Article
Publication date: 2 April 2024

Yixue Shen, Naomi Brookes, Luis Lattuf Flores and Julia Brettschneider

In recent years, there has been a growing interest in the potential of data analytics to enhance project delivery. Yet many argue that its application in projects is still lagging…

Abstract

Purpose

In recent years, there has been a growing interest in the potential of data analytics to enhance project delivery. Yet many argue that its application in projects is still lagging behind other disciplines. This paper aims to provide a review of the current use of data analytics in project delivery encompassing both academic research and practice to accelerate current understanding and use this to formulate questions and goals for future research.

Design/methodology/approach

We propose to achieve the research aim through the creation of a systematic review of the status of data analytics in project delivery. Fusing the methodology of integrative literature review with a recently established practice to include both white and grey literature amounts to an approach tailored to the state of the domain. It serves to delineate a research agenda informed by current developments in both academic research and industrial practice.

Findings

The literature review reveals a dearth of work in both academic research and practice relating to data analytics in project delivery and characterises this situation as having “more gap than knowledge.” Some work does exist in the application of machine learning to predicting project delivery though this is restricted to disparate, single context studies that do not reach extendible findings on algorithm selection or key predictive characteristics. Grey literature addresses the potential benefits of data analytics in project delivery but in a manner reliant on “thought-experiments” and devoid of empirical examples.

Originality/value

Based on the review we articulate a research agenda to create knowledge fundamental to the effective use of data analytics in project delivery. This is structured around the functional framework devised by this investigation and highlights both organisational and data analytic challenges. Specifically, we express this structure in the form of an “onion-skin” model for conceptual structuring of data analytics in projects. We conclude with a discussion about if and how today’s project studies research community can respond to the totality of these challenges. This paper provides a blueprint for a bridge connecting data analytics and project management.

Details

International Journal of Managing Projects in Business, vol. 17 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

457

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 April 2024

Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…

Abstract

Purpose

Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.

Design/methodology/approach

The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.

Findings

The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.

Originality/value

This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 September 2022

Najib AL-Fadhali

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders…

Abstract

Purpose

Construction project stakeholders can have a major effect on delivering projects on time. However, little attempt has been made to address the influence of internal stakeholders on delaying project delivery. This research aims to propose the internal stakeholders' influence as a solution to improving project delivery performance (PDP) in order to boost the value of investment in the construction industry's projects.

Design/methodology/approach

In Yemen, a structured questionnaire was distributed to owners, consultants and contractors, 283 of which were found usable after the data screening. A purposeful sampling technique was used and structural equation modelling (SEM) was adopted for analysis. The structural model was drawn up, based on seven categories of influencing factors: labour, supplier, designer, contractor, consultant, sub-contractor and owner.

Findings

The results of the structural model suggest that of these seven categories, designers, owners, suppliers and subcontractors have a significant p-value and impact on PDP, while the labour and consultant's impact was not substantiated. The findings support the proposal that internal stakeholders' influence contributes directly to construction PDP.

Originality/value

The influence of stakeholders on PDP is important. Nonetheless, few studies have focussed on their effectiveness, especially in developing countries. This paper's contribution is evaluating the cause–effect relationship between stakeholders' influence and construction PDP through analysis of moment structures (AMOS) analysis. The policy implications of the research are to encourage governments in general and construction companies in particular to take responsibility for improving PDP, as slow execution of construction projects leads to increased costs, failure and abandoning projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 April 2024

Karen J. Burnell, Paul Everill, Eva Makri, Louise Baxter and Kathryn Watson

Engaging with heritage to support mental health and wellbeing has become a focus of research and policy, more recently moving towards social prescription of heritage…

Abstract

Purpose

Engaging with heritage to support mental health and wellbeing has become a focus of research and policy, more recently moving towards social prescription of heritage interventions. While there are benefits to active participation, there are potential risks to those taking part and to the non-renewable historic remains and landscape that form the core of these projects. The purpose of the current research paper was to develop best practice guidelines for organisations offering heritage projects as interventions for people who live with mental health issues to protect both participants and heritage.

Design/methodology/approach

There were two research phases; a Sandpit with World Café discussions to produce a set of research priorities, and a Delphi Consultation, using three questionnaires distributed over six months, to develop best practice guidelines. The panel in both phases comprised experts through lived experience, policy, practice and research.

Findings

The Authentic and Meaningful Participation in Heritage or Related Activities (AMPHORA) guidelines cover three stages: project development, project delivery and project follow-up, with a set of action points for each stage. Of particular importance was authentic participation and expertise to ensure appropriate management of heritage/ historic environment assets and support for participants.

Social implications

The AMPHORA guidelines can assist all organisations in the delivery of safe projects that support the mental health of those involved, as well as enhancing and protecting the historic environment.

Originality/value

To the best of the authors’ knowledge, these are the first research-led guidelines that help heritage organisations support those living with mental health issues.

Details

Mental Health Review Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1361-9322

Keywords

Article
Publication date: 13 December 2022

Matthew Osivue Ikuabe, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Donald Chiyangwa and Ayodeji Emmanuel Oke

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to…

Abstract

Purpose

Joint ventures (JVs) serve as a viable tool in mitigating some of the challenges posed to the effective delivery of construction projects. However, JVs are highly susceptible to failure in most developing countries. Therefore, this study seeks to unravel the critical factors influencing the failure of JVs in the South African construction industry.

Design/methodology/approach

A quantitative approach was adopted for the study using a well-structured questionnaire as the instrument for data collection. Respondents for the study were built environment professionals in Gauteng province in South Africa. Data elicited from respondents were analyzed using a four-pronged process which included descriptive statistics, one sample t-test, exploratory factor analysis and confirmatory factor analysis.

Findings

Resulting from the analysis conducted, four critical components emerged as the major factors influencing the failure of JVs in the South African construction industry, which are inefficient financial framework, divergent organizational culture, poor project governance and inadequacies from project stakeholders.

Practical implications

The outcome of this study presents a roadmap for stakeholders in the construction industry with the requisite knowledge of the critical factors leading to the failure of JVs, consequently providing a clear path for the successful delivery of JV mandates.

Originality/value

Evidence from literature suggests that several studies have been conducted on the various aspects of JVs in the South African construction industry; however, none has focused on the leading factors attributed to the failure of JVs. Also, the findings of this study cultivate a good theoretical platform for future studies on JVs.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 27 November 2023

Fran Ackermann, Eunice Maytorena, Carl Gavin and Stuart Forsyth

The aim of this study is to report and reflect on the development of a tailored executive education programme rooted in state-of-the-art research and focused on enhancing and…

Abstract

Purpose

The aim of this study is to report and reflect on the development of a tailored executive education programme rooted in state-of-the-art research and focused on enhancing and embedding project leadership competences in a multi-national project-based organisation.

Design/methodology/approach

Through a detailed description of an example of a leadership development programme, the paper reflects on the learning journey. Drawing on research in management education, leadership and project management competence development, the authors present the rationale, design, delivery and participant and organisational experiences.

Findings

Reflections on the learning journey identify five key points: a) the fundamental role of a programme champion, b) the importance of balancing rigour and relevance in executive education programme design, c) the importance of attending to the milieu of the clientele in terms of culture, demands and where they are in terms of their learning journey, d) the significant role that reflection can play in personal development and e) the competences necessary for project leadership.

Research limitations/implications

This paper reflects on a single programme for a single organisation and is therefore at risk of being idiosyncratic and not generalisable. This is indeed a limitation. However, the authors are all experienced in delivering executive education – and therefore can use those experiences to view the reflections. Many of the considerations noted here resonate with other programmes (both in support and through experience of omission having detrimental effects).

Practical implications

The paper provides new insights into developing enduring and effective leadership competences in complex project management, i.e. one that has a lasting impact on the organisation and is recognised to provide benefits. The reflections on how the authors charted a course and embarked on a journey are deemed of relevance to academics and industry.

Originality/value

The paper provides, for both industry practitioners and academics, new insights into effective leadership development in complex project management, one that has a lasting impact on the individual and the organisation and is recognised to provide benefits.

Details

Journal of Management Development, vol. 43 no. 1
Type: Research Article
ISSN: 0262-1711

Keywords