Article
Publication date: 13 June 2023

Yi-Hsin Lin, Deshuang Niu, Yanzhe Guo and Ningshuang Zeng

This study examines how project uncertainties (environmental uncertainty and participant uncertainty) affect guanxi and contractual governance and assesses the mediating role of…

190

Abstract

Purpose

This study examines how project uncertainties (environmental uncertainty and participant uncertainty) affect guanxi and contractual governance and assesses the mediating role of guanxi governance between project uncertainty and contractual governance.

Design/methodology/approach

Data were collected in two stages from Chinese contractors. First, in-depth interviews were conducted with nine construction engineering project practitioners in different contracts as a pilot for questionnaire designing. Second, a cross-sectional questionnaire survey was conducted with professionals and practitioners of construction enterprises to collect primary data. Partial least squares structural equation modeling (PLS-SEM) was used to test seven hypotheses based on data collected from 198 respondents.

Findings

Project environmental uncertainty promotes the use of guanxi governance, while project participant uncertainty hinders it; the relationship between both types of uncertainty and contractual governance is the same as with guanxi governance. Furthermore, guanxi governance promotes contractual governance and partially mediates project environmental uncertainty and contractual governance and a complete mediating role between project participant uncertainty and contractual governance.

Research limitations/implications

As the interviewed samples are mainly from China, the study should be replicated using large representative samples from East Asian countries, such as Japan and South Korea, to gain a more comprehensive understanding of the influence of guanxi governance. Further, while the internal consistency reliability and convergent validity of the questionnaire data in this study align with the standards, a larger sample size would improve the reliability and validity of the research results and better represent the overall work situation of contractors, owners and public policymakers.

Originality/value

The results provide insights into project governance research and have implications for construction practitioners in deploying governance-related resources.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2024

Kai Liu, Yuming Liu and Yuanyuan Kou

Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important…

Abstract

Purpose

Inter-organizational collaboration is the organizational guarantee and key link to achieve the goals of megaproject management. Project governance has always played an important role in the construction of megaprojects, but the relationship between project governance and organizational collaboration is unclear. The purpose of this study is to explore the role paths of different project governance mechanisms in influencing the collaborative behaviors of stakeholders and collaborative performance and to elucidate the mechanism of project governance on inter-organizational collaboration.

Design/methodology/approach

A conceptual framework was developed based on a comprehensive literature review, termed the structural equation model (SEM). The hypotheses of the model were tested based on data obtained from a questionnaire survey of 235 experts with experience in megaprojects within the construction industry in China.

Findings

The results show that project governance positively contributes to the collaborative behavior of megaproject stakeholders and the collaborative performance of the project team. Collaborative behavior acts as a partial mediator between project governance and the collaborative performance of the megaproject inter-organization alliance. The complexity of the project modulates the relationship between the governance mechanism of the project and the collaborative behavior of the stakeholders, which affects the collaborative performance of the megaproject inter-organization alliance.

Originality/value

The findings provide theoretical and practical implications for promoting positive collaborative behavior among stakeholders in megaproject selection and improving the collaborative performance of megaproject inter-organization alliances.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

Yanhui Du, Jingfeng Yuan, ShouQing Wang, Yan Liu and Ningshuang Zeng

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation…

110

Abstract

Purpose

The information used for supervision by regulatory departments in public-private partnership (PPP) projects is primarily transmitted and processed by the PPP implementation department, which negatively impacts the information quality, leading to information asymmetry and undermining the overall effectiveness of supervision. This study aims to explore how to use blockchain to anchor the information used for supervision in PPP projects to the original information, to strengthen the oversight.

Design/methodology/approach

This paper adopts the principles of design science research (DSR) to design a conceptual framework that systematically organizes information along the information dissemination chain, ensuring the reliable anchoring of original information. Two-stage interviews involving experts from academia and industry are conducted, serving as formative and summative evaluations to guide the design.

Findings

The framework establishes a weak-centralized information organizing mode, including the design of governance community and on-chain and off-chain governance mechanisms. Feedback from experts is collected via interviews and the designed framework is thought to improve information used for supervision. Constructive suggestions are also collected and analyzed for further development.

Originality/value

This paper provides a novel example exploring the inspirations blockchain can bring to project governance, like exercising caution regarding the disorderly expansion of public sector authority in addressing information disadvantages and how to leverage blockchain to achieve this. Technical details conveyed by the framework deepen understanding of how blockchain benefits and the challenges faced in successful implementation for practitioners and policymakers. The targeted evaluation serves as rigorous validation, guiding experts to provide reliable feedback and richer insights by offering them a more cognitively convenient scenario.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 August 2022

Muhammad Waseem, Shahid Iqbal and Khalid Khan

The purpose of this study is to determine how project governance influences project success. According to the authors, such an effect is mediated by organizational support and…

Abstract

Purpose

The purpose of this study is to determine how project governance influences project success. According to the authors, such an effect is mediated by organizational support and project team cohesion. The direct and indirect effects of organizational support and project team cohesion provided helpful information. The authors’ objective is to contribute to the project management knowledge of how project team cohesion plays a significant role in project success.

Design/methodology/approach

Data were collected from 350 employees working in Pakistan’s oil and gas industry. Four prime oil and gas exploration companies were selected as samples based on their contribution to the revenue. SPSS v23 and AMOS v23 were used for constructing structural equation modeling and path analysis to examine the direct and indirect effects.

Findings

The results revealed that project governance is positively related to project success. Furthermore, organizational support and project team cohesion mediated the relationship between project governance and project success.

Originality/value

Team cohesion has been primarily a topic of interest in sports psychology literature, education and medical sciences. There is an expressed need to investigate team cohesion issues in the broad domain of organizational development, specifically the project management literature. This study contributed by discussing team cohesion in the project context. Second, project governance was investigated using the conservation of resources theory. The lens of intellectual capital was applied to examine intangible resources of project governance like rules, regulations and directives for project success.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Article
Publication date: 11 December 2023

Zehui Bu, Jicai Liu and Xiaoxue Zhang

The paper aims to elucidate effective strategies for promoting the adoption of green technology innovation within the private sector, thereby enhancing the value of public–private…

Abstract

Purpose

The paper aims to elucidate effective strategies for promoting the adoption of green technology innovation within the private sector, thereby enhancing the value of public–private partnership (PPP) projects during the operational phase.

Design/methodology/approach

Utilizing prospect theory, the paper considers the government and the public as external driving forces. It establishes a tripartite evolutionary game model composed of government regulators, the private sector and the public. The paper uses numerical simulations to explore the evolutionary stable equilibrium strategies and the determinants influencing each stakeholder.

Findings

The paper demonstrates that government intervention and public participation substantially promote green technology innovation within the private sector. Major influencing factors encompass the intensity of pollution taxation, governmental information disclosure and public attention. However, an optimal threshold exists for environmental publicity and innovation subsidies, as excessive levels might inhibit technological innovation. Furthermore, within government intervention strategies, compensating the public for their participation costs is essential to circumvent the public's “free-rider” tendencies and encourage active public collaboration in PPP project innovation.

Originality/value

By constructing a tripartite evolutionary game model, the paper comprehensively examines the roles of government intervention and public participation in promoting green technology innovation within the private sector, offering fresh perspectives and strategies for the operational phase of PPP projects.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 25 May 2023

Xuewei Li, Jingfeng Yuan, Xuan Liu, Guangqi Wang and Qian-Cheng Wang

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance…

Abstract

Purpose

With the continuous improvement of public–private partnership (PPP) projects, the participants' value creation goals are not only limited to achieving the basic performance objectives but also to realising value added. However, the effect of traditional contract management on realising the value creation objectives of PPP projects is limited. According to the view of multifunctional contract, joint-contract functions that integrate contract control and flexibility are likely to be effective in enhancing the value creation of PPP projects. This study aims to explore the effects of joint-contract functions on PPP project value creation and relevant influencing mechanism by investigating the mediating effect of in-role behaviour and extra-role behaviour.

Design/methodology/approach

After collecting 258 valid questionnaires from PPP professionals in China, this study used structural equation modelling to validate the hypotheses.

Findings

Contract control and flexibility can improve PPP project value creation. Specifically, contract control improves the achievement of the basic contract objectives of PPP projects, whereas contract flexibility enhances the achievement of the value-added of PPP projects. Moreover, only in-role behaviour mediates the effect of contract control on value creation. In addition, the mediating effect of extra-role behaviour on the impact of contract flexibility on value creation is stronger than that of in-role behaviour. The mediating effect of in- and extra-role behaviour is mainly reflected in the realisation of basic and value-added performance, respectively.

Research implications

The findings of this study can help realise value creation in three ways. Firstly, new perspectives for PPP project value creation should be proposed by combining the improvement of contract objectives and the realisation of the participants' implicit demands. Secondly, the effects of different contract functions on value creation should be analysed instead of a single dimension of contractual governance. Thirdly, the mediating effects of different types of cooperation behaviour that may influence the relationship between contractual governance and value creation should be evaluated.

Originality/value

This study verifies the impacts of different contract functions on PPP project value creation. In addition, cooperative behaviour is embedded as a mediating variable, and the mediated transmission path from contract function to cooperative behaviour and further to PPP project value creation is systematically analysed.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 January 2024

Titus Ebenezer Kwofie, Michael Nii Addy, Daniel Yaw Addai Duah, Clinton Ohis Aigbavboa, Emmanuel Banahene Owusu and George Felix Olympio

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors…

Abstract

Purpose

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors that impact on success has become a notable setback. This study aims to delineate significant factors that can support decisions in affordable PPP public housing delivery.

Design/methodology/approach

Largely, a questionnaire survey was adopted to elicit insights from practitioners, policymakers and experts to develop an evaluative decision support model using an analytical hierarchy process and multi-attribute utility technique approach. Further, an expert illustration was conducted to evaluate and validate the results on the housing typologies.

Findings

The results revealed that energy efficiency and low-cost green building materials scored the highest weighting of all the criteria. Furthermore, multi-storey self-contained flats were found to be the most preferred housing typology and were significantly influenced by these factors. From the model evaluation, the scores on the factors of sustainability, affordability, cultural values and accountability were consistent across all typologies of housing whereas that of benchmarking, governance and transparency were varied.

Originality/value

The decision support factors captured varied dimensions of key factors that impact on affordable PPP housing that have not been considered in an integrated manner. These findings offer objective and systematic support to decision-making in affordable PPP housing delivery.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 May 2023

Xiaolin Li, Huimin Li, Ruirui Zhang, Yilin Yin, Shaonan Sun, Juan Bai and Ruihua Liu

The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors…

Abstract

Purpose

The purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors explore the mediating role of two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) in explaining the association between asymmetric trust and project management performance.

Design/methodology/approach

A theoretical model based on the research hypotheses proposed in this study was developed and a questionnaire survey was conducted with 271 professionals. The data collected was analyzed by the structural equation modeling (SEM) technique.

Findings

The results of this study indicate that there is a significant and negative association between asymmetric trust and project management performance. Moreover, two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) have different degrees of impact on improving project management performance. In addition, tacit knowledge sharing is a mediator between asymmetric trust and project management performance.

Research limitations/implications

The data used in this study is from Chinese scenarios, so the research conclusions and application effects based on this are bound to have certain regional limitations. Besides, there are many factors that affect project management performance improving, and the relationships among them are so complex. The theoretical model proposed in this study may not be fully considered. Therefore, follow-up researchers can consider bringing more suitable variables into their researches, so that the theoretical researches can be more in line with the actual project management practice, and the specific mechanism for improving project management performance can be explained more deeply.

Originality/value

This research's value is as follows: Firstly, this paper contributes to the trust and relational governance literature by expanding the research perspective of mutual trust to asymmetric trust. Specially, this research designs a measurement scale for asymmetric trust and then reveals the impact mechanism of it on project management performance, which will certainly promote research paradigm change of trust. Secondly, this research is beneficial to knowledge sharing literature in the construction management field by expanding the research scope of knowledge sharing from a cross-organizational perspective.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 July 2023

Mianzhi Yang, Qing Hui, Qingru Yang, Mengwei Fan and Xin Li

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public…

Abstract

Purpose

China has recently introduced a new audit law that aims to increase the scope of audit supervision and raise the standards for preventing risks in auditing national public projects. This paper presents a systematic research study on the causes of audit risks in national public projects and discusses the process by which these causes contribute to the emergence of such risks. Furthermore, the paper investigates the core risk sources in various types of national construction project audit. This paper aims to provide theoretical support for auditors of national construction projects in risk avoidance when conducting audits.

Design/methodology/approach

In this study, the authors carefully selected five national public audit projects from China and performed a comprehensive analysis of 85 relevant audit documentation. The textual analysis was conducted using Nvivo12 software, and the grounded theory approach was adopted for generalization purposes.

Findings

Based on the research results, the findings suggest that there are five key causes contributing to the audit risk of national construction projects: professional competence, risk awareness, management capacity, level of attention and deliberate fraud. The most critical factor identified is management capability, with 59.93% of the data supporting this view. This conclusion was based on an analysis of state-owned enterprises, administrative organs and public institutions. Building upon this, a framework titled “the mechanism of audit risk factors with management capability as the core” was constructed.

Originality/value

This paper employs qualitative analysis methods to examine national construction projects in China, contributing new literature to the theoretical study of audit risk management. The article also provides practical recommendations for auditors on how to mitigate audit risks and improve the quality of audit services in national project governance.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988