Search results
1 – 10 of over 4000Bashir Tijani, Xiaohua Jin and Robert Osei-Kyei
Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor…
Abstract
Purpose
Due to the frenetic and dynamic working conditions ascribed to architecture, engineering and construction (AEC) project organizations, enormous research has addressed the poor mental health propensity of project management practitioners (PMPs). However, research has not considered the distant factors related to organizational design causing poor mental health. Therefore, this study addresses the problem by integrating institutional theory, agency theory and resource-based theory (RBT) to explore the relationship between organizational design elements: project governance, knowledge management, integrated project delivery, project management skills and mental health management indicators. Examples of mental health management indicators include social relationships, work-life balance and project leadership.
Design/methodology/approach
Purposive sampling method was adopted to collect survey data from 90 PMPs in 60 AEC firms in Australia. Structural equation modelling (SEM) was utilized to test the relationship between the variables.
Findings
The research found that project governance, knowledge management and integrated project delivery are positively correlated to mental health management indicators. However, the research finding suggests that project management skills have a negative impact on mental health management indicators.
Originality/value
The findings offer guidelines to AEC firms on achieving positive mental health management outcomes through concentration on project governance, knowledge management and integrated project delivery. It further calls for a reconsideration of existing project management skills causing poor mental health management outcomes.
Details
Keywords
Ata Ul Musawir, Mohd Suhaimi Mohd-Danuri and Saipol Bari Abd-Karim
This paper examines how expert practitioners define project governance and develop a project governance system that enables strategy implementation through projects.
Abstract
Purpose
This paper examines how expert practitioners define project governance and develop a project governance system that enables strategy implementation through projects.
Design/methodology/approach
Semi-structured interviews were conducted with project governance experts and analyzed the data using thematic analysis. Subsequently, based on the stratified ontology of critical realism, retroductive theoretical triangulation was employed to explain the themes identified using five emergent theoretical perspectives.
Findings
By integrating the themes extracted from the data with the emergent theoretical perspectives, a framework was developed outlining the general process through which practitioners make sense of the concept of project governance, formulate an appropriate project governance system for their respective organizations and manage its evolution over time. Furthermore, a holistic approach to project governance was proposed that spans the entire investment life cycle of projects and enables the implementation of strategy through projects.
Practical implications
This study attempts to make sense of the diverse interpretations of the concept of project governance adopted by practitioners. It further summarizes valuable insights from expert practitioners for formulating and enacting effective project governance systems.
Originality/value
This study contributes to the governance-as-practice perspective and the growing stream of literature that views projects as investments. The project governance system is positioned as the steward of an organization's investments in projects.
Details
Keywords
Kai Liu, Yuming Liu and Yuanyuan Kou
Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important…
Abstract
Purpose
Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important role in the construction of megaprojects, but the relationship between project governance and organizational collaboration is unclear. The purpose of this study is to explore the role paths of different project governance mechanisms in influencing the collaborative behaviors of stakeholders and collaborative performance and to elucidate the mechanism of project governance on inter-organizational collaboration.
Design/methodology/approach
A conceptual framework was developed based on a comprehensive literature review, termed the structural equation model (SEM). The hypotheses of the model were tested based on data obtained from a questionnaire survey of 235 experts with experience in megaprojects within the construction industry in China.
Findings
The results show that project governance positively contributes to the collaborative behavior of megaproject stakeholders and the collaborative performance of the project team. Collaborative behavior acts as a partial mediator between project governance and the collaborative performance of the megaproject inter-organization alliance. The complexity of the project modulates the relationship between the governance mechanism of the project and the collaborative behavior of the stakeholders, which affects the collaborative performance of the megaproject inter-organization alliance.
Originality/value
The findings provide theoretical and practical implications for promoting positive collaborative behavior among stakeholders in megaproject selection and improving the collaborative performance of megaproject inter-organization alliances.
Details
Keywords
Mohamad Tannir, Grant Mills, Ilias Krystallis and Jas Kalra
This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and…
Abstract
Purpose
This study aims to further the understanding of multi-level analysis in inter-organisational relationships by investigating the interplay of governance, cooperation and coordination in inter-organisational projects (IOPs) on sub-system and project levels.
Design/methodology/approach
The authors use the Viable Systems Model as a framework to analyse inter-organisational project governance, cooperation and coordination by adopting a multiple-case study.
Findings
The findings illustrate how governance and coordination mechanisms exhibit a filter-down effect on lower sub-systems while cooperation influence is confined within each sub-system. While remarking the importance of specific sub-systems on the overall project performance, the interplay of governance, cooperation and coordination across sub-systems appears to be complex, with governance influencing cooperation and coordination, whereas cooperation and coordination influence each other with an incremental effect.
Originality/value
This study defines two propositions that explain how multiple levels of analysis (project and sub-systems) can support the governance of large inter-organisational projects. The authors elaborate theory on the interplay of inter-organisational project governance, cooperation and coordination.
Details
Keywords
Chunhao Li, Yuping Zhao and Wei Feng Chen
This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance…
Abstract
Purpose
This study aims to investigate the dual effects of commitment-based governance on the relationship between formal control and public–private partnership (PPP) project performance. Formal control and relationship governance are two primary forms of inter-organizational governance that affect project performance. However, little is known about the interplay between formal control and commitment and its effect on PPP projects. More specifically, previous studies have failed to distinguish the function routes of relationship governance resulting from different types of formal control (process and outcome control).
Design/methodology/approach
This study adopts a questionnaire survey to empirically investigate the mechanism that commitment-based governance influences the relationship between formal control and PPP performance. After collecting data from public and private sector professionals involved in 101 Chinese PPP projects, the theoretical framework proposed in this paper is verified by the empirical results of the hierarchical multiple regression analysis.
Findings
The results show that process control has an inverted U-shaped effect and outcome control has a significant positive influence on PPP project performance. Furthermore, commitment moderates the effect of formal control on PPP project performance by increasing the relevance of outcome control and mediates the inverted U-shaped relationship between process control and PPP project performance.
Practical implications
Managers should recognize that process control is a double-edged sword and prevent the overuse of process control. Managers should direct their attention toward efforts to improve the commitment, which allows for the effectiveness of outcome control strategies. Additionally, this study new measurement method for relationship governance suggests that managers should be aware of the difference in parties' perceptions of the relationship.
Originality/value
This study allows for a comprehensive understanding of the relationship governance-control nexus from a commitment perspective. The authors bring into light the dual role of commitment-based governance in the relationship between the two types of formal control and PPP project performance. Moreover, the new approach to measure relationship governance offers valuable insight into the measurement of variables about individual's perception.
Details
Keywords
Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng
The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…
Abstract
Purpose
The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.
Design/methodology/approach
This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.
Findings
The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.
Originality/value
This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.
Details
Keywords
Wenqian Guo, Wenxue Lu and Fei Kang
The understanding of how to mitigate opportunism in construction projects is still limited and conflicting. The complexity of causalities and interdependence among antecedents of…
Abstract
Purpose
The understanding of how to mitigate opportunism in construction projects is still limited and conflicting. The complexity of causalities and interdependence among antecedents of opportunism (transaction characteristics and governance mechanisms) is the major obstacle to current research. This study takes a holistic perspective to explore the different combinations of conditions that lead to high opportunism and low opportunism in project management.
Design/methodology/approach
Through 2 phases of the interview and questionnaire survey, the 91 valid survey data were collected from the buyer–seller relationships in construction projects and analyzed by adopting fuzzy-set qualitative comparative analysis.
Findings
A single transaction characteristic is rarely sufficient to explain opportunism, and combinations of different transaction characteristics and governance mechanisms (performance ambiguity, asset specificity, buyer's requirement certainty, informal control, and formal control) have different effects on opportunism. In the case of extremely unsatisfactory transaction characteristics, even the combination of formal and informal control cannot prevent high opportunism. The combination including low-formal control and high-asset specificity easily leads to high opportunism. Besides, performance ambiguity is a vital factor in mitigating high opportunism or achieving low opportunism.
Originality/value
Previous studies have always addressed the role of one or some factors independently and separately. This study is one of the first to explore the different combinations of conditions that result in high opportunism and low opportunism in project management based on transaction costs economics and agency theory.
Details
Keywords
Sahar Jawad, Ann Ledwith and Rashid Khan
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…
Abstract
Purpose
There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.
Design/methodology/approach
This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.
Findings
Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.
Practical implications
The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.
Originality/value
This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.
Details
Keywords
Bingsheng Liu, Juankun Li, Dan Wang, Henry Liu, Guangdong Wu and Jingfeng Yuan
This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs…
Abstract
Purpose
This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs. It examines the transmission pattern (i.e. the way in which network members react to each other) of the IFs network.
Design/methodology/approach
Literature review and interview were adopted to identify the IFs. Then, with the data collected from the interview in China, the social network analysis and interpretive structure model were synergised to examine the chain reaction, driving and dependent powers, and hierarchical structure of the identified IFs.
Findings
The results reveal that the cognition, institutional, financial and participation aspects are key barriers confronted by PPP sustainability, and the government plays a leading role in controlling factors causing sustainability-related problems in PPPs. Weak government leadership and institutional environment were identified as the most fundamental reasons triggering a chain of IFs, while project governance and management activities act as bridge nodes that play an intermediary role in the IFs network.
Research limitations/implications
This research contributes to the literature on PPP governance by (1) bridging the literature gap through the development of CGF for explaining the governance of PPP sustainability with a holistic view that considers both macro environment and operational project processes; and (2) identifying the transmission pattern of IFs network which uncovers the underlying dynamics causing the unsustainable operation of PPPs.
Practical implications
This research provides practitioners with a list of key checkpoints for preventing failure escalation, enables decision-makers to prioritise obstacle-mitigation efforts and develop a feasible process to control PPP operation, and offers management countermeasures to remove the key barriers impeding PPP sustainability.
Originality/value
This study is novel for adopting network-oriented techniques to quantify the relative importance of the IFs and examine the transmission pattern of the IFs system. Therefore, it visualises the complex underlying dynamics causing unsustainable PPP operation, identifies root and direct causes of PPP failures, and provides decision-makers with insights into sustaining PPP sustainability from a network-oriented perspective.
Details