Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah and Weisheng Lu

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of…

Abstract

Purpose

While COVID-19 mitigation measures (CMMs) aided in steady recovery during the pandemic, they also impeded movement across economies/borders, affecting quality assurance (QA) of Cross-border Construction Logistics and Supply Chain (Cb-CLSC). However, prior studies on the pandemic in the construction project industry have not revealed how CMMs have impacted QA. Thus, this study aims to evaluate the impact of the CMMs on the QA of Cb-CLSC.

Design/methodology/approach

This is achieved by adopting an embedded mixed-method approach involving a desk literature review and engaging 150 experts from different economies across the globe using expert surveys, and results verified via semi-structured expert interviews. Structural equation modelling-based multiple regression analysis (SEM-MRA) was integrated to examine the impact of the CMMs on the QA, along with descriptive and content analysis.

Findings

The study confirmed that CMMs have not only impacted the QA negatively but also influenced the positioning of the QA for the post-pandemic era and probably to survive the risks of future pandemics. Among all the identified CMMs, the top three critical measures include “lockdown (CMM2)”, “use of personal protective equipment, such as nose masks, disinfects, etc. (CMM5)”, and “electronic/virtual meetings (CMM7)”. However, CMM5 possesses the highest contributory power to form CMM in impacting the QA, and this can be regarded as largely positive by strengthening health and safety management systems. Its negative impact lies with the project cost increment and the inconveniences of using nose and face masks.

Practical implications

This study provides a better understanding to construction practitioners and policy makers on how the pandemic policies, i.e. CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics.

Originality/value

The study contributes to knowledge in that it provides a better understanding of how the pandemic policies, such as CMMs, have impacted QA and can aid in formulating planning and operational decisions to adequately position the QA for the post-pandemic era and to endure the risks of future pandemics. This area of study has been given limited attention among prior studies during the pandemic.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 26 March 2024

Frank Ato Ghansah, Weisheng Lu and Benjamin Kwaku Ababio

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA)…

Abstract

Purpose

The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA), particularly Cross-border Construction Logistics and Supply Chain (Cb-CLSC). Thus, this study aims to identify and examine the critical challenges of QA of Cb-CLSC during the COVID-19 pandemic.

Design/methodology/approach

The aim is achieved via an embedded mixed-method approach pragmatically involving a desk literature review and engaging 150 experts across the globe using expert surveys, and results confirmed by semi-structured interviews. The approach is based on Interpretive Structural Modelling (ISM) as its foundation.

Findings

The study revealed ten critical challenges of QA, with the top four including “the shortage of raw construction material (C7)”, “design changes (C6)”, “collaboration and communication difficulties (C1)” and “changes in work practices (C10)”. However, examining the interrelationships among the critical challenges using ISM confirmed C7 and C10 as the most critical challenges. The study again revealed that the critical challenges are sensitive and capable of affecting themselves due to the nature of their interrelationship based on MICMAC analysis. Hence, being consistent with why all the challenges were considered critical amid the pandemic. Sentiment analysis revealed that the critical challenges have not been entirely negative but also positive by creating three areas of opportunities for improvement: technology adoption, worker management, and work process management. However, four areas of challenges in the QA include cost, raw material, time, and work process, including inspection, testing, auditing, communication, etc.

Practical implications

The finding provides a convenient point of reference to researchers, policymakers, practitioners, and decision-makers on formulating policies to enhance the effectiveness of construction QA during the pandemic through to the post-pandemic era.

Originality/value

The study enriches the extant literature on QA, Cb-CLSC, and the COVID-19 pandemic in the construction industry by identifying the critical challenges and examining the interrelationships among them. This provides a better understanding of how the construction QA has been affected by the pandemic and the opportunities created.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 April 2024

Lies Bouten and Sophie Hoozée

This study examines how assurors make sense of sustainability assurance (SA) work and how interactions with assurance team members and clients shape assurors’ sensemaking and…

Abstract

Purpose

This study examines how assurors make sense of sustainability assurance (SA) work and how interactions with assurance team members and clients shape assurors’ sensemaking and their actual SA work.

Design/methodology/approach

To obtain detailed accounts of how SA work occurs on the ground, this study explores three SA engagements by interviewing the main actors involved, both at the client firms and at their Big Four assurance providers.

Findings

Individual assurors’ (i.e. partners and other team members) sensemaking of SA work results in the crafting of their logics of action (LoAs), that is, their meanings about the objectives of SA work and how to conduct it. Without organizational socialization, team members may not arrive at shared meanings and deviate from the team-wide assurance approach. To fulfill their objectives for SA work, assurors may engage in socialization with clients or assume a temporary role. Yet, the role negotiations taking place in the shadows of the scope negotiations determine their default role during the engagement.

Practical implications

Two options are available to help SA statement users gauge the relevance of SA work: either displaying the SA work performed or making it more uniform.

Originality/value

This study theoretically grounds how assurors make sense of SA work and documents how (the lack of) professional socialization, organizational socialization and socialization of frequent interaction partners at the client shape actual SA work. Thereby, it unravels the SA work concealed behind SA statements.

Details

Accounting, Auditing & Accountability Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 4 August 2023

MohammedShakil S. Malek and Viral Bhatt

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management…

Abstract

Purpose

Managing mega infrastructure projects (MIPs) is more complex because of time, size, social, environmental and financial implications. This study aims to address the management approaches, complexity and risk factors involved in MIPs. The study focuses on project success criteria and their individual effects on the success of MIPs.

Design/methodology/approach

To address the challenges and identify the most influencing factor for the success of MIPs, the study deployed a cross-sectional survey approach. Six hundred eighty-two usable samples were collected from the respondents to understand the impact of predetermined factors on the success of MIPs. The structural equation model and artificial neural network approach were used to derive the importance of factors affecting the success of MIPs.

Findings

The study's outcome confirms that all three influencing factors: feasibility studies, community engagements and contract selection, have a significant positive impact on the success of MIPs. Community engagement amongst all three has the most influential predictor for the success of MIPs.

Originality/value

The developed model will enable practitioners and policymakers from Indian construction companies and other emerging nations to concentrate on recognized risk reduction variables to enhance project success criteria and project management success, especially for MIPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 January 2023

Chathuri Gunarathna, Rebecca Yang, Pabasara Wijeratne Mudiyanselage, Gayashan Amarasinghe, Tharushi Samarasinghalage, R.P. Nilmini Weerasinghe, Hongying Zhao, Chaoxiang Zhang, Chengyang Liu, Kaige Wang and Sujan Dev Sureshkumar Jayakumari

Project-based learning is one of the most effective methods of transferring academic knowledge and skills to real-world situations in higher education. However, its effectiveness…

Abstract

Purpose

Project-based learning is one of the most effective methods of transferring academic knowledge and skills to real-world situations in higher education. However, its effectiveness is not much investigated focusing on the students' narrative. This study aims at evaluating the students' experience and perspective on adopting project-based learning in master by research and doctoral programmes for proactive skills development.

Design/methodology/approach

This study evaluates the self-reflection of 10 postgraduate students and their supervisor who have participated in developing a software tool for solar photovoltaics (PV) integrated building envelope design, management and the related education.

Findings

Findings reveal that the students have effectively improved their knowledge on the subject via collaborating with the industry, self-learning/observation, peer learning, problem-solving and teamwork. Dividing the project into student-led tasks has improved the decision-making and leadership skills, risks identification, planning and time management skills. The overall experience has (1) built up confidence in students, (2) enhanced their creativity and critical thinking and (3) improved their proactive skills and context knowledge.

Originality/value

A clear research gap can be seen in exploring the effectiveness of project-based learning for master by research and doctoral programmes, which mainly focus on extensive research. These programmes do not necessarily focus on developing students' proactive skills, which is the main requirement if they intend to work in the construction industry. This paper addresses the above research gap by demonstrating the effectiveness of project-based learning for developing the proactive skills in a research-intensive learning environment.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 February 2024

Suhaib Arogundade, Mohammed Dulaimi, Saheed Ajayi and Ali Saad

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they…

Abstract

Purpose

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they behave while delivering projects. This study aims to investigate the behavioural tendencies of contractors that could lead to carbon minimisation during the execution of construction projects.

Design/methodology/approach

An industry survey was performed amongst 41 UK construction professionals. Spearman’s correlation and factor analysis were used to analyse the data.

Findings

The result of the Spearman’s correlation gave rise to 14 contractors’ carbon reduction behaviour (CCRB) variables and their factor analysis yielded two distinct factors, namely, contractors’ consummate carbon reduction behaviour and contractors’ pragmatic carbon reduction behaviour. The findings suggest that in the UK, contractors are willing to take voluntary practical steps to decrease the carbon footprint of construction projects.

Practical implications

This finding might be unexpected to construction stakeholders, especially construction clients who may believe that infusing strict carbon reduction obligations in contracts is sufficient in nudging contractors to lessen the carbon impact of projects.

Originality/value

The study attempted to quantitatively derive CCRB, thereby extending the breadth of knowledge in the construction carbon reduction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 February 2024

Mohamed Mousa, Rami Ayoubi and Vesa Puhakka

This paper aims to answer the question: To what extent should neurodiverse students experience improved access to public universities in Egypt and why?

Abstract

Purpose

This paper aims to answer the question: To what extent should neurodiverse students experience improved access to public universities in Egypt and why?

Design/methodology/approach

A systematic qualitative research method was used with data collected through semi-structured interviews with 44 educators in four universities in Egypt. A thematic approach was implemented to analyze the collected data.

Findings

The addressed educators believe that greater representation of neurodiverse students in their schools should be a priority for the following four reasons: first, neurodiverse students represent a promising new market segment schools could benefit from; second, recruiting more neurodiverse students represents a chance for schools and faculties to prove the social role they can undertake; third, schools can benefit from the unique skills many neurodiverse students have, particularly in mathematical and computational skills; and fourth, the greater the representation of neurodiverse students, the more research projects and funding opportunities educators can obtain.

Originality/value

This paper contributes by filling a gap in diversity management, higher education and human resources management in which empirical studies on the representation of neurodiverse individuals in public universities have been limited so far.

Details

Higher Education, Skills and Work-Based Learning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-3896

Keywords

Article
Publication date: 14 June 2023

Nguyen Dat Minh and Nguyen Thi Hanh Quyen

This study aims to present the results of a comparative study on the most key reasons for the failure of sustaining activities of operational improvement (OI) methodologies from…

Abstract

Purpose

This study aims to present the results of a comparative study on the most key reasons for the failure of sustaining activities of operational improvement (OI) methodologies from the different types of manufacturing enterprises that located in Vietnam.

Design/methodology/approach

This study presents survey results from 30 local manufacturing enterprises and 21 foreign direct investment (FDI) enterprises located in Vietnam – a developing country. The authors utilize a combination method to collect data, including online and direct survey. The targeted interviewees selected to answer the questionnaire are manufacturing managers and top managers working in productivity, quality, engineering and other departments in respective firms. The developed questionnaire is verified by five experts to ensure the validity and soundness.

Findings

The study uncover that 21 local enterprises (70%) have not issued standard forms for OI deployment and supervision, while 17 foreign enterprises (81%) have adopted a systematic management and clearly indicators for evaluation of OI outputs. In addition, the top three reasons for OI failure are differences between local and foreign enterprises. In term of OI methodologies, most of participated enterprises implemented Lean tools and principles while only 7.8% of the participated enterprises applied Six Sigma. Three vital findings are uncovered, including, first, 30% of local enterprises standardize and supervise forms of OI.

Research limitations/implications

There is a limitation in sample size, with the number of participants of 51 enterprises. Among the participants, 27% of local enterprises are small and medium-sized enterprises (SMEs) while 60% of FDI enterprises from large-sized group. This was limited to making a generated conclusion in the comparison of failure factors between two types of enterprises. This partly affects the radical comparison of failure factors between local and FDI enterprises.

Originality/value

To the best of the authors' view, this is the first empirical study that compares the reasons for the failure for sustaining OI between local and foreign enterprises in a developing country. The result from this study will make contributions for further research in considering OI failure factors and then enhance effectiveness of OI methodologies in manufacturing companies.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords