Search results

1 – 10 of over 4000
Book part
Publication date: 30 April 2024

Paul J. Jackson, Nicolette Michels, Jonathan Louw, Lucy Turner and Andrea Macrae

This chapter contributes to the scholarship of teaching and learning in extracurricular enterprise and entrepreneurship education. It draws on research from two annual ‘Business…

Abstract

This chapter contributes to the scholarship of teaching and learning in extracurricular enterprise and entrepreneurship education. It draws on research from two annual ‘Business Challenge Weeks’ (BCW) held at Oxford Brookes University in 2021 and 2022, in which teams of postgraduate students from three faculties worked on external client projects, supported by an academic mentor. It presents and discusses findings derived from a survey and interviews conducted after the second of these years. The chapter takes a transdisciplinary perspective, after Budwig and Alexander (2020), Piaget (1972) and Klein et al. (2001) and explores the relationship between this and the enterprise and entrepreneurship development pipeline set out by QAA (2018). It analyses the experiences of the three main participating groups engaged in the challenge weeks – students, external clients and academic mentors – and explores the organising challenges inherent in multiparty pedagogical initiatives. The chapter contributes to knowledge in this area by revealing and reflecting on the motivations and expectations of the three participant groups, the roles they played during the week and the outcomes they reported. It also expands understanding of transdisciplinary enterprise pedagogy.

Details

Extracurricular Enterprise and Entrepreneurship Activity: A Global and Holistic Perspective
Type: Book
ISBN: 978-1-80382-372-0

Keywords

Article
Publication date: 30 May 2023

Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…

Abstract

Purpose

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.

Design/methodology/approach

The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.

Findings

Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.

Practical implications

The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.

Originality/value

This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Details

Facilities , vol. 41 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 18 September 2023

Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru and Maxwell Fordjour Antwi-Afari

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent…

Abstract

Purpose

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects.

Design/methodology/approach

A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach.

Findings

Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction.

Research limitations/implications

The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers.

Practical implications

The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods.

Originality/value

Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 21 April 2023

Salem Buhashima Abdalla, Emad Mushtaha, Mamun Rashid, Alex Opoku, Rawan Hamad, Fikri Dweiri and Abbas Elmualim

This paper aims to identify the pre-design critical success factors CSFs pertaining to different types of construction projects in the rapidly growing city of Dubai, by adopting…

Abstract

Purpose

This paper aims to identify the pre-design critical success factors CSFs pertaining to different types of construction projects in the rapidly growing city of Dubai, by adopting one of the multi-criteria decision-making (MCDM) tools, analytic hierarchy process (AHP).

Design/methodology/approach

A mapping process was utilized to filter and categorize CSFs gathered from a literature review. A total of 5 main and 27 sub-main criteria were derived following RIBA's Plan of Work 2020 (Royal Institute of British Architects). A questionnaire was distributed among experts in the construction industry to assess the development in vicinity of the Sheikh Zayed Road (SZR). An analysis was conducted to prioritize the CSFs as per experts' judgment.

Findings

According to the experts' combined judgment, CSFs linked to client requirements (CR) are the most significant at 22.9% priority weight. Overall project review (OPR), project team (PT), project preparation (PP), previous projects feedback and experience (PPF) success factors achieved 21.4, 19.5, 18.9 and 17.2%, respectively. Within CR, sub-CSFs of client consultation and acceptance (CCA), responsibly matrix for stakeholders (RM), client track record (CTR) and client level of service (CLS) were prioritized by the experts.

Research limitations/implications

This work was carried out by respondents based in UAE only, and focused on one urban stretch of Dubai, this could be replicated by employing experts from other countries and other case study areas within Dubai.

Practical implications

This study would significantly have an impact on the education of current and future project managers, planners, engineers, architects and, most importantly, decision-makers on helpful pre-design strategies for enhancing their project success. This research could assist, direct and educate management, as the management provides/manages the necessary resources for projects. Furthermore, management also has the authority to choose project leaders/consultants that will make the project successful.

Social implications

Consolidating Dubai's phenomenal growth requires prioritizing socio-economic strategies in future development projects at the pre-design and pre-construction stage, which will improve the city's business environment and the quality of life for Dubai's residents. This opens up fresh possibilities over the next few years for integrating robust procedures for successful execution, monitoring and evaluation of future construction developments from the outset.

Originality/value

Although many studies have identified various factors as important for successful building projects, few appear to have done a complete analysis using pre-design criteria to systematically categorize professional views on the relative relevance of CSFs. There is a lack in research examining the factors that led to Dubai's successful construction projects. This study attempts to bridge this gap and provide a prioritized framework reference model to assist project/asset managers and decision-makers.

Details

Built Environment Project and Asset Management, vol. 13 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2022

Ayman Ahmed Ezzat Othman and Yomna Abdelghany El-Saeidy

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design…

Abstract

Purpose

The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process.

Design/methodology/approach

A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to examine their perception and application of ESI towards reducing CW generated during the design process. Based on the results of the above, the research developed a framework to facilitate ESI during the design process to reduce CW.

Findings

Through literature review, the research highlighted the causes of CW generated during the design process and identified the benefits and challenges that encounter ESI in ADFs. Results of data analysis showed that “last-minute changes due to client requirements” was ranked the highest challenges of ESI in ADFs in Egypt followed by “lack of design experience”. Moreover, “providing technical information about materials and equipment and their capabilities” was ranked by respondents as the highest contributions of suppliers during the design process which leads to waste reduction followed by “better estimation of materials and costs”. Finally, respondents stated that “resistance of ADFs to include suppliers in the design phase” was ranked the highest challenge of ESI in the design process followed by “no clear guidelines or policies that organise ESI”.

Research limitations/implications

Because of the conceptual nature of the proposed framework, it has to be tested and validated to ensure its capability to overcome the challenges of ESI as an approach for reducing CW generated during the design process.

Practical implications

This research presents a practical solution to the problem of CW generated during the design process through ESI.

Originality/value

The research discussed the causes of CW originated from the design process and the benefits and challenges of ESI in ADFs. It investigated the perception and application of ESI in ADFs in Egypt. The proposed framework which was designed to facilitate the integration of suppliers in the early stages of the project life cycle represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 17 February 2023

Aparna Datey

This paper describes the curriculum design of an architectural studio course aimed at making concepts of sustainability accessible, understandable and practicable to second-year…

Abstract

Purpose

This paper describes the curriculum design of an architectural studio course aimed at making concepts of sustainability accessible, understandable and practicable to second-year undergraduate students. Architectural education and design pedagogy is shaped and interrogated in the Global North or Western Europe and North America and influences various pedagogical approaches in the Global South. By including exemplars, voices and practices from global, historical, vernacular and contemporary contexts, understanding of sustainability is enriched.

Design/methodology/approach

The approach to course design included decolonising the curriculum and making it relevant for globally diverse future professionals. The studio theme of “memory and history” was framed as responsiveness to context and experiencing the site. Students were required to define place, and articulate form and space with sensitivity towards social, cultural, environmental and ecological aspects. The lectures, exercises and interactive activities emphasised design process, in-progress work, and experimentation through sketching, diagramming, drawing, and making study models which scaffolded student learning under the guidance of tutors.

Findings

The findings show that to make the process of learning to design in an environmentally responsive manner explicit for students, approaches to curriculum design must have a global and inclusive curriculum, engage students in experiential learning through doing/making to develop critical thinking skills, encourage students to synthesise and transfer learning to and from other settings and contexts, and interpret knowledge-power relationships and co-construction processes embedded in studio-based teaching and learning.

Originality/value

The original contribution of the course is that it creates an inclusive, experimental and decolonised space for co-construction of knowledge about designing sustainable environments.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. 17 no. 3
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 15 April 2022

Quan Phung, Bilge Erdogan and Yasemin Nielsen

The paper aims to identify core components for managing sustainability in construction-building projects and to understand how these components support each other to achieve…

1145

Abstract

Purpose

The paper aims to identify core components for managing sustainability in construction-building projects and to understand how these components support each other to achieve project success. It proposes a model for sustainable project management (SPM) to achieve sustainable project success (SPS).

Design/methodology/approach

The research utilised structural equation modelling to empirically test the conceptual model and the hypotheses associated to the 35 project-management related success factors and 24 performance criteria identified in literature review. Data was collected through 143 questionnaires carried out with construction professionals who have minimum two years' experience in sustainable building projects across the UK. Mediation analysis was used to identify the inter-relationships between the variables and components in the model.

Findings

The paper developed a model for SPM which consists of five components: (1) sustainability goal definition, (2) project team enhancement toward sustainability, (3) planning for sustainability, (4) sustainability assessment and (5) stakeholder management. Stakeholder management and sustainability goal definition were found to have a significant and direct impact to the achievement of SPS. The other three were found to generate an indirect but important impact on the SPS. The results showed that attention should be paid to all five components to fully support the development of sustainability in projects.

Research limitations/implications

Regarding the research approach, the generalisation of this research's findings is limited to the construction industry in the UK and similar developed countries.

Originality/value

This paper provides a further understanding of the inter-related effects of SPM and their impact on SPS.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 February 2024

Ilkka Tapani Ojansivu

This study aims to focus on a specific project marketing concept, i.e. “discontinuity,” and analyzes how this concept emerged in project marketing, becoming its key scholarly…

Abstract

Purpose

This study aims to focus on a specific project marketing concept, i.e. “discontinuity,” and analyzes how this concept emerged in project marketing, becoming its key scholarly embodiment, how it became decoupled from the increasingly service-intensive project business practice and what the relevance of discontinuity is for project marketers moving forward.

Design/methodology/approach

This study is built on a systematic literature review of 31 years (1993–2023) of publishing data from major marketing and management journals.

Findings

This study provides three findings. First, the author reveals the risks related to marketing scholars and practitioners losing sight of each other as business practices evolve much faster than scholarly research can keep up. Second, the author highlights the role of interdisciplinary collaboration in advancing conceptual innovations. Finally, the research elucidates the need for broader metatheoretical reflection to keep this research tradition on an upward trajectory.

Research limitations/implications

The aim of this study is not to criticize project marketing, as many strands of business-to-business (B2B) marketing face the same challenge, but to elucidate a need for conceptual innovations, collaboration with practitioners and other disciplines and broader metatheoretical reflection to keep this research tradition on an upward trajectory.

Originality/value

This study makes several contributions to the project marketing research tradition. First, it reviews the emergence and dissipation of the concept of discontinuity, drawing on semantical, etymological and epistemological insights. It also reflects on recent disruptions in the marketplace and envisions future research trajectories for this elusive concept. In addition, the author develops a conceptual framework that combines project types with exchange elements in project and service businesses. This conceptual framework helps elucidate what part of the exchange is continuing and what is discontinuing in the resulting business relationships. Furthermore, the research contributes to B2B marketing more broadly by highlighting the fleeting correspondence between theory and the real world. It underscores the need for constant updates to maintain relevance.

Details

Journal of Business & Industrial Marketing, vol. 39 no. 3
Type: Research Article
ISSN: 0885-8624

Keywords

Article
Publication date: 15 June 2023

Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…

Abstract

Purpose

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.

Design/methodology/approach

In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.

Findings

The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.

Originality/value

System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 4000