1 – 10 of over 2000Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh
Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…
Abstract
Purpose
Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.
Design/methodology/approach
In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.
Findings
The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.
Originality/value
System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.
Details
Keywords
Yixue Shen, Naomi Brookes, Luis Lattuf Flores and Julia Brettschneider
In recent years, there has been a growing interest in the potential of data analytics to enhance project delivery. Yet many argue that its application in projects is still lagging…
Abstract
Purpose
In recent years, there has been a growing interest in the potential of data analytics to enhance project delivery. Yet many argue that its application in projects is still lagging behind other disciplines. This paper aims to provide a review of the current use of data analytics in project delivery encompassing both academic research and practice to accelerate current understanding and use this to formulate questions and goals for future research.
Design/methodology/approach
We propose to achieve the research aim through the creation of a systematic review of the status of data analytics in project delivery. Fusing the methodology of integrative literature review with a recently established practice to include both white and grey literature amounts to an approach tailored to the state of the domain. It serves to delineate a research agenda informed by current developments in both academic research and industrial practice.
Findings
The literature review reveals a dearth of work in both academic research and practice relating to data analytics in project delivery and characterises this situation as having “more gap than knowledge.” Some work does exist in the application of machine learning to predicting project delivery though this is restricted to disparate, single context studies that do not reach extendible findings on algorithm selection or key predictive characteristics. Grey literature addresses the potential benefits of data analytics in project delivery but in a manner reliant on “thought-experiments” and devoid of empirical examples.
Originality/value
Based on the review we articulate a research agenda to create knowledge fundamental to the effective use of data analytics in project delivery. This is structured around the functional framework devised by this investigation and highlights both organisational and data analytic challenges. Specifically, we express this structure in the form of an “onion-skin” model for conceptual structuring of data analytics in projects. We conclude with a discussion about if and how today’s project studies research community can respond to the totality of these challenges. This paper provides a blueprint for a bridge connecting data analytics and project management.
Details
Keywords
This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…
Abstract
Purpose
This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.
Design/methodology/approach
The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.
Findings
The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.
Originality/value
The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.
Details
Keywords
Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…
Abstract
Purpose
Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.
Design/methodology/approach
Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.
Findings
The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.
Research limitations/implications
Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.
Originality/value
Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.
Details
Keywords
Eyad Aboseif and Awad S. Hanna
The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to…
Abstract
Purpose
The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.
Design/methodology/approach
Data were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.
Findings
The model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.
Originality/value
The PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.
Details
Keywords
Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini
The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…
Abstract
Purpose
The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.
Design/methodology/approach
The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.
Findings
Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.
Practical implications
The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.
Originality/value
This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation
Details
Keywords
Michael Adesi, Duga Ewuga, De-Graft Owusu-Manu, Frank Boateng and Ernest Kissi
Firms in the architectural, engineering, construction and operations (AECO) sector continue undertaking projects in a disruptive environment due to the coronavirus disease 2019…
Abstract
Purpose
Firms in the architectural, engineering, construction and operations (AECO) sector continue undertaking projects in a disruptive environment due to the coronavirus disease 2019 (COVID-19) pandemic. This study aims to explore environmental turbulence in the AECO project delivery space and suggest mechanisms for enhancing resilience against future pandemics.
Design/methodology/approach
The study adopts the quantitative approach by administering 110 survey questionnaires to participants comprising project managers, site engineers, quantity surveyors, contractors and subcontractors.
Findings
The study identifies 24 COVID-19 disruptions linked to environmental turbulence categorised as scheduling, performance and productivity, project budget, supply chain, resource allocation and technological and regulatory. The study suggested resilient mechanisms for surviving in future pandemics.
Originality/value
This study enhances the understanding of environmental turbulence from the perspective of COVID-19 disruptions in AECO project delivery, while the implementation of the resilient mechanisms improves capability of AECO firms against future pandemics.
Details
Keywords
Dinçer Aydın and Esma Mıhlayanlar
Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery…
Abstract
Purpose
Many parameters influence the success of sustainable projects (SPs) in the architecture–engineering–construction. One of these important parameters is the project delivery attributes (PDA), which are influenced by the project delivery system (PDS) while affecting the selection of it. This study aims to evaluate the significance of PDAs in influencing both the performance and success of SPs in Turkey, where the interest in SPs is high.
Design/methodology/approach
The impact of PDAs was determined by applying the two-round Delphi method with a semistructured interview involving the main stakeholders of a construction project, like owners, designers, contractors and consultants who played active roles in SPs, as well as academics to theoretically evaluate the issue. The significance of PDAs was assessed using the relative importance index, and the results were validated using the interrater agreement analysis.
Findings
The study identified key PDAs impacting SPs as owner character, commitment and motivation; simulation and energy modelling; and timing of stakeholders/early involvement.
Originality/value
The investigation of the significance of the PDAs is a lesser-studied context. Therefore, a research framework that enables an effective set of methods for solving the sectoral problems of PDAs that have impacts on SPs has been proposed. The framework is expected to open new opportunities for the generation and regulation of the PDSs for SPs. The findings will provide valuable insights to project stakeholders, particularly owners, local authorities and policymakers to assess which PDAs have a greater impact on sustainability performance when setting PDSs in SPs in other developing countries.
Details
Keywords
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa and Aparna Samaraweera
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities…
Abstract
Purpose
Offsite construction (OC) is an efficient method to reduce waste in the construction industry from a circular economy perspective. Yet, its uptake is subdued by the ambiguities around its supply chain. Hence, the purpose of this study is twofold: to identify the OC project delivery models, the limitations in their procurement approach to facilitate the resilience of the supply chain and interventions to promote supply chain resilience (SCR) and to identify the gaps in the existing procurement process and propose further research areas that implement strategies to improve SCR.
Design/methodology/approach
The study was conducted as a systematic literature review. In total, 41 peer-reviewed research papers published between 2013 and 2023 were shortlisted through the preferred reporting items for systematic reviews and meta-analysis guidelines. A descriptive analysis was conducted, followed by a thematic analysis.
Findings
The descriptive analysis reveals that the emphasis on digitising OC has shifted to transforming the business model, procurement and supply chain with a human-centric view. In thematic analysis, the predictability of the SC partners and the probabilities of evaluating the prospects are revealed as arbitrary characteristics in the current procurement strategies. Rewarding collaborative relationships among SC partners and incorporating provisions to postpone the module delivery are some interventions to promote flexibility. Drafting comprehensive and effective contracts that address transparency issues and facilitating the need for continuous development of capabilities through procurement are among the further research avenues proposed.
Originality/value
This study is a precursor demonstrating the potential of the procurement process to implement the decrees of SCR for better goal congruence of the OC supply chain.
Details
Keywords
Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…
Abstract
Purpose
Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.
Design/methodology/approach
Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.
Findings
Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.
Originality/value
The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.