Search results

1 – 10 of over 12000
Content available
Article
Publication date: 16 October 2018

Garrett Lane Cohee, Jeff Barrows and Rob Handfield

Each year, the US defense industry outsources nearly $400 bn of domestic goods and services through competitive bids. These procurement activities are quite often complex and…

2030

Abstract

Purpose

Each year, the US defense industry outsources nearly $400 bn of domestic goods and services through competitive bids. These procurement activities are quite often complex and specialized in nature because of a highly regulated federal acquisition contracting environment. Ongoing calls to improve supplier management and drive innovation in the defense industry offers an opportunity to adopt Early Supplier Integration (ESI) initiatives that have proven successful in the private sector. This paper identifies critical ESI activities and acquisition practices that the defense industry should adopt to ensure enhanced effectiveness in new product development.

Design/methodology/approach

Leveraging a conceptual ESI model derived from the research, an in-depth case study of 12 product development projects from a major defense contractor was performed. In the context of project performance, critical ESI activities and moderating effects were assessed.

Findings

Three key ESI activities have the greatest impact on aggregate project performance: system design involvement, design adjustment opportunities and design for manufacturability/assembly/testability involvement. Use of formal supplier agreements also significantly impacts project performance during the development phase. In addition, project complexity and product team maturity were identified as environment moderators; higher complexity projects tended to negatively moderate the impact of ESI upon performance, and higher team maturity levels tended to positively moderate the impact of ESI upon performance.

Originality/value

The results provide a sound framework for empirical validation through future quantitative studies and defense industry analyses. In addition, insights and recommendations for interpretation and adaptation of federal acquisition regulations to allow increased utilization of ESI within the defense industry are substantiated.

Details

Journal of Defense Analytics and Logistics, vol. 3 no. 1
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 11 August 2023

Guus Keusters, Frédérique Batelaan, Froukje SleeswijkVisser, Erik-Jan Houwing and Hans Bakker

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design…

Abstract

Purpose

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design processes that are more closely linked to the relevance of the project context, it is hypothesised that empathic abilities could play an important role in the performance of civil engineering projects. Therefore, this study aims to investigate whether performance can be improved by focusing on empathic abilities during the integrated design phase.

Design/methodology/approach

Semi-structured in-depth interviews with experts were conducted to explore the relevance of empathic abilities and their interaction with performance in a real-life infrastructure project. The project team’s empathy level was measured by means of a survey using Davis’ Interpersonal Reactivity Index method. Finally, differences between expected and measured levels of empathy were analysed.

Findings

The results provide insights into how empathic abilities interact with performance. The measurement indicates that, on average, professionals in the civil engineering industry score relatively low on empathy. In addition, differences were identified between the expected distribution and the measured empathy levels of the team, implying a potential for improvement, in particular by increasing the empathic abilities of the project management and increasing gender diversity.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate a relationship between empathy and the performance of civil engineering projects. The results provide initial insights into the empathic ability of civil engineering project teams and the potential of empathy to improve performance. Furthermore, from an empathy perspective, this study advocates increasing the gender diversity of project teams to improve performance.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 8 July 2022

Choiwai Maggie Chak, Lara Carminati and Celeste P.M. Wilderom

Combining the goal-setting and job demands-resources (JD-R) theories, we examine how two project resources, collaborative project leadership and financial project resources…

2013

Abstract

Purpose

Combining the goal-setting and job demands-resources (JD-R) theories, we examine how two project resources, collaborative project leadership and financial project resources, enhance high project performance in community-academic health partnerships.

Design/methodology/approach

With a sequential explanatory mixed-method research design, data were collected through a survey (N = 318) and semi-structured interviews (N = 21). A hypothesised three-path mediation model was tested using structural equation modelling with bootstrapping. Qualitative data were examined using thematic analysis.

Findings

Project workers’ hope, goal-commitment and -stress: (1) fully mediate the hypothesised relationship between highly collaborative project leadership and high project performance; and (2) partially mediate the relationship between financial project resources and high project performance. The qualitative data corroborate and deepen these findings, revealing the crucial role of hope as a cognitive-motivational facilitator in project workers’ ability to cope with challenges.

Practical implications

Project leaders should promote project workers’ goal commitment, reduce their goal stress and boost project performance by securing financial project resources or reinforcing workers’ hope, e.g. by fostering collaborative project leadership.

Originality/value

The findings contribute to the project management and JD-R literature by considering the joint effects of project workers’ hope and two commonly studied project resources (collaborative project leadership and financial project resources) on high project performance. Moreover, we demonstrate the importance of the goal-setting and JD-R theories for understanding complex health-promotion projects connecting academic to community work.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 10
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 8 February 2021

Eryk Głodziński

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a…

1627

Abstract

Purpose

The purpose of this paper is to discuss contemporary knowledge relevant to the application of performance measurement (PMe) in the concept of OPM and to compare findings from a literature review with solutions recommended for utilization by managers from general contractors operating in Poland. There are few studies related to the mentioned topic, much fewer describing the geographical area of Eastern Europe.

Design/methodology/approach

Triangulation of research methods was selected. First literature review, next desk research and finally descriptive statistical analysis and interview were conducted. The research methods were applied in three steps whose beginnings overlapped and the mid-term findings from one study complemented others.

Findings

PMe should be focused on management and governance issues. Its evaluation is related to various organizational levels (permanent organization, portfolio, program, project, construction site and supply chain), most of them are under valuated by practitioners. The conducted study pointed out that there are numerous supporting tools and measures applicable in organizational project management (OPM). The managers recommend combining various tools in one comprehensive OPM system, to limit multiple manual incorporations of the same data to the various databases. The managers call to increase the practical usefulness of researchers’ proposals, to educate the construction managers in the application of complex performance systems and to promote portfolio thinking.

Originality/value

The comparison of performance measurement solutions proposed by academia with experience collected from Polish construction managers could support the better application of theoretical ideas in practice.

Details

Measuring Business Excellence, vol. 25 no. 3
Type: Research Article
ISSN: 1368-3047

Keywords

Open Access
Article
Publication date: 16 October 2023

Emmanuel Dele Omopariola, Abimbola Olukemi Windapo, David John Edwards, Clinton Ohis Aigbavboa, Sunday Ukwe-Nya Yakubu and Onimisi Obari

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective…

Abstract

Purpose

Previous studies have postulated that an advance payment system (APS) positively impacts the contractor's working capital and is paramount to ensuring an efficient and effective project cash flow process. However, scant research has been undertaken to empirically establish the cash flow performance and domino effect of APS on project and organisational performance.

Design/methodology/approach

The epistemological design adopted a positivist philosophical stance augmented by deductive reasoning to explore the phenomena under investigation. Primary quantitative data were collected from 504 Construction Industry Development Board (CIDB) registered contractors (within the grade bandings 1–9) in South Africa. A five-point Likert scale was utilised, and subsequent data accrued were analysed using structural equation modelling (SEM).

Findings

Emergent findings reveal that the mandatory use of an APS does not guarantee a positive project cash flow, an improvement in organisational performance or an improvement in project performance.

Practical implications

The ensuing discussion reveals the contributory influence of APS on positive cash flow and organisational performance, although APS implementation alone will not achieve these objectives. Practically, the research accentuates the need for various measures to be concurrently adopted (including APS) towards ensuring a positive project cash flow and improved organisational and project performance.

Originality/value

There is limited empirical research on cash flow performance and the domino effect of APS on project and organisational performance in South Africa, nor indeed, the wider geographical location of Africa as a continent. This study addresses this gap in the prevailing body of knowledge.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 April 2020

Hella Abidi, Sander de Leeuw and Wout Dullaert

We examine how design and implementation practices for supply chain performance management that have proven successful in commercial organisations apply to humanitarian…

6294

Abstract

Purpose

We examine how design and implementation practices for supply chain performance management that have proven successful in commercial organisations apply to humanitarian organisations (HOs) to guide the process of designing and implementing performance management in humanitarian organisations.

Design/methodology/approach

We identify from the literature ten successful practices regarding the design and implementation of supply chain performance management in commercial businesses. We apply these, using action research over a four-year period, at Médecins sans Frontières (MSF) Belgium and draw conclusions from this.

Findings

We find that tools and techniques, such as workshops and technical sheets, are essential in designing and implementing supply chain performance measurement projects at HOs. Furthermore, making a link to an IT project is crucial when implementing performance measurement systems at HOs. Overall, our case study shows that performance management practices used in business can be applied and are relevant for humanitarian supply chains.

Originality/value

Previous research has argued that there are few empirical studies in the domain of performance management at humanitarian organisations. To the best of our knowledge, this paper is the first to provide a longitudinal understanding of the design and implementation of supply chain performance measurement at HOs.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 10 no. 2
Type: Research Article
ISSN: 2042-6747

Keywords

Content available
Article
Publication date: 4 October 2018

Denis S. Clayson, Alfred E. Thal, Jr and Edward D. White III

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the…

Abstract

Purpose

The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature. CPI is defined as the earned value of work performed divided by the actual cost of the work, and CPI stability represents the point in time in a project after which the CPI varies by less than 20 percent (measured in different ways).

Design/methodology/approach

After collecting monthly earned value management (EVM) data for 136 environmental remediation projects from a United States federal agency in fiscal years 2012 and 2013, the authors used the nonparametric Wilcoxon signed-rank test to analyze CPI stability. The authors also used nonparametric statistical comparisons to identify any significant relationships between CPI stability and independent variables representing project and contract characteristics.

Findings

The CPI for environmental projects did not stabilize until the projects were 41 percent complete with respect to project duration. The most significant factors contributing to CPI stability were categorized into the following managerial insights: contractor qualifications, communication, stakeholder engagement, contracting strategy, competition, EVM factors, and macro project factors.

Originality/value

As CPI stability for environmental remediation projects has not been reported in the literature, this research provides new insights to help project managers understand when the CPIs of environmental remediation projects stabilize and which factors have the most impact on CPI stability.

Details

Journal of Defense Analytics and Logistics, vol. 2 no. 2
Type: Research Article
ISSN: 2399-6439

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 30 June 2023

Henry Okpo, Dubem Ikediashi and Afolabi Dania

The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point…

Abstract

Purpose

The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point for improving project performance. Amidst researchers' recent empirical engagement with CD, the knowledge of the relationship model between CD and project delivery (PD) is abysmal. As a result, developing a business case for CD in developing countries has been slow due to the dearth of empirical evidence. This paper aims to investigate the influence of digitalisation on project performance.

Design/methodology/approach

Anchored on cross-sectional survey research design using a questionnaire survey in which a total of 183 copies of structured questionnaires were randomly distributed to medium- and large-sized construction firms operating in Abuja, Nigeria's federal capital. A total of 126 valid responses were received giving an overall response rate of 68.8%. The responses were analysed using mean item score, principal component analysis and multiple linear regression.

Findings

Findings from the regression analysis reveal that digitalisation has varying levels of impact on PP measured using quality, time and cost. The relationship model with time performance is weak (r = 0.526, r2 = 0.277); on cost performance, the significant model is also weak (r = 0.502, r2 = 0.252) and moderate on quality (r = 0.663, r2 = 0.439). CD influences project cost, time and quality performance despite the weak relationship model. The results indicate that the most effective benchmark of CD is quality performance.

Originality/value

This study established the relationship between digitalisation and construction PD within the construction industry context, an area lacking research attention in emerging economies. This study is the first study in emerging economies that established the influence of digitalisation on construction PD statistically.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…

2758

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

1 – 10 of over 12000