Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 November 2023

Rebecca Kassa, Ibilola Ogundare, Brian Lines, Jake B. Smithwick, Nancy J. Kepple and Kenneth T. Sullivan

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially…

Abstract

Purpose

Construction organizations' investment in effective talent-development programs is a key strategy in attracting, developing and retaining staff. Such programs are especially important given the current challenges in the construction workforce, including labor shortages, an aging workforce, generational differences in the workforce, supply chain disruptions and the need to effectively train staff in the skills that are essential in a constrained labor environment. To address these challenges, this study proposes a performance measurement strategy that construction companies can use as input to design their talent development programs.

Design/methodology/approach

The strategy intends to assess the performance of project managers and develop criteria that define categories of their performance, including the top performers' category. This enables construction organizations to provide each project manager with individualized training that addresses areas of weakness and in turn, develops the skills that correspond with being top performers. The proposed strategy was developed and tested by surveying the immediate supervisors of 187 project managers working for general and specialty contractors in the United States. Principal component analysis was used to develop a single performance construct from seven performance criteria.

Findings

This construct was used to organize the project managers into the categories of top, above-average and below-average performers. According to the findings, top-performing project managers have well-rounded skills in the areas of leadership, communication, technical proficiency and overall job knowledge.

Practical implications

The outcomes of this study can help construction organizations focus their talent-development programs on the skills most associated with PMs being top performers.

Originality/value

This study provides construction organizations with a comprehensive performance-measuring construct to focus their talent-development programs on the skills most associated with top-performing project managers. Researchers can use this study as a foundation for further understanding how performance is related to various construction professions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 October 2023

Li Ma and Yongqiang Lu

Existing research on innovation has mainly focused on how to promote technological innovation in megaprojects and management innovation (MI) in megaprojects is still an unknown…

Abstract

Purpose

Existing research on innovation has mainly focused on how to promote technological innovation in megaprojects and management innovation (MI) in megaprojects is still an unknown research field. The purposes of this study are to examine the effect of MI on megaproject performance and how the top management team (TMT) regulatory focus affects the use of MI in projects. At the same time, the moderating effects of project uncertainties are also tested.

Design/methodology/approach

On the basis of an explorative/exploitative ambidextrous analysis framework, this study divides MI into two dimensions: explorative and exploitative MI, and integrates the theoretical perspectives of the TMT regulatory focus and project uncertainties into a research model. Taking 314 responses from megaprojects’ TMTs in China as research data, this study empirically tests the above model.

Findings

Results show that exploratory MI has a U-shaped relationship with megaproject performance; whereas exploitative MI has an inverted U-shaped relationship with megaproject performance. The TMT promotion focus has a positive effect on exploratory and exploitative MI; and the TMT prevention focus has a negative effect on exploratory MI but has a positive effect on exploitative MI. Project uncertainties have a positive moderating effect on the positive relationship between TMT promotion focus and exploratory MI, whereas it has a negative moderating effect on the negative relationship between the TMT prevention focus and exploratory MI.

Originality/value

By empirically measuring the relationship between two types of MIs and megaproject performance, this study clarifies the differential mechanism of the effect of different MIs on megaproject performance. This study also examines the MI of megaprojects from the perspective of the TMT regulatory focus and expounds how changes in uncertainties affect the relationship between the TMT regulatory focus and MI.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 11 August 2023

Guus Keusters, Frédérique Batelaan, Froukje SleeswijkVisser, Erik-Jan Houwing and Hans Bakker

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design…

1001

Abstract

Purpose

The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design processes that are more closely linked to the relevance of the project context, it is hypothesised that empathic abilities could play an important role in the performance of civil engineering projects. Therefore, this study aims to investigate whether performance can be improved by focusing on empathic abilities during the integrated design phase.

Design/methodology/approach

Semi-structured in-depth interviews with experts were conducted to explore the relevance of empathic abilities and their interaction with performance in a real-life infrastructure project. The project team’s empathy level was measured by means of a survey using Davis’ Interpersonal Reactivity Index method. Finally, differences between expected and measured levels of empathy were analysed.

Findings

The results provide insights into how empathic abilities interact with performance. The measurement indicates that, on average, professionals in the civil engineering industry score relatively low on empathy. In addition, differences were identified between the expected distribution and the measured empathy levels of the team, implying a potential for improvement, in particular by increasing the empathic abilities of the project management and increasing gender diversity.

Originality/value

To the best of the authors’ knowledge, this study is the first to investigate a relationship between empathy and the performance of civil engineering projects. The results provide initial insights into the empathic ability of civil engineering project teams and the potential of empathy to improve performance. Furthermore, from an empathy perspective, this study advocates increasing the gender diversity of project teams to improve performance.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 August 2023

Jorge Armando López-Lemus, María Teresa De la Garza Carranza, Monica Lucia Reyes-Berlanga and Jose Guadalupe Lopez-Lemus

This study aims to identify the influence exerted by the performance of human resources (HR) through effectiveness and efficiency in the success of business projects in Mexico.

Abstract

Purpose

This study aims to identify the influence exerted by the performance of human resources (HR) through effectiveness and efficiency in the success of business projects in Mexico.

Design/methodology/approach

The methodological design was quantitative, explanatory, observational and transversal, where a sample of 502 was used. A structural equation model (SEM) was developed using the statistical software AMOS v25 to test the hypothesis. SPSS v25 was used for data analysis. Regarding the goodness and fit indices of the SEM, χ2 = 388.83/df = 143; χ2/df = 2.71; p < 0.001; GFI = 0.92; AGFI = 0.91; CFI = 0.96; TLI = 0.95; NFI = 0.94; IFI = 0.96; RMSEA = 0.05; RMR = 0.04; SRMR = 0.03, which turned out to be acceptable.

Findings

Through the results obtained through the SEM, it is shown that there is a positive and significant relationship between the performance of HR through their effectiveness (r = 0.65, p < 0.01) and efficiency (r = 0.64, p < 0.01) with respect to the success of the business projects. Likewise, the effectiveness of HR has a positive and significant influence on the efficiency (ß2 = 0.46; p < 0.001) and the success of business projects (ß3 = 0.89; p < 0.001) in Mexico. In the same way, efficiency positively and significantly influences the success of enterprises (ß4 = 0.35; p < 0.001) in Mexico.

Research limitations/implications

In this research, only the performance of the HR was assessed through efficiency and effectiveness as one of the variables that intervene in the development of the business project, and that is one of the main factors of analysis to achieve the success of the enterprise. In this sense, the results are limited to the extent that the findings can be generalized to business projects that are developed in different entities such as universities, incubators and other instances that promote the development of business projects and thereby guarantee success. In this sense, it is considered to carry out more research regarding these variables and others that can study the phenomenon and generate new scientific research.

Practical implications

HR performance is considered as one of the main factors that allow the success of business projects. However, some practical limitations are determined by the vision, strategies, as well as the orientation that entities such as universities, and incubators, among other organizations, determine to develop the business project and thus guarantee its success. Other practical implications lie in the leadership that the entrepreneur exercises in his/her work team and collaborators to generate synergy between them considering culture and identity, as well as the commitment to the business project.

Originality/value

The findings are relevant and of great value because they support entrepreneurship models, giving an alternative focus in the study to achieve success, specifically in the state of Guanajuato, which represents one of the main states that have with a greater number of ventures focused on the automotive, food, leather and footwear cluster, among other SMEs that promote business projects and is one of the main states of the Mexican Republic that contributes to the economic development of the region as well as the nation. Likewise, the study is relevant because there is currently not enough research focused on the variables analyzed on the success of business projects in the Mexican context.

Details

International Journal of Organizational Analysis, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 19 June 2023

Mershack Opoku Tetteh, Albert P.C. Chan, Amos Darko, Beliz Özorhon and Emmanuel Adinyira

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance…

Abstract

Purpose

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance benchmark is established. However, existing studies fall short of adequately providing a mutually acceptable benchmark for assessing the performance of ICJVs. This study aims to develop an adequate and suitable performance measurement framework for ICJVs.

Design/methodology/approach

A twofold structured questionnaire survey, supplemented by semi-structured interviews, was used to collect data from the practitioners of ICJVs hosted in the developing country of Ghana. The data were analyzed by using descriptive statistics, confirmatory factor analysis (CFA) and a hybrid-fuzzy logic approach.

Findings

A list of 30 performance indicators (PIs), defined by project performance, perceived satisfaction, company/partner performance, socio-environmental performance and performance of ICJV management, was validated and proved to be significant. Only 22 out of the 30 PIs, focusing on project efficiency, societal improvement and organizational goals are realized by the ICJV practitioners. Further, suitable determinants and viable quantitative ranges for measuring each PI are established to prevent different interpretations of the meanings of PIs and objectively express the level of success in quantitative terms. The results call for further investigation of the convergence between the practice of and research into some PIs (e.g. socio-environmental performance) and a range of different performance levels (PLs) in a more scientific manner.

Practical implications

This study not only advances the knowledge base and practice of performance measurement in ICJVs but could also assist stakeholders and decision-makers to assess, compare and monitor the performance of different ICJV projects on common grounds objectively.

Originality/value

This study not only comprehensively assessed PIs – what to measure – but also systematically determined suitable determinants – how to measure – for each PI.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 November 2022

Ahmad Shah Kakar, Abid Hasan, Kumar Neeraj Jha and Amarjit Singh

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource…

Abstract

Purpose

The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan.

Design/methodology/approach

The literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes.

Findings

This study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics.

Research limitations/implications

The exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only.

Practical implications

The construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects.

Originality/value

Given the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 October 2022

Prachi Vinod Ingle and Gangadhar Mahesh

The success of construction projects can be indicated by measuring their performance. For effective project performance (PP), the successful execution of a construction projects…

Abstract

Purpose

The success of construction projects can be indicated by measuring their performance. For effective project performance (PP), the successful execution of a construction projects is very important. A systematic review of the literature on performance areas and performance assessment models was undertaken. The purpose of this paper is to develop a mathematical formulation for construction PP areas to suit the Indian context by modifying the current project quarterback rating (PQR) model.

Design/methodology/approach

Based on the literature, the PQR model has not been validated for suitability in the Indian context. To validate the PQR model and modify the same for the Indian context, a survey instrument was used to collect data on performance areas and a multivariate data analysis technique was carried out to develop a modified model. Delphi technique was used to assign the weights for each performance metric in performance areas.

Findings

This study concluded the importance of three additional performance areas, namely, productivity, stakeholder satisfaction and environment for assessing PP for Indian construction projects. It also identified the interrelationship between the performance areas and the PP.

Practical implications

The developed modified PQR model (MPQR) will guide the concerned stakeholders to take corrective actions for improving the performance of construction projects.

Originality/value

The MPQR proposed in this paper covers ten areas and is a comprehensive single score that can be used to benchmark and compare performance over different projects to achieve continuous improvement.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 23 April 2024

Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…

Abstract

Purpose

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.

Design/methodology/approach

To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance,  and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.

Findings

The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.

Originality/value

This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2024

Muhammad Zada, Jawad Khan, Imran Saeed, Shagufta Zada and Zhang Yong Jun

The purpose of this study is to investigate the relationship between sustainable leadership and sustainable project performance. Specifically, the study aims to examine the…

Abstract

Purpose

The purpose of this study is to investigate the relationship between sustainable leadership and sustainable project performance. Specifically, the study aims to examine the mediating role of knowledge integration, examining how knowledge integration within an organization influences project outcomes. In addition, the study seeks to explore the moderating role of top management knowledge values, examining how the values and beliefs of top management influence the relationship between sustainable leadership and project performance.

Design/methodology/approach

A three-wave survey of 392 employees working in construction sector projects in Pakistan used both hierarchical regression analysis and Hayes’ PROCESS macro method to evaluate the hypotheses.

Findings

The study results show that sustainable leadership positively relates to sustainable project performance and knowledge integration mediating this relationship. In addition, the top management knowledge value moderates the indirect effect of sustainable leadership on sustainable project performance via knowledge integration.

Research limitations/implications

Although the model was tested using three-wave data, it is important to note that the data were obtained from a single source. Therefore, it is possible that common method bias may have influenced the results, and this cannot be disregarded.

Practical implications

Organizations seek to prioritize sustainability and integrate sustainability considerations into their project management processes. Organizations can achieve improved sustainable project performance by investing in sustainable leadership development, fostering a culture of knowledge sharing and learning, prioritizing top management support for sustainable performance and integrating sustainable considerations into project management processes.

Originality/value

The study’s grounding on organizational learning theory adds an original and valuable perspective to the relationship between sustainable leadership and sustainable project performance. This investigation is original, as it combines sustainable leadership, knowledge integration and the moderating role of top management knowledge value to understand their impact on sustainable project performance. This unique approach contributes to the literature by providing new insights into these relationships and mechanisms in the construction industry.

Details

Journal of Knowledge Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1367-3270

Keywords

1 – 10 of over 5000