1 – 10 of 992Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad
This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…
Abstract
Purpose
This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.
Design/methodology/approach
To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance, and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.
Findings
The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.
Originality/value
This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.
Details
Keywords
Mansoor Ahmed and Lorenzo Lucianetti
The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage…
Abstract
Purpose
The research study provides empirical insights on the relationship between entrepreneurial leadership (EL), entrepreneurial passion for founding (EPF), entrepreneurial bricolage (EB) and project success (PS), in the case of freelancers. The study aims to get a better understanding of whether freelancers, who behave like entrepreneurial leaders, can successfully complete projects through EB.
Design/methodology/approach
The study collected data from 209 freelancers through snowball sampling, in two waves, with a time-lag of fourteen days, to better examine the causality of variables. Data were analyzed by Model No. 4 and 7 (i.e. mediation and moderation, respectively) of Process macro.
Findings
Drawing on the effectuation theory, the results show that EB mediates the relationship between EL and PS and EPF moderates this relationship.
Practical implications
The freelancers can formally establish businesses later, after knowing whether they can complete these new types of projects. These online freelancing platforms can provide special services to freelancers who first want to test their skills on unrelated projects. In sum, the paper suggests that freelancers can be successful entrepreneurial leaders.
Originality/value
The EL, EPF, EB and PS are studied in the context of the informal sector, i.e. freelancing, which is the emerging working style in the world. It provides an in-depth understanding of phenomena in freelancers that lacks background literature.
Details
Keywords
Mahmud Akhter Shareef, Yogesh K. Dwivedi, Md. Shazzad Hosain, Mihalis Giannakis and Jashim Uddin Ahmed
This study has conducted exploratory research to understand who should comprise the members of a resilient supply chain for promoting an entrepreneurial ecosystem of a startup…
Abstract
Purpose
This study has conducted exploratory research to understand who should comprise the members of a resilient supply chain for promoting an entrepreneurial ecosystem of a startup project and to determine the mechanisms for the balanced coexistence of all stakeholders. This is necessary to ensure mutual benefits for all stakeholders, each of whom has multidimensional interests. Additionally, this supply chain must be able to withstand any potential disruption risks.
Design/methodology/approach
This research has employed a mixed-design approach. In this context, the study conducted an extensive qualitative and quantitative investigation, including 30 interviews and a survey involving 180 potential stakeholders in this supply network, respectively in the capital city of Bangladesh, Dhaka. The analysis of the interviews utilized principles of matrix thinking, while structural equation modeling (SEM) through LISREL was employed to understand cause-and-effect relationships.
Findings
Network, platform and governance—these three independent constructs have the potential to contribute to the dependent construct, a resilient supply chain, aimed at promoting an entrepreneurial ecosystem for startup projects. It has been revealed that the management of such projects depends on the rules and regulations within the ecosystem. An excellent governance mechanism is essential for this purpose. To facilitate coexistence, the establishment of a platform is crucial, where cooperation among all members is mandatory.
Practical implications
For practitioners, three distinctive but closely interdependent issues are explored and resolved in this philanthropic study. It has unfolded the elements of any startup project with essential settings.
Originality/value
The identification of the structural dynamics of potential stakeholders within the entrepreneurial ecosystem of startups is largely absent in existing literature. Therefore, there is a need to comprehensively investigate the entire network, including their roles, responsibilities and associations. This study makes a significant and novel contribution to the existing literature. Academics and practitioners alike have ample opportunities to learn from this new aspect of relationships across three distinct areas: the entrepreneurial ecosystem, startup projects and the development of a resilient supply chain.
Details
Keywords
Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh
In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…
Abstract
Purpose
In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.
Design/methodology/approach
A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.
Findings
The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.
Originality/value
This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.
Details
Keywords
Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…
Abstract
Purpose
Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.
Design/methodology/approach
Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.
Findings
The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.
Originality/value
Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.
Details
Keywords
Jayesh Prakash Gupta, Hongxiu Li, Hannu Kärkkäinen and Raghava Rao Mukkamala
In this study, the authors sought to investigate how the implicit social ties of both project owners and potential backers are associated with crowdfunding project success.
Abstract
Purpose
In this study, the authors sought to investigate how the implicit social ties of both project owners and potential backers are associated with crowdfunding project success.
Design/methodology/approach
Drawing on social ties theory and factors that affect crowdfunding success, in this research, the authors developed a model to study how project owners' and potential backers' implicit social ties are associated with crowdfunding projects' degrees of success. The proposed model was empirically tested with crowdfunding data collected from Kickstarter and social media data collected from Twitter. The authors performed the test using an ordinary least squares (OLS) regression model with fixed effects.
Findings
The authors found that project owners' implicit social ties (specifically, their social media activities, degree centrality and betweenness centrality) are significantly and positively associated with crowdfunding projects' degrees of success. Meanwhile, potential project backers' implicit social ties (their social media activities and degree centrality) are negatively associated with crowdfunding projects' degrees of success. The authors also found that project size moderates the effects of project owners' social media activities on projects' degrees of success.
Originality/value
This work contributes to the literature on crowdfunding by investigating how the implicit social ties of both potential backers and project owners on social media are associated with crowdfunding project success. This study extends the previous research on social ties' roles in explaining crowdfunding project success by including implicit social ties, while the literature explored only explicit social ties.
Details
Keywords
Salim Elwazani and Sara Khorshidifard
This study examines the public participation in the implementation of the Historic Urban Landscape (HUL), a United Nations Educational, Scientific and Cultural Organization…
Abstract
Purpose
This study examines the public participation in the implementation of the Historic Urban Landscape (HUL), a United Nations Educational, Scientific and Cultural Organization (UNESCO) approach for urban development. HUL has six Critical Steps and four Tools Categories relating to community engagement, knowledge and planning, regulatory system and financial instruments. The HUL public participation component has materialized variably across the adopting cities, challenged by the local implementation capacity. In response, we have singled out two research questions revolving around the participants’ characteristics and participation methods.
Design/methodology/approach
This study instrumentalizes case studies as a research methodology and thematic literature as a theoretical context. The HUL projects for Ballarat, Australia and Cuenca, Ecuador have been selected as sources of published information because they exhibit comparative differences in completing community engagement. We have compared the community engagement accounts of the two cities.
Findings
The Ballarat and Cuenca HUL project accounts point out to commonalities and variances in responding to the HUL public participation mandate. The findings for the participants’ characteristics involve project setting, participants categories and participants empowerment; the findings for the participation methods involve initial preparation, domestic and international expertise and public conversation.
Originality/value
The results of the study help define public participation practices in HUL project implementations. The results present an opportunity for city officials, HUL project planners and field administrators for making informed decisions particularly in relation to the two public participation domains, the participants’ characteristics and the engagement methods.
Details
Keywords
Li Ma and Yongqiang Lu
The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity…
Abstract
Purpose
The purpose of this study is to examine how construction project managers’ conflict management styles (CMSs) affect project team resilience from the perspective of social identity theory.
Design/methodology/approach
This study adopted a cross-sectional survey design and collected paired data from 110 construction project managers and 474 employees in China. Based on the data collected, the authors tested the proposed hypotheses using hierarchical regression analysis.
Findings
The results show that a project manager’s cooperative CMS positively affects team resilience, and a project manager’s competitive and avoidant CMS negatively affects team resilience. Team followership plays a mediating role in this relationship. The team power distance moderates the effects of a project manager’s cooperative and avoidant CMSs on team followership.
Originality/value
This paper enriches the existing literature on conflict management in construction projects and have potential guiding significance and application value for team resilience management practices.
Details
Keywords
Mariam Bader, Jiju Antony, Raja Jayaraman, Vikas Swarnakar, Ravindra S. Goonetilleke, Maher Maalouf, Jose Arturo Garza-Reyes and Kevin Linderman
The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six…
Abstract
Purpose
The purpose of this study is to examine the critical failure factors (CFFs) linked to various types of process improvement (PI) projects such as Kaizen, Lean, Six Sigma, Lean Six Sigma and Agile. Proposing a mitigation framework accordingly is also an aim of this study.
Design/methodology/approach
This research undertakes a systematic literature review of 49 papers that were relevant to the scope of the study and that were published in four prominent databases, including Google Scholar, Scopus, Web of Science and EBSCO.
Findings
Further analysis identifies 39 factors that contribute to the failure of PI projects. Among these factors, significant emphasis is placed on issues such as “resistance to cultural change,” “insufficient support from top management,” “inadequate training and education,” “poor communication” and “lack of resources,” as primary causes of PI project failures. To address and overcome the PI project failures, the authors propose a framework for failure mitigation based on change management models. The authors present future research directions that aim to enhance both the theoretical understanding and practical aspects of PI project failures.
Practical implications
Through this study, researchers and project managers can benefit from well-structured guidelines and invaluable insights that will help them identify and address potential failures, leading to successful implementation and sustainable improvements within organizations.
Originality/value
To the best of the author’s knowledge, this paper is the first study of its kind to examine the CFFs of five PI methodologies and introduces a novel approach derived from change management theory as a solution to minimize the risk associated with PI failure.