Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1139

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1052

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2024

Emilie Gibeau

Despite much attention being devoted to shared leadership, the negotiation of such arrangements remains underexplored. In parallel, the revival of interest in matrix structures…

Abstract

Purpose

Despite much attention being devoted to shared leadership, the negotiation of such arrangements remains underexplored. In parallel, the revival of interest in matrix structures reveals their challenges but neglects the dynamics of shared leadership. In this case study, the author analyzes the tensions experienced by senior managers of a healthcare organization transitioning from a hierarchical to matrix structure as they negotiate their leadership roles in this new arrangement.

Design/methodology/approach

The author interviewed 16 senior managers, observed their meetings and analyzed documents. These data were combined with secondary data including previous interviews and observations of this top leadership team. The author then conducted an inductive data analysis.

Findings

The author's analysis reveals that the tensions experienced by senior managers as they negotiate their roles reflect the co-existence of leadership surpluses (too much leadership) and deficits (too little leadership) in matrix organizations. The author argues that surpluses and deficits are not mutually exclusive but are interrelated and shows how leadership surpluses can create leadership deficits.

Practical implications

The author’s findings suggest that in contexts of leader abundance, actors should explore leadership voids. Particular attention should be paid to incidents of intrusion and exclusion, moments of transition and intense role negotiation, as those contexts are particularly conducive to leadership deficits.

Originality/value

While previous work on matrix structures focuses on leadership surpluses, the author discusses leadership deficits. The author explores how more leaders do not necessarily mean more leadership, but instead how more leaders may result in leadership voids.

Details

International Journal of Organization Theory & Behavior, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1093-4537

Keywords

Article
Publication date: 12 April 2024

Rogers Mwesigwa, Gonzaga Basulira, Joseph Mayengo and Jude Thadeo Mugarura

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Abstract

Purpose

This study aims to examine the association between community engagement, community commitment and sustainability of public–private partnership (PPP) projects in Uganda.

Design/methodology/approach

This study adopted a cross-sectional and quantitative approach. Data were collected using a questionnaire from 42 PPP projects in Uganda.

Findings

The study found that community engagement and commitment are all positively and significantly associated with the sustainability of PPP projects in Uganda. Results also show that community commitment mediates community engagement and project sustainability.

Research limitations/implications

The study results imply that for sustainability to be achieved, communities must be engaged in project activities such as planning, design and implementation to boost their commitment to project sustainability.

Originality/value

The sustainability of PPP projects is an emerging phenomenon. This paper contributes to scanty literature on ensuring the sustainability of PPP projects from a developing country’s perspective.

Details

Journal of Management Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0262-1711

Keywords

Article
Publication date: 29 March 2024

Ahmed O. El-Kholei, Ahmed S. Amer and Ghada A. Yassein

Sustainable design is a new paradigm to localize sustainable development. The Union Internationale des Architectes (UIA) prepared guidelines for architectural projects to…

Abstract

Purpose

Sustainable design is a new paradigm to localize sustainable development. The Union Internationale des Architectes (UIA) prepared guidelines for architectural projects to contribute to the Sustainable Development Goals (SDGs). Using the theory of change, the Department of Architecture at Menofia University set the 2023 graduation project to explore the possibility of adopting sustainable design principles and integrating SDGs into architectural education. The paper documents and evaluates the experiment to drive best practices and lessons learned.

Design/methodology/approach

The paper utilized a mixed design strategy utilizing qualitative and quantitative techniques. It gathered data from various sources, including a student questionnaire and unstructured interviews with external examiners. Data analysis included frequency distribution and sentiment, content and thematic analyses. Triangulation is applied, combining data, investigator and methodological triangulation to enhance the paper’s validity.

Findings

Integrating SDGs into the 2023 graduation project contributed to students’ understanding of sustainable urban development. Students demonstrated varying receptiveness to guidelines, focusing mainly on the SDGs (1-5, 7, 8, 10 and 11). Gender equality and economic empowerment struck a chord with the mostly female students, acknowledging that securing well-paying jobs is a way to escape the cycle of poverty. Challenges included limited resources and time constraints, a scarcity of Arabic reading materials and misunderstandings among students and staff, thus prompting collaborative efforts beyond standard studio hours. Despite challenges, the initiative contributes to sustainable urban development, providing valuable lessons learned and insights.

Originality/value

Integrating sustainable design principles into architectural education is doable but involves a complex process requiring careful preparation. The value lies in the tangible impact on sustainable urban development, emphasizing the importance of incorporating sustainable development concepts throughout the architectural curriculum. The authors advocate for increased awareness and education among stakeholders and suggest areas for future research by exploring a broader implementation and assessing the long-term effects on students’ mindsets and practices. Sustainable development is a means toward community prosperity, and the inquiry highlights the collective responsibility of scholars, practitioners and students in shaping a better future.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 14 December 2022

Bryan Pieterse, Kofi Agyekum, Patrick Manu, Saeed Reza Mohandes, Clara Cheung and Akilu Yunusa-Kaltungo

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto…

Abstract

Purpose

Major maintenance projects are often regarded as maintenance activities regardless of the projects' complexity and scale. Consequently, very scarce research attention has hitherto been paid to the critical skills required when undertaking these projects. More specifically, the body of relevant knowledge is deprived of a study focusing on maintenance projects within the energy sector. In view of this shortcoming, this research aims to examine the critical project management (PM) skills required to deliver major maintenance projects within the energy sector.

Design/methodology/approach

Based on a quantitative research strategy, this study addressed the knowledge gap through a cross-sectional survey of professionals involved in the delivery of major maintenance projects in the United Kingdom's (UK) energy sector. Data obtained were analyzed via descriptive (e.g. frequencies, mean and standard deviation [SD]) and inferential statistical analyses (One sample t-test and exploratory factor analysis (EFA)).

Findings

Out of the 45 PM skills identified in the literature and examined by the respondents, the results obtained from the One sample t-test (based on p (1-tailed) = 0.05) showed that 37 were considered to be at least “important,” accounting for 80.4% of all the skills identified. EFA revealed a clustering of the PM skills items into seven components: “skills related to work scheduling and coordination”; “communication, risk, safety and stakeholder management skills”; “quality assurance skills”; “people management skills”; “skills related to forecasting scope and duration of outage”; “implementation of processes and time management skills” and “technical/engineering skills and experience pertaining to the outage and local site knowledge.”

Originality/value

This study has identified and contributed to the limited state-of-the-art skills project managers must possess to manage major maintenance projects in the energy sector successfully. The findings would be useful to organizations within the energy sector in ensuring that the organizations have suitable personnel in place to deliver major maintenance projects on the organizations' assets.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 14 February 2024

Tiep Nguyen, Nicholas Chileshe, Duc Ty Ho, Viet Thanh Nguyen and Quang Phu Tran

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners…

Abstract

Purpose

Urban rail projects are typically large-scale transport infrastructure projects (megaprojects) which have many potential risks that can influence the strategic goals of owners. However, there is a paucity of studies which explore the impact of risks on both “urban rail” project time and cost together considering quantitative assessments. Therefore, this paper focuses on investigating critical risks and quantifying such risk impacts on urban railway project schedule and cost in practice.

Design/methodology/approach

A combination of qualitative and quantitative research methods comprising semi-interviews with five experts and a questionnaire survey of 132 professional respondents is used. The data were modeled using Monte Carlo Simulation to predict the probability of project schedule and cost.

Findings

The results show that 30 risk variables are categorized into seven main groups which have significant impacts on both project time and cost. Outstanding five risk variables were highlighted as follows: (1) project site clearance and land compensation; (2) design changes; (3) physical project resources; (4) contractors’ competencies and (5) project finance. Such findings were supported by Monte Carlo simulation which predicted in the worst case that the project may suffer 11.03 months’ delays and have cost overrun with a contingency of US$287.68 million.

Originality/value

This study expands our knowledge about time and cost contingency of urban metro railway implementation across developing economies and particularly within the context of Vietnam. Policymakers will not only gain an understanding about risk structure but will also recognize the significant impacts of critical risk through risk impact modeling and simulation. Such an approach provides insights into risk treatment priorities for planners so that they can proactively establish suitable strategies for risk mitigation in practice.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords