Publication date: 13 October 2022

Christian Nnaemeka Egwim, Hafiz Alaka, Eren Demir, Habeeb Balogun and Saheed Ajayi

This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling…

1662

Abstract

Purpose

This study aims to develop a comprehensive conceptual framework that serves as a foundation for identifying most critical delay risk drivers for Building Information Modelling (BIM)-based construction projects.

Design/methodology/approach

A systematic review was conducted using Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) to identify key delay risk drivers in BIM-based construction projects that have significant impact on the performance of delay risk predictive modelling techniques.

Findings

The results show that contractor related driver and external related driver are the most important delay driver categories to be considered when developing delay risk predictive models for BIM-based construction projects.

Originality/value

This study contributes to the body of knowledge by filling the gap in lack of a conceptual framework for selecting key delay risk drivers for BIM-based construction projects, which has hampered scientific progress toward development of extremely effective delay risk predictive models for BIM-based construction projects. Furthermore, this study's analyses further confirmed a positive effect of BIM on construction project delay.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 21 May 2018

Parvaneh Shahsavand, Akbar Marefat and Majid Parchamijalal

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and…

45448

Abstract

Purpose

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project.

Design/methodology/approach

This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors.

Findings

In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule.

Originality/value

All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 November 2015

Pablo Ballesteros-Pérez, Maria Luisa del Campo-Hitschfeld, Manuel Alejandro González-Naranjo and Mari Carmen González-Cruz

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The…

10092

Abstract

Purpose

Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study.

Design/methodology/approach

By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed.

Findings

Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate.

Research limitations/implications

Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries.

Practical implications

The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays.

Originality/value

Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Details

Engineering, Construction and Architectural Management, vol. 22 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…

2826

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Content available
Article
Publication date: 10 June 2021

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq and Muneeb Afzal

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on…

4059

Abstract

Purpose

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE).

Design/methodology/approach

This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal.

Findings

The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic.

Research limitations/implications

The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research.

Practical implications

The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE.

Originality/value

This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Content available
Book part
Publication date: 26 April 2017

Prince Boateng, Zhen Chen and Stephen O. Ogunlana

Abstract

Details

Megaproject Risk Analysis and Simulation
Type: Book
ISBN: 978-1-78635-830-1

Open Access
Article
Publication date: 13 May 2022

Saleh Alsulamy

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants'…

2820

Abstract

Purpose

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage.

Design/methodology/approach

Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study.

Findings

The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Research limitations/implications

Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages.

Originality/value

The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

13754

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 14 May 2020

Ulrika Uotila, Arto Saari and Juha-Matti Junnonen

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study…

1900

Abstract

Purpose

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study school will increase in the following years, as will the number of children attending a day nursery located on the present campus. In addition, the users of the campus have complained of building-related symptoms. This study aims to understand the municipal decision-making process in organising the school’s facilities, in particular, the factors used for decreasing uncertainty around a project.

Design/methodology/approach

This study is a case study undertaken through an action research approach. The researchers participated in the project planning meetings concerning the future activities to take place in the building.

Findings

Over a 13-month period, multiple stakeholders participated in the project planning meetings providing a deeper understanding of the space demands posed, current challenges and opportunities offered by the existing building. In addition, the alternative solutions generated were evaluated. The problem identification and information gathering periods lasted over nine months, which was far longer than predicted. Thus, generating alternative solutions and evaluation of the solutions also delayed. As the entire process was delayed substantially, the final decision on organising the facilities was not made during this research.

Practical implications

This research may be of practical value for a property owner and a project team for decision-making concerning changed facility demands.

Originality/value

This paper provides information about how public authorities are making decisions on facility organisation during conditions of uncertainty.

Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5202

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords