Article
Publication date: 18 September 2023

Stephanie Sheamar, Gayan Wedawatta, Maheshi Tennakoon, Roshani Palliyaguru and Maxwell Fordjour Antwi-Afari

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent…

Abstract

Purpose

Cost overrun is a significant issue in construction, an undesirable feature the industry has long been associated with. Poor procurement practices are often blamed for subsequent cost overruns in construction, especially with conventional procurement methods leading to outrageous cost overruns. The purpose of this study is to review the features of the new models of construction procurement (NMCP) and assess their potential to reduce cost overruns in construction projects.

Design/methodology/approach

A literature review was conducted to identify the issues of procurement leading to cost escalations. Primary data were obtained through exploratory, semi-structured interviews using a case study approach.

Findings

Clients’ lack of knowledge was highlighted as a key issue in procurement that interlinks with many factors causing cost escalation. The findings suggest that the features contained within the NMCP, such as early contractor involvement and collaboration throughout the project team, have the potential to make a positive contribution to addressing cost escalation in construction.

Research limitations/implications

The primary research was undertaken as an exploratory study and presents the contractor's perspective. Further research is therefore suggested, with multiple organisations representing all key stakeholders in a construction project, including clients, consultants, sub-contractors and suppliers.

Practical implications

The study recommends awareness of the NMCP be raised throughout the industry, and simplified information must be made available to help widen uptake of these contemporary procurement methods.

Originality/value

Addressing the dearth of research concerning the use of NMCP within the industry, this study makes a niche contribution to the body of knowledge on construction cost management by illustrating the potential offered by these new procurement methods for addressing cost escalation. For an industry where collaboration is accepted with reservations, this case study demonstrates how novel collaborative strategies such as open book costing, project bank accounts and shared pain and gain mechanisms can be implemented as part of the procurement strategy and how such strategies can contribute towards minimising the cost escalation inherent in construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2023

Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…

Abstract

Purpose

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.

Design/methodology/approach

In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.

Findings

The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.

Originality/value

System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 April 2024

Annisa Ummihusna, Mohd Zairul, Habibah Ab Jalil and Puteri Suhaiza Sulaiman

Challenges of conducting site visit activities, a vital component of architecture learning during the recent pandemic have proved our unreadiness in facing the digital future. The…

Abstract

Purpose

Challenges of conducting site visit activities, a vital component of architecture learning during the recent pandemic have proved our unreadiness in facing the digital future. The lack of understanding of learning technology has affected the education experience. Thus, there is a need to investigate immersive learning technology such as immersive virtual reality (IVR) to replace students’ concrete experience in the current learning setting. This study aims to answer: (1) What is the influence of IVR in experiential learning (EL) in enhancing the personal spatial experience? (2) Does IVR in EL influence students' approach to learning during the architecture design process?

Design/methodology/approach

The research was conducted as an action research design approach. Action research was employed in the first-year architecture design studio by the lecturer as a practitioner-researcher. The personal spatial experience survey was performed in the earlier phase to identify the students’ prior spatial experience. Architectural Spatial Experience Simulation (ASES) a learning tool was implemented and assessed with Architecture Design Learning Assessment (ADLA) rubric, which was developed to evaluate EL and student’s approach to learning during the architecture design learning process.

Findings

The outcomes revealed that ASES as a learning tool in EL could improve the participants’ spatial experience, particularly those with minimal prior personal spatial experience. ASES was recognized to enhance the participants’ EL experience and encourage changes in student’s approach to learning from surface to deep learning.

Originality/value

This research benefits the architecture design learning process by offering a learning tool and a framework to resolve challenges in performing site visit activities and digital learning. It also contributes by expanding the EL theory and students’ approach to learning knowledge in the architecture education field.

Details

Journal of Applied Research in Higher Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-7003

Keywords

Article
Publication date: 9 October 2023

Mohammad A. Hassanain, Mahmoud A. Zourob and Ahmed M. Ibrahim

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of…

Abstract

Purpose

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of facilities managers and consultants’ practices.

Design/methodology/approach

A literature review was undertaken to determine the different tasks that facilities managers typically handle, identify project phases and their underlying activities in which facilities managers would be involved. This was followed by targeting a group of consultants to build a consensus, upon the identified involvement of facilities managers, over the PLP, while measuring the level of involvement from a representative group of facilities managers in Saudi Arabia. A matching between the perceptions and practice has been performed to serve as recommendations for future research on improving the practice in Saudi Arabia.

Findings

The involvement of facilities managers in the PLP is relatively low, according to the consultants’ perceptions. Consultants perceive that facilities managers should be involved in more professional activities, which would ultimately improve projects’ delivery to clients.

Practical implications

The involvement of facilities managers over the PLP ensures effective delivery of projects and reduces the multiplicity of challenges at the operation and maintenance phase. The viewing of facility managers’ involvement adds to the effectiveness of their role within the building industry.

Originality/value

This paper investigates the consultants’ perception of the involvement venues for facility managers to perform activities which are evaluated to be “mandatory,” “advantageous” or “not necessary.” The study reflects the state of facilities management practice, and the consensus of consultants toward the role of the facility managers through the PLP.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 27 November 2023

Christina O'Connor and Gillian Moran

Integrated marketing communications (IMC) is possibly “the richest and most accessible service-learning experience” in the marketing curriculum (Petkus, 2000, p. 68). Yet, despite…

Abstract

Purpose

Integrated marketing communications (IMC) is possibly “the richest and most accessible service-learning experience” in the marketing curriculum (Petkus, 2000, p. 68). Yet, despite this recognition, scholars and practitioners continue to lament the pronounced theory-practice gap between how IMC is taught and the practice of it in industry (Schultz and Patti, 2009; Kerr and Kelly, 2017). This research embeds IMC practice within a classroom setting and subsequently explores student marketers' perceptions of their skill development through experiential client-based learning.

Design/methodology/approach

An in-depth qualitative study demonstrates the value of integrating experiential learning within an IMC course, captured through students' reflective practice.

Findings

Evidence suggests that experiential, client-based projects are suitable for fostering key practice-based skills in the classroom through students “experiencing” IMC at work. However, this is not always easy. In fact, building key skills such as leadership, motivation, communications, organisation and teamwork presents various challenges for students, whilst students appear unaware of other pertinent skills (e.g. persuasion, critical thinking) gained through exposure to “real-world” IMC tasks.

Practical implications

Instructors adopting experiential learning in the marketing classroom have an opportunity to actively design tasks to embed key workplace skills to bridge the theory-practice gap. Client-based projects offer fertile ground for students to experience marketing in action whilst ultimately bolstering their confidence in their workplace skills.

Originality/value

This research contributes to the marketing education literature and acknowledges the importance of embedding key workplace skills into the contemporary marketing curriculum. An overview of challenges and solutions for instructors seeking to adopt experiential learning via client-based projects in the IMC classroom is presented within this research.

Details

Higher Education, Skills and Work-Based Learning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-3896

Keywords

Open Access
Article
Publication date: 14 September 2023

Peter Dodzi Kwasi Agbaxode, Ehsan Saghatforoush and Sitsabo Dlamini

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared…

Abstract

Purpose

The conventional project delivery (CPD) approach has been reported in the literature as the most widely used project delivery method in the construction industry globally compared to other delivery methods. However, researchers and practitioners have argued that the approach, specifically during the production of design documentation under the CPD, lacks certain capabilities that ensure quality and enhance project delivery. Therefore, this study aims to use the Ghanaian construction industry to identify the capabilities required of the CPD in practice, particularly during the production of design documentation.

Design/methodology/approach

The study design follows a pragmatist philosophy and uses mixed methods based on a deductive approach. Data collection involved a questionnaire survey, followed by semi-structured interviews. Quantitative data analysis used descriptive and inferential statistics, whereas qualitative data analysis used content analysis with the assistance of IBM SPSS and QSR Nvivo 12 Pro.

Findings

Findings indicate that there should be incentives for producing good design documentation quality; mandatory coordination of design documentation; improving collaboration among designers; and allowing contractors to make input during the design stage.

Practical implications

The results indicate the need for the identified capabilities to be introduced in the CPD approach to improve design documentation quality.

Originality/value

This study offers a significant insight into the specific capabilities that are required of the CPD approach in practice particularly, in the production of design documentation

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 November 2023

Audrey F. Falk, Martina Jordaan, Sameerah T. Saeed, Madasu Bhaskara Rao and Nour El Houda Chaoui

This program evaluation aimed to investigate the benefits and challenges of an international, intercultural, e-community-engagement experience involving youth and higher education…

Abstract

Purpose

This program evaluation aimed to investigate the benefits and challenges of an international, intercultural, e-community-engagement experience involving youth and higher education students. The authors sought to understand the meaning that participants would make of an international, intercultural, e-community-engagement experience.

Design/methodology/approach

The program evaluation component of this project was qualitative, participatory and action-oriented. It was composed of online reflection sessions with small, international groups of higher education students from Iraq, India, Morocco, South Africa and the USA immediately following each of five interactive exchange sessions with youth from South Africa. It also included one culminating reflection session to which all of the higher education student participants were invited and a written questionnaire that was completed by the youth participants at the conclusion of the project. The reflection sessions were recorded and transcribed. Transcripts and survey data were reviewed for emergent themes.

Findings

Cultural exposure emerged as the primary theme with participants valuing the opportunity to learn about different cultures and to connect with individuals from across the globe.

Research limitations/implications

This program evaluation was not designed as a generalizable study. This pilot initiative provides evidence of the potential value and importance of international, intercultural e-community-engagement experiences for youth and higher education students.

Practical implications

The potential value of technology to build exchange opportunities for young people is immense and largely untapped. International, intercultural e-community-engagement initiatives can be made available to students globally with relatively limited resources. A highly structured and focused plan provides clarity about expectations and requirements for students. A high level of commitment is required by all participants, including the faculty coordinators.

Social implications

Although the project was brief, exposure to numerous countries and cultures allowed participants to challenge their assumptions about different peoples and places in the world. The potential benefits for greater compassion and understanding of communities and cultures in an international context are high.

Originality/value

This program evaluation contributes to and extends the literature on the possibilities and challenges of international e-community-engagement; it demonstrates the potential for e-community-engagement across multiple countries to broaden students' exposure to and interest in global perspectives.

Details

Journal of Applied Research in Higher Education, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2050-7003

Keywords

Article
Publication date: 14 July 2022

Ayman Ahmed Ezzat Othman and Ahmed Ramadan Kamal

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Abstract

Purpose

The aim of this paper is to develop a framework to enhance building maintainability through facilitating early suppliers’ involvement (ESI) in the design process.

Design/methodology/approach

A research methodology consisting of literature review, case studies and survey questionnaire was designed to achieve the above-mentioned aim. Firstly, literature review was used to examine the concepts of building maintenance, maintainability, the design process and ESI. Secondly, three case studies were presented and analysed to investigate the role of ESI towards enhancing building maintainability during the design process. Thirdly, a survey questionnaire was carried out with a representative sample of architectural design firms (ADFs) in Egypt to investigate their perception and application of ESI towards enhancing building maintainability during the design process. Finally, the research developed a framework to facilitate ESI in the design process in ADFs in Egypt.

Findings

Through literature review, the research highlighted the relationship between ESI and enhancing building maintainability and identified the roles, benefits, challenges and that encounter ESI in ADFs, factors for suppliers selection and levels of involvement. Results of the data analysis showed that “Difficulty of trusting external parties and sharing information with transparency” was ranked the highest challenge of ESI in ADFs in Egypt, followed by “Legal competitive advantage restrictions”. Moreover, “Better estimation for operation and maintenance costs” was ranked the highest contributions of ESI towards enhancing building maintainability, followed by “Reduce the number of operation and maintenance problems or reworks”. Finally, respondents stated that “Innovation, technical expertise, and competence” was ranked the highest supplier’s selection criteria, while “paying consultation fees for offering advice and recommendations to the design team” was ranked the highest form of supplier’s remuneration.

Research limitations/implications

The proposed framework contributes to the body of knowledge through proposing five functions that aimed to facilitate ESI in the design process, a research area that received scant attention in construction research. In addition, because of the conceptual nature of the framework, it has to be validated to ensure its capability to overcome the challenges of ESI as an approach for enhancing building maintainability during the design process.

Practical implications

This research presents a practical solution that bridges the gap between theory and practice through overcoming the challenges that obstruct suppliers from being involved in the design process as an approach for enhancing building maintainability.

Originality/value

This research discussed the relationship between ESI and enhancing building maintainability as well as the roles, benefits and challenges that encounter ESI in ADFs. In addition, the research investigated the levels of suppliers’ involvement, selection criteria and forms of payment. Moreover, it investigated the perception and application of ESI in ADFs in Egypt towards improving building maintainability. The research proposed a framework to facilitate the integration of suppliers in the early stages of the project life cycle. It represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 1000