hardly grasped when taught within a “classical” teaching/learning setting.

Research limitations/implications

The main limitations of this research were the hard working conditions during the summer in Oman and the direct interaction of the students with the buildings. Even cautious, such interaction represents a risk for an already fragile heritage.

Practical implications

The paper includes a detailed description of the architectural documentation tools and methods used in the case studies. These tools and methods can easily be applicable, with slight adaptations, in other architectural documentation projects involving undergraduate students. The documentation methodology and the generated corpus of 3D digital models can be used in other documentation projects and further studies such as architectural typologies, bioclimatic properties, natural ventilation patterns, daylight performance, etc.

Originality/value

This paper reports on the outcomes of the first experience of its kind in Oman and the Gulf region, where undergraduate students (predominantly females) were involved in an interdisciplinary project for the documentation of important vernacular settlements and their buildings. The added value of this research is that its methodology can be a reference for professors of Architecture and related specialties aiming to integrate research and field work with education.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-1266

Keywords

Open Access
Article
Publication date: 30 March 2021

Christophe Gaie, Bertrand Florat and Steven Morvan

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

2149

Abstract

Purpose

In the present article, the authors tackle the problem of IT documentation, which plays an important role in information technology (IT) project management.

Design/methodology/approach

They provide a simple tool based on five complementary views, which should be detailed by the project team using a classic source code management platform.

Findings

The proposed tool is open source and may be reused by any IT team in various project contexts and heterogeneous development methods.

Originality/value

This research provides an operational framework, which facilitates IT project management and documentation. The framework is open source and may be easily downloaded by any other IT team.

Details

Applied Computing and Informatics, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-1964

Keywords

Article
Publication date: 19 December 2022

Si Yee Tiew

Graduate architect plays an important role in contract implementation management when handling building construction projects. Graduate architects had been authorized to manage…

Abstract

Purpose

Graduate architect plays an important role in contract implementation management when handling building construction projects. Graduate architects had been authorized to manage the projects in construction industry due to limited architects in the country. The capability of graduate architect when manage project is critical in reducing performance barriers encountered. The aim of this paper is to identify critical factors that affect graduate architect's performance during project implementation.

Design/methodology/approach

An explorative study was undertaken to provide an insight into actual experiences of graduate architects in contract implementation management. The data were collected through face-to-face semi-structured interviews providing case studies on contract implementation management on housing projects in Malaysia and observation of the actual on-going projects.

Findings

The five most crucial factors affected graduate architects' performance related to lack of training in project documentation, failed to obtain professional and peer support in quality and assessment, isolate in role during project coordination, lack of education support in design process and unaware of legal aspects which delayed response to contractor.

Research limitations/implications

This research focuses only on seven housing projects and semi-structured interviews with twenty graduate architects who in charge of those projects. As such, the resulting factors that affect graduate architect's performance are limited and are constrained only to the construction industry in Malaysia.

Practical implications

This research examined the factors affecting graduate architect's performance which is a timely study, as the increasing number of population and developments will provide ample opportunities for them to perform.

Originality/value

The outcome of the study is expected to facilitate graduate architects to devise proactive risk mitigation measures to reduce impact of these factors and improve project delivery.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2024

Hakeem A. Owolabi, Azeez A. Oyedele, Lukumon Oyedele, Hafiz Alaka, Oladimeji Olawale, Oluseyi Aju, Lukman Akanbi and Sikiru Ganiyu

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention…

Abstract

Purpose

Despite an enormous body of literature on conflict management, intra-group conflicts vis-à-vis team performance, there is currently no study investigating the conflict prevention approach to handling innovation-induced conflicts that may hinder smooth implementation of big data technology in project teams.

Design/methodology/approach

This study uses constructs from conflict theory, and team power relations to develop an explanatory framework. The study proceeded to formulate theoretical hypotheses from task-conflict, process-conflict, relationship and team power conflict. The hypotheses were tested using Partial Least Square Structural Equation Model (PLS-SEM) to understand key preventive measures that can encourage conflict prevention in project teams when implementing big data technology.

Findings

Results from the structural model validated six out of seven theoretical hypotheses and identified Relationship Conflict Prevention as the most important factor for promoting smooth implementation of Big Data Analytics technology in project teams. This is followed by power-conflict prevention, prevention of task disputes and prevention of Process conflicts respectively. Results also show that relationship and power conflicts interact on the one hand, while task and relationship conflict prevention also interact on the other hand, thus, suggesting the prevention of one of the conflicts could minimise the outbreak of the other.

Research limitations/implications

The study has been conducted within the context of big data adoption in a project-based work environment and the need to prevent innovation-induced conflicts in teams. Similarly, the research participants examined are stakeholders within UK projected-based organisations.

Practical implications

The study urges organisations wishing to embrace big data innovation to evolve a multipronged approach for facilitating smooth implementation through prevention of conflicts among project frontlines. This study urges organisations to anticipate both subtle and overt frictions that can undermine relationships and team dynamics, effective task performance, derail processes and create unhealthy rivalry that undermines cooperation and collaboration in the team.

Social implications

The study also addresses the uncertainty and disruption that big data technology presents to employees in teams and explore conflict prevention measure which can be used to mitigate such in project teams.

Originality/value

The study proposes a Structural Model for establishing conflict prevention strategies in project teams through a multidimensional framework that combines constructs like team power conflict, process, relationship and task conflicts; to encourage Big Data implementation.

Details

Information Technology & People, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0959-3845

Keywords

Article
Publication date: 18 March 2024

Shiv Shakti Ghosh and Sunil Kumar Chatterjee

This study presents a review based research framework that aims to influence memory institutions in their projects on digital storytelling from digitized ancient travel records…

Abstract

Purpose

This study presents a review based research framework that aims to influence memory institutions in their projects on digital storytelling from digitized ancient travel records. This study aims to influence research and policymaking related to design and delivery of services based on memory institutions’ collections of historical records.

Design/methodology/approach

The demonstrated research framework has been synthesized using inputs from a review of existing studies on the domain accompanied by a short survey created for collecting the opinion of selected experts. Studies demonstrating utilization of semantic web technologies and those that can influence policymaking related to digital storytelling were primarily reviewed.

Findings

The core tasks behind digital storytelling vary depending on the project goals. So, a two-part framework had to be proposed that covers the generic fundamental tasks with diverse applicability and digital storytelling related specific tasks separately. Also during the review, it was found that studies demonstrating the use of travel records for digital storytelling were less in number compared to studies using digital storytelling for tourism in general.

Originality/value

The demonstrated research framework can guide memory institutions in exposing their travel-related holdings to a wider audience using innovative semantic web technologies and open up avenues for future empirical research thereby adding to the novelty of the presented research. Also, reviews of articles on digital storytelling or digital humanities in general exist, but, review of digital storytelling initiatives focusing specifically on tourism and travel literature is scarce.

Details

Global Knowledge, Memory and Communication, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2514-9342

Keywords

Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 February 2023

Mostafa Dadashi Haji and Behrouz Behnam

It is a well-accepted note that to enhance safety performance in a project by preventing hazards, recognizing the safety leading indicators is of paramount importance.

Abstract

Purpose

It is a well-accepted note that to enhance safety performance in a project by preventing hazards, recognizing the safety leading indicators is of paramount importance.

Design/methodology/approach

In this research, the relationship between safety leading indicators is determined, and their impacts on the project are assessed and visualized throughout the time of the project in a proactive manner. Construction and safety experts are first interviewed to determine the most important safety leading indicators of the construction industry, and then the relationships that may exist between them are identified. Furthermore, a system dynamics model is generated using the interviews and integrated with an add-on developed on the building information modeling (BIM) platform. Finally, the impacts of the safety leading indicators on the project are calculated based on their time of occurrence, impact time and effective radius.

Findings

The add-on generates a heat-map that visualizes the impacts of the safety leading indicators on the project through time. Moreover, to assess the effectiveness of the developed tool, a case study is conducted on a station located on a water transfer line. In order to validate the results of the tool, a survey is also conducted from the project's staff and experts in the field. Previous studies have so far focused on active safety leading indicators that may result in a particular hazard, and the importance of the effects that safety leading indicators have on another is not considered. This study considers their effects on each other in a real-time manner.

Originality/value

Using this tool project's stakeholders and staff can identify the hazards proactively; hence, they can make the required decisions in advance to reduce the impact of associated events. Moreover, two other potentially contributions of the presented work can be enumerated as: firstly, the findings provide a knowledge framework of active safety leading indicators and their interactions for construction safety researchers who can go on to further study safety management. Secondly, the proposed framework contributes to encouragement of time-based location-based preventive strategies on construction sites.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords