1 – 10 of 323Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…
Abstract
Purpose
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.
Findings
The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.
Originality/value
This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.
Details
Keywords
Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…
Abstract
Purpose
Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.
Design/methodology/approach
A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.
Findings
Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.
Practical implications
The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.
Originality/value
Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.
Details
Keywords
Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…
Abstract
Purpose
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.
Design/methodology/approach
A systematic literature review was conducted to fulfill the purpose of this study.
Findings
The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.
Originality/value
The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.
Details
Keywords
Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…
Abstract
Purpose
Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.
Design/methodology/approach
A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.
Findings
The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.
Originality/value
To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.
Details
Keywords
Kari-Pekka Tampio and Harri Haapasalo
The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…
Abstract
Purpose
The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.
Design/methodology/approach
Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.
Findings
All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.
Practical implications
Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.
Originality/value
This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.
Details
Keywords
Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…
Abstract
Purpose
Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.
Design/methodology/approach
Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.
Findings
Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.
Practical implications
The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.
Originality/value
To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.
Details
Keywords
Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…
Abstract
Purpose
Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.
Design/methodology/approach
The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).
Findings
Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.
Practical implications
The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.
Originality/value
There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.
Details
Keywords
Andrew Ebekozien and Mohamad Shaharudin Samsurijan
Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the…
Abstract
Purpose
Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the long-standing principles adopted to enhance project performance. There is a paucity of studies concerning CI to improve digital technology applications. Thus, this research investigated the relevance and perceived hindrances that may hinder the implementation of CI from promoting digital technologies and proffer ways to improve digital technology applications in the construction sector.
Design/methodology/approach
In Nigeria’s context, this research is exploratory. Twenty-four semi-structured virtual interviews were conducted in Lagos and Abuja, Nigeria, with knowledgeable participants that indicated interest and were interviewed. The engaged interviewees were drawn from government agencies, academicians in construction consultancy, Internet and communication technology experts, construction contracting firms and construction consulting firms. The collected data were coded and analysed through a thematic method.
Findings
Digitalisation of the industry via CI may face some hindrances. The perceived issues that may hinder CI implementation were classified into most severe, severe and fairly severe in Nigeria’s construction industry context. Findings proffer feasible policy solutions that can mitigate these issues and improve digital technology applications in the industry via the CI.
Research limitations/implications
This study covered the relevance and perceived issues that may hinder the implementation of the CI to improve digital technology applications in the industry. Also, the study proffers policy solutions to enhance digital technology applications in the industry via the CI concept.
Practical implications
Findings from this research will support and offer a valuable understanding of the relevance of the “incentivisation concept” to improve digital technology applications in the Nigerian-built environment. Other developing countries with low applications of digital technology in construction may consider the suggested policy solutions from this research. Also, this study will stir policymakers and construction practitioners to support policies tailored towards improving digital technology applications in construction.
Originality/value
This research contributes by exploring the effectiveness of the CI concept and informing construction practitioners and policymakers on how to improve digital technology applications in the Nigerian construction industry.
Details
Keywords
Alan J. McNamara, Sara Shirowzhan and Samad M.E. Sepasgozar
This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study…
Abstract
Purpose
This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study investigates the relationship between the personality dimensions of technology readiness index (TRI) and the system specific factors of technology acceptance model (TAM) within the context of iContracts.
Design/methodology/approach
Drawing insights from the extant literature and the author's previous qualitative investigations into iContract readiness constructs, a quantitative approach is used to operationalise the constructs by offering relevant statements to be measured and validated through a multiple-item scale against the users intent to accept the future iContract technology.
Findings
This study confirms and validates the relationship of the proposed iContract readiness index (iCRI) statements against the established TAM factors by offering 18 new constructs influencing technology readiness of the iContract technology. This study proves 9 of the 12 hypotheses highlighting key factors to be addressed for the successful development of the iContract technology.
Practical implications
This paper contributes to the body of knowledge by proposing a novel iCRI that informs an iContract technology readiness acceptance model (iCTRAM) for a trending technology. The iCTRAM can guide developers in producing an appropriate iContract solution and assess the readiness of users and organisations for the successful adoption of the iContract concept.
Originality/value
This study offers a unique theoretical framework, in an embryonic field, for predicting the success of iContract implementation within construction organisations. This study combines the established studies of TRI and TAM in producing a predictive iContract readiness assessment tool.