Article
Publication date: 19 January 2024

Mohamed Elkbuli, Nurhidayah Azmy and Chia Kuang Lee

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success…

Abstract

Purpose

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success because of their vital role. Therefore, this study aims to explore the profound influence of project managers’ soft communication skills on successful risk management within Libya’s oil and gas projects.

Design/methodology/approach

A review of relevant literature and a quantitative approach through the administration of a questionnaire were used to determine factors impacting risk management implementation related to managerial communication skills. A total of 246 valid responses were received from the oil and gas companies in Tripoli, Libya. Partial least squares structural equation modelling was used to examine the direct and moderating relationship drawn by the hypotheses.

Findings

The findings suggest that managerial soft skills may be used to improve continuous risk management processes and intra-project communication. It was found that the experience is strengthening the positive relationship between written communication soft skills and project risk management implementation among Libyan oil and gas construction projects.

Originality/value

This study defines project managers’ soft communication skills and analyzes project managers’ soft communication skills with the role of experience as a moderator. This paper presents a valuable contribution by offering original insights tailored explicitly to the Libyan context. The information presented in this paper is relevant to project managers operating within the oil and gas industry. It also offers a novel approach to risk management in the Libyan oil and gas industry that can improve project efficiency and effectiveness.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 August 2023

Haiyan Xie, Ying Hong, Mengyang Xin, Ioannis Brilakis and Owen Shi

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish…

Abstract

Purpose

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish effective information-exchange strategies.

Design/methodology/approach

The recent publications on construction communication about time management are reviewed. Then, the semi-structured interviews are performed with both questionnaires and audio recordings (n1 = 18). Next, the collected data are analyzed using both statistical measures on the questionnaire survey and qualitative coding analysis on the text transcripts from an audio recording. Particularly, the identified barriers are substantiated using a scientometrics approach based on the published articles (2011–2020, n2 = 52,915) for purposeful information-sharing solutions in construction time management. Furthermore, the intervention strategies from the top 10 most-cited articles are analyzed and validated by comparisons with the results from construction surveys and relevant studies.

Findings

Based on the discussed communication difficulties, five main barriers were identified during time-cost risk management: probability and statistical concepts, availability of data from external resources, details of team member experiences, graphics (and graphical presentation skills), and spatial and temporal (a.k.a. 4D) simulation skills. For the improvement of communication skills and presentation quality regarding probability and statistical concepts, project teams should emphasize context awareness, case studies and group discussions. Details of communication techniques can be adjusted based on the backgrounds, experiences and expectations of team members.

Research limitations/implications

The dataset n1 has both size and duration limits because of the availability of the invited industry professionals. The dataset n2 considers the literature from 2011 to 2020. Any before-the-date and unpublished studies are not included in the study.

Practical implications

A thorough comprehension of communication barriers can help project teams develop speaking, writing and analytical thinking skills that will enable the teams to better deliver ideas, thoughts and meanings. Additionally, the established discussion on barrier-removal strategies may enhance time management effectiveness, reduce project delays, avoid confusion and misunderstanding and save rework costs.

Social implications

This research calls for the awareness of communication barriers in construction project execution and team collaboration. The identified barriers and the established solutions enrich the approaches of construction companies to share information with communities and society.

Originality/value

This is the first identification model for communication barriers in the time management of the construction industry to the authors' knowledge. The influencing factors and the countermeasures of communication difficulties highlighted by the research were not examined systematically and holistically in previous studies. The findings provide a new approach to facilitate the development of powerful communication strategies and to improve project execution.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 January 2023

Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, Norsuzailina Mohamed Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid and Noor Md. Sadiqul Hasan

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Abstract

Purpose

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Design/methodology/approach

This study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.

Findings

The factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.

Practical implications

The construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.

Originality/value

Though some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 25 August 2023

Sepani Senaratne, Abhishek KC and Siryana Rai

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from…

Abstract

Purpose

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.

Design/methodology/approach

This research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.

Findings

Every case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.

Originality/value

This research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 June 2023

Anita Cerić and Ivona Ivić

As climate change has become a growing concern, sustainable development has become increasingly important. Emissions reduction is a key step for more efficient energy use. In the…

Abstract

Purpose

As climate change has become a growing concern, sustainable development has become increasingly important. Emissions reduction is a key step for more efficient energy use. In the last few years, the residential building sector in Croatia has received financial support for multi-dwelling building energy efficiency retrofits (EERs). However, some of these projects encountered difficulties due to information asymmetry between the key participants. This study aims to address the problem from the perspective of the principal-agent theory, which is concerned with information asymmetry and the asymmetry's repercussions.

Design/methodology/approach

A social network analysis is conducted to reflect the operation and management (OM) details of Croatian multi-dwelling buildings. The key stakeholders of EER are mapped, along with the contractual and communication ties between them. Using the Gephi software, relationship data are visually represented and statistically evaluated.

Findings

The analysis indicated two different clusters or groups of stakeholders in EERs in Croatia and enabled the mapping of key relationships between stakeholders. The findings stress the importance of the key relationship between owner representatives (ORs) and property managers (PMs).

Originality/value

The contribution of this study is the development of framework for blockchain implementation in EERs, which can be adapted for use in different markets and/or projects. Blockchain is proposed for minimization of information asymmetry between different stakeholders. Blockchain enables communication and cooperation during project development and enhances trust among stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 July 2022

Ayman Ahmed Ezzat Othman and Ahmed Ramadan Kamal

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Abstract

Purpose

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Design/methodology/approach

A research methodology consisting of literature review, case studies and survey questionnaire was designed to achieve the above-mentioned aim. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI in the design process in ADFs in Egypt.

Findings

Through literature review, the research highlighted the relationship between ESI and enhancing building maintainability and identified the roles, benefits, challenges and that encounter ESI in ADFs, factors for suppliers selection and levels of involvement. Results of the data analysis showed that “Difficulty of trusting external parties and sharing information with transparency” was ranked the highest challenge of ESI in ADFs in Egypt, followed by “Legal competitive advantage restrictions”. Moreover, “Better estimation for operation and maintenance costs” was ranked the highest contributions of ESI towards enhancing building maintainability, followed by “Reduce the number of operation and maintenance problems or reworks”. Finally, respondents stated that “Innovation, technical expertise, and competence” was ranked the highest supplier’s selection criteria, while “paying consultation fees for offering advice and recommendations to the design team” was ranked the highest form of supplier’s remuneration.

Research limitations/implications

The proposed framework contributes to the body of knowledge through proposing five functions that aimed to facilitate ESI in the design process, a research area that received scant attention in construction research. In addition, because of the conceptual nature of the framework, it has to be validated to ensure its capability to overcome the challenges of ESI as an approach for enhancing building maintainability during the design process.

Practical implications

This research presents a practical solution that bridges the gap between theory and practice through overcoming the challenges that obstruct suppliers from being involved in the design process as an approach for enhancing building maintainability.

Originality/value

This research discussed the relationship between ESI and enhancing building maintainability as well as the roles, benefits and challenges that encounter ESI in ADFs. In addition, the research investigated the levels of suppliers’ involvement, selection criteria and forms of payment. Moreover, it investigated the perception and application of ESI in ADFs in Egypt towards improving building maintainability. The research proposed a framework to facilitate the integration of suppliers in the early stages of the project life cycle. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 January 2023

An Thi Hoai Le and Monty Sutrisna

This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the…

Abstract

Purpose

This paper reports the developments of a project cost control system (PCCS) for construction projects to (1) measure its current level of cost control maturity, (2) examine the relationships between elements within PCCS processes and (3) identify improvement areas.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and partial least squares structural equation modelling (PLS-SEM) to measure the current maturity level of PCCS and evaluate the relationships between elements within PCSS to identify improvement areas. Further importance-performance matrix analysis (IPMA) of priority constructs was conducted to improve a target construct and identify the most important areas of specific actions at indicator levels. The results of IPMA revealed the contrast that has the greatest importance on the performance of others so that the recommendations can be made accordingly. Data collected in New Zealand were used to develop the research model.

Findings

This study develops structural and measurement models with the constructs including pre-control, in-control and post-control processes, enablers and their proposed interrelationships. Then, data from survey of 184 experienced project cost control team members reveal that post-control has the lowest maturity or weakest areas in the PCCS. Data analysis facilitated by PLS-SEM confirmed that all the constructs in the structural model have positive and significant relationships with each other and suggested that systematic cost analysis reports, communication, skills and experience, defining roles and responsibilities, and top management's support should be the highest priority for improving the PCCS in a more effective manner.

Originality/value

This study presents one of the earliest attempts to develop and test an integrated model that links sub-processes in PCCS and their enablers. Secondly, this research adds to the construction project management literature by empirically verifying the roles of enablers in enhancing maturity level of PCCS.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Justice Williams, Frank Fugar, Emmanuel Adinyira and Kofi Agyekum

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This…

Abstract

Purpose

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This study aims to explore channels by which construction companies can effectively communicate health and safety (H&S) among communities of their operations.

Design/methodology/approach

Based on a quantitative research approach, this study addressed the knowledge gap through a cross-sectional survey of 250 contractors (comprising 155 building and 95 road contractors) involved in various projects in the Ghanaian construction industry. These contractors were selected by using a stratified simple random sampling technique. Data obtained from the survey was analysed through descriptive (i.e. frequencies, mean and standard deviation) and inferential (i.e. exploratory factor analysis) statistical analyses.

Findings

The findings from the mean scores revealed that all the 12 communication channels identified in the literature, confirmed through piloting and examined by the respondents, were important channels through which construction companies can effectively communicate H&S amongst communities of their operations. The exploratory factor analysis revealed a clustering of the 12 channels of communication into 5 components: “safety demonstration in the community”; “social media”; “mass media”; “community engagement”; and “opinion leaders”.

Research limitations/implications

This study offers construction project managers the means of managing one of the major stakeholders of a construction project (the community). It provides an actionable opportunity that can be leveraged strategically to integrate community members into projects to promote synergy and local content inclusion while gaining a peaceful atmosphere to achieve their project goals.

Practical implications

Practically, this study provides construction project managers with a means of managing one of the major stakeholders of a construction project (the community) and also demonstrates the integration of community members into projects to promote synergy and local content inclusion. This would give construction organisations a peaceful atmosphere to accomplish their project objectives.

Social implications

The social implication of this study is that the study offers society a means of creating safer Ghanaian communities by offering them the knowledge of identifying hazards and avoiding risky behaviours, creating a good safety atmosphere in these communities.

Originality/value

This study presents construction organisations with a unique opportunity to transfer and share novel external knowledge within a different social system (the community). It contributes to the state-of-the-art knowledge in H&S communication by providing channels through which H&S can be communicated in a developing country such as Ghana.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 September 2023

Kangning Liu, Bon-Gang Hwang, Jianyao Jia, Qingpeng Man and Shoujian Zhang

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus…

Abstract

Purpose

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus disease 2019 (COVID-19) pandemic, social media-enabled online knowledge communities play an increasingly important role in acquiring and disseminating off-site construction knowledge. Proximity has been identified as a key factor in facilitating interactive learning, yet which type of proximity is effective in promoting online and offline knowledge exchange remains unclear. This study takes a relational view to explore the proximity-related antecedents of online and offline learning networks in off-site construction projects, while also examining the subtle differences in the networks' structural patterns.

Design/methodology/approach

Five types of proximity (physical, organizational, social, cognitive and personal) between projects members are conceptualized in the theoretical model. Drawing on social foci theory and homophily theory, the research hypotheses are proposed. To test these hypotheses, empirical case studies were conducted on two off-site construction projects during the COVID-19 pandemic. Valid relational data provided by 99 and 145 project members were collected using semi-structured interviews and sociometric questionnaires. Subsequently, multivariate exponential random graph models were developed.

Findings

The results show a discrepancy arise in the structural patterns between online and offline learning networks. Offline learning is found to be more strongly influenced by proximity factors than online learning. Specifically, physical, organizational and social proximity are found to be significant predictors of offline knowledge exchange. Cognitive proximity has a negative relationship with offline knowledge exchange but is positively related to online knowledge exchange. Regarding personal proximity, the study found that the homophily effect of hierarchical status merely emerges in offline learning networks. Online knowledge communities amplify the receiver effect of tenure. Furthermore, there appears to be a complementary relationship between online and offline learning networks.

Originality/value

Proximity offers a novel relational perspective for understanding the formation of knowledge exchange connections. This study enriches the literature on informal learning within project teams by revealing how different types of proximity shape learning networks across different channels in off-site construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988