Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Book part
Publication date: 11 December 2023

Bavly Hanna and Andrew Hanna

In light of Egypt’s expanding flow of online learning (OL), quality assurance (QA) has undoubtedly become a strategic priority. In the near future, QA strategy is anticipated to…

Abstract

In light of Egypt’s expanding flow of online learning (OL), quality assurance (QA) has undoubtedly become a strategic priority. In the near future, QA strategy is anticipated to be a major topic of discussion in educational policy talks. Critical policy concerns must be addressed, like sustaining globally acceptable QA standards and responding to the government’s and other stakeholders’ goals and objectives for OL. Our chapter aspires to offer a contribution to current literature in this regard. This chapter aims to investigate the aspects of QA in maintaining OL, particularly in light of the COVID-19 pandemic. Particularly, we analyze internal QA of OL in the Egyptian higher education (HE) sector through quality assurance and accreditation project (QAAP) and program of continuous improvement and qualifying for accreditation (PCIQA). We discuss the external quality assurance and accreditation of Egyptian HE institutions with a special focus on the national authority for quality assurance and accreditation of education (NAQAAE). We investigate the policies, practices, and quality standards that are employed by HE institutions to ensure the quality of online courses and programs through document analysis.

Details

Quality Assurance in Higher Education in the Middle East: Practices and Perspectives
Type: Book
ISBN: 978-1-80262-556-1

Keywords

Article
Publication date: 5 September 2022

Mohamad El Daouk

This paper is aimed at introducing ḥalāl supply chain management (SCM) to the British construction sector, construction supply chains and “SCM”. Ḥalāl supply chains can optimise…

Abstract

Purpose

This paper is aimed at introducing ḥalāl supply chain management (SCM) to the British construction sector, construction supply chains and “SCM”. Ḥalāl supply chains can optimise British construction supply chains by promoting meticulous, qualitative and mutually reinforcing systems. The British construction sector has failed to overcome the inimical, inefficient, fractured and transactional attitudes (collectively, the “complexities”) pervading it and the supply chains beneath it. Construction SCM has been able to introduce change, but with limited profound effect. This is owed to its lack of human agency, proactive quality control systems, as well as other verification and assurance mechanisms. Introducing the Sharīʿa principles encapsulating ḥalāl food supply chains can offer the input needed to optimise current construction supply chains.

Design/methodology/approach

This paper adopts an integrative general review of the academic literature pertaining to the British construction sector, construction SCM, ḥalāl food supply chains, ḥalāl assurance and control processes. The extensive literature review is crucial because it will enable introducing “ḥalāl” to construction SCM, hence ḥalāl construction supply chain management (“ḤCSCM”). ḤCSCM will then be applied to one of the most recent British construction SCM systems to identify how ḤCSCM can complement existing systems.

Findings

The findings indicate that ḤCSCM can further alleviate the complexities thwarting the British construction sector on a supply chain level. This is attributed to taʿrīf’s tailored identification and traceability processes, iltizām’s cross-lateral monitoring processes and istiqāmah’s Sharīʿa-compliant, assured and verifiable certification system, all of which complement the existing construction supply chain assurance and control processes in the UK.

Originality/value

The conception of ḤCSCM promotes an untapped area in the academic literature. Academicians and practitioners can transplant ḥalāl principles from the ḥalāl food manufacturing sector into the British construction sector – similar to how construction SCM was founded by principles originating from the manufacturing industry. This paper highlights the shortfalls of construction SCM in British construction supply chains and propounds how ḤCSCM can resolve them.

Details

Journal of Islamic Marketing, vol. 14 no. 10
Type: Research Article
ISSN: 1759-0833

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah and Weisheng Lu

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of…

Abstract

Purpose

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of Cross-border Construction Logistics and Supply Chain (Cb-CLSC). However, prior studies on the pandemic in the construction project industry have not revealed how CMMs have impacted QA. Thus, this study aims to evaluate the impact of the CMMs on the QA of Cb-CLSC.

Design/methodology/approach

This is achieved by adopting an embedded mixed-method approach involving a desk literature review and engaging 150 experts from different economies across the globe using expert surveys, and results verified via semi-structured expert interviews. Structural equation modelling-based multiple regression analysis (SEM-MRA) was integrated to examine the impact of the CMMs on the QA, along with descriptive and content analysis.

Findings

The study confirmed that CMMs have not only impacted the QA negatively but also influenced the positioning of the QA for the post-pandemic era and probably to survive the risks of future pandemics. Among all the identified CMMs, the top three critical measures include “lockdown (CMM2)”, “use of personal protective equipment, such as nose masks, disinfects, etc. (CMM5)”, and “electronic/virtual meetings (CMM7)”. However, CMM5 possesses the highest contributory power to form CMM in impacting the QA, and this can be regarded as largely positive by strengthening health and safety management systems. Its negative impact lies with the project cost increment and the inconveniences of using nose and face masks.

Practical implications

This study provides a better understanding to construction practitioners and policy makers on how the pandemic policies, i.e. CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics.

Originality/value

The study contributes to knowledge in that it provides a better understanding of how the pandemic policies, such as CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics. This area of study has been given limited attention among prior studies during the pandemic.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah, Weisheng Lu and Benjamin Kwaku Ababio

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA)…

Abstract

Purpose

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA), particularly Cross-border Construction Logistics and Supply Chain (Cb-CLSC). Thus, this study aims to identify and examine the critical challenges of QA of Cb-CLSC during the COVID-19 pandemic.

Design/methodology/approach

The aim is achieved via an embedded mixed-method approach pragmatically involving a desk literature review and engaging 150 experts across the globe using expert surveys, and results confirmed by semi-structured interviews. The approach is based on Interpretive Structural Modelling (ISM) as its foundation.

Findings

The study revealed ten critical challenges of QA, with the top four including “the shortage of raw construction material (C7)”, “design changes (C6)”, “collaboration and communication difficulties (C1)” and “changes in work practices (C10)”. However, examining the interrelationships among the critical challenges using ISM confirmed C7 and C10 as the most critical challenges. The study again revealed that the critical challenges are sensitive and capable of affecting themselves due to the nature of their interrelationship based on MICMAC analysis. Hence, being consistent with why all the challenges were considered critical amid the pandemic. Sentiment analysis revealed that the critical challenges have not been entirely negative but also positive by creating three areas of opportunities for improvement: technology adoption, worker management, and work process management. However, four areas of challenges in the QA include cost, raw material, time, and work process, including inspection, testing, auditing, communication, etc.

Practical implications

The finding provides a convenient point of reference to researchers, policymakers, practitioners, and decision-makers on formulating policies to enhance the effectiveness of construction QA during the pandemic through to the post-pandemic era.

Originality/value

The study enriches the extant literature on QA, Cb-CLSC, and the COVID-19 pandemic in the construction industry by identifying the critical challenges and examining the interrelationships among them. This provides a better understanding of how the construction QA has been affected by the pandemic and the opportunities created.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Book part
Publication date: 11 December 2023

Abstract

Details

Quality Assurance in Higher Education in the Middle East: Practices and Perspectives
Type: Book
ISBN: 978-1-80262-556-1

Article
Publication date: 8 April 2024

Lies Bouten and Sophie Hoozée

This study examines how assurors make sense of sustainability assurance (SA) work and how interactions with assurance team members and clients shape assurors’ sensemaking and…

Abstract

Purpose

This study examines how assurors make sense of sustainability assurance (SA) work and how interactions with assurance team members and clients shape assurors’ sensemaking and their actual SA work.

Design/methodology/approach

To obtain detailed accounts of how SA work occurs on the ground, this study explores three SA engagements by interviewing the main actors involved, both at the client firms and at their Big Four assurance providers.

Findings

Individual assurors’ (i.e. partners and other team members) sensemaking of SA work results in the crafting of their logics of action (LoAs), that is, their meanings about the objectives of SA work and how to conduct it. Without organizational socialization, team members may not arrive at shared meanings and deviate from the team-wide assurance approach. To fulfill their objectives for SA work, assurors may engage in socialization with clients or assume a temporary role. Yet, the role negotiations taking place in the shadows of the scope negotiations determine their default role during the engagement.

Practical implications

Two options are available to help SA statement users gauge the relevance of SA work: either displaying the SA work performed or making it more uniform.

Originality/value

This study theoretically grounds how assurors make sense of SA work and documents how (the lack of) professional socialization, organizational socialization and socialization of frequent interaction partners at the client shape actual SA work. Thereby, it unravels the SA work concealed behind SA statements.

Details

Accounting, Auditing & Accountability Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 12 December 2023

Ata Ul Musawir, Mohd Suhaimi Mohd-Danuri and Saipol Bari Abd-Karim

This paper examines how expert practitioners define project governance and develop a project governance system that enables strategy implementation through projects.

Abstract

Purpose

This paper examines how expert practitioners define project governance and develop a project governance system that enables strategy implementation through projects.

Design/methodology/approach

Semi-structured interviews were conducted with project governance experts and analyzed the data using thematic analysis. Subsequently, based on the stratified ontology of critical realism, retroductive theoretical triangulation was employed to explain the themes identified using five emergent theoretical perspectives.

Findings

By integrating the themes extracted from the data with the emergent theoretical perspectives, a framework was developed outlining the general process through which practitioners make sense of the concept of project governance, formulate an appropriate project governance system for their respective organizations and manage its evolution over time. Furthermore, a holistic approach to project governance was proposed that spans the entire investment life cycle of projects and enables the implementation of strategy through projects.

Practical implications

This study attempts to make sense of the diverse interpretations of the concept of project governance adopted by practitioners. It further summarizes valuable insights from expert practitioners for formulating and enacting effective project governance systems.

Originality/value

This study contributes to the governance-as-practice perspective and the growing stream of literature that views projects as investments. The project governance system is positioned as the steward of an organization's investments in projects.

Details

International Journal of Managing Projects in Business, vol. 17 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Book part
Publication date: 11 December 2023

Sameerah T. Saeed and Karwan H. Sherwani

Globally, higher education institutions have become reliant on a quality assurance (QA) system over the past four decades. QA is considered to be one of the most important drivers…

Abstract

Globally, higher education institutions have become reliant on a quality assurance (QA) system over the past four decades. QA is considered to be one of the most important drivers of continuous improvement and an essential tool for promoting excellence in teaching, learning, and research. It provides a framework for establishing and maintaining standards, and for assuring stakeholders that programs and services meet or exceed these standards. Despite the wide range of quality assurance models available to higher education institutions, there remains considerable debate over which model is the most effective, as well as what criteria should be used for evaluating the effectiveness of these models. Universities in the Middle East have tried to adopt different models of QA that can meet their needs and expectations and provide a framework for continuous improvement. A major objective of this book is to provide an overview account of the QA process as implemented in the higher education systems of a number of Middle East countries, including Egypt, Iraq, Lebanon, Saudi Arabia, and the United Arab Emirates. This book lays out essential theoretical and practical insights into the role of QA policies and practices in higher education in the Middle East countries and builds upon this idea to provide a blueprint for future academic leaders in these countries and other Middle Eastern countries to enhance their QA policies and practices and drive higher education in those countries forward.

Details

Quality Assurance in Higher Education in the Middle East: Practices and Perspectives
Type: Book
ISBN: 978-1-80262-556-1

Keywords

1 – 10 of over 2000